Responds to IE Bulletin 82-04 Re Bunker-Ramo Electrical Penetrations.Electrical Penetrations at Facilities Mfg by Viking Corp.No Bunker-Ramo Penetrations Installed
ML20064L628
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 01/12/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, NUDOCS 8302150327
Download: ML20064L628 (1)


Text

_ _

e DUKE POWER GOMPANY .;

P.O. HOx 33180

~

CitAHLOTTE, N.C. 28242 HALH. TUCKER TELEPHONE m5"2."l271, January 12 1983 , c.

b .lM! dl ^ 0 33 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Mr. O'Reilly:

In response to IE Bulletin 82-04 dated December 3, 1982, Duke Power Company has determined that no Bunker Ramo electrical penetrations are installed or are planned to be installed in safety related systems at Oconee Nuclear Station.

The Oconee electrical penetrations were manufactured by the Viking Corporation, and penetrations supplied by the D. G. O' Brian Corporation are planned for use in the Oconee Standby Shutdown Facility (SSF) . In accordance with item 5 of the subject bulletin, no further action is needed for Oconee Nuclear Station.

I declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge, executed on January 12, 1983.

Very truly yours, C

di _ _

Hal B. Tucker JFN/php cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC Resident Inspector Oconee Nuclear Station Mr. E. L. Conner, Jr.

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission i

Washington, D. C. 20555

^

8302150327 830112 PDR ADOCK 05000269 O PDR