ML20064F765

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1994 for Millstone Unit 3
ML20064F765
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1994
From: Bornt F
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20064F755 List:
References
NUDOCS 9403150433
Download: ML20064F765 (4)


Text

_ - - ~ . . . . . .

, i c

l

    • "*" NRC DPERATING STATUS REPORT COMPLETED BY REACTOR ENGINEERING *******

4

1. DOCKET.... 50-423 OPERATING STATUS
2. REPORTING PER10J... FEBRUARY 1994 OUTAGE + ONLINE HOURS... 0.0 + 672.0 = 672.0
3. UTILITY C0NTALT.................F. W. Bornt 203-447-1791 x4823 **********"*
4. LICENSED THERMAL P0WER......................................... 3411
  • MILLSTONE *
5. NAMEPLATE RAT I NG (GROSS MWE ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,253 MW
  • UNIT 3 *
6. DESIGN ELECTRICAL RATING (NET MWE).............................. 1,153.6 ***"""**"
7. MAXIMUM DEPENDASLE CAPACITY (CROSS MWE)......... .............. 1,184.2
8. MAXIMUM DEPENDABLE CAPACITY (NET MWE)........................... 1,137.0
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, REASONS ARE...........

N/A

10. POWER LEVEL TO WHICH RESTRICTED, IF ANY (WET MWE).. ... ........N/A
11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33332 3322323E2222 E322E4E2333333E33E
12. HOURS IN REPORTING PERIOD 672.0 1,416.0 68,856.0
13. NUMBER OF HOURS THE REACTOR WAS CRITICAL 672.0 1,416.0 50,729.9
14. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 6,466.5
15. HOURS GENERATOR ONLINE 672.0 1,416.0 49,653.6
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
17. GROSS THERMAL ENERGY GENERATED (MWH) 2,288,301.0 4,707,082.0 161,992,188.1
18. GROSS ELECTRICAL ENERGY GENERATED (MWH) 798,237.0 1,632,427.5 55,800,072.6 l
19. NET ELECTRICAL ENERGY GENERATED (MWH) 767,142.3 1,566,705.5 53,033,311.2
20. UNIT SERVICE FACTOR 100.0 100.0 72.1 t
21. UNIT AVAILABILITY FACTOR 100.0 100.0 72.1
22. UNIT CAPACITY FACTOR (USING MDC NET) 100.4 97.3 67.6
23. UNIT CAPACITY FACTOR (USING DER NET) 99.0 95.9 66.8
24. UNIT FORCED OUTAGE RATE 0.0 0.0 16.8
25. UNIT FORCED OUTAGE HOURS 0.0 0.0 10,004.9 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH)........ . ...

N/A IF CURRENTLY SHUTDOWW, ESTIMATED STARTUP DATE......W/A l

1 9403150433 940308 i PDR ADDCK 05000423 l R PDR I l

. ~ _ _ _ . -

A VER A G E D AILY UNIT POW ER LEVEL DOCKET NO: 50-423 UNIT: MILLSTONE UNIT 3 DATE: March 3.1994 COMPLETED BY: F. W. Bornt 203-447-1791 x 4823 MONTH February 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1142 16 109g 2 1141 17 1144 _

3 1143 18 1144 4 1143 19 1142 5 1142 20 1148 6 1142 21 1140 ,

7 1143 22 1149 8 1141 23 1143 9 1141 24 1143 10 1145 25 1142 11 1142 26 1143 12 1142 27 1143 13 1144 28 1148 14 1144 29 15 1144 30 31

U N I T S II U T D O W N S A N D P O W E R R E D U C T I O N S .

DOCKET NO: 50-423 .

UNIT: MILLSTONE UNIT 3 DATE: March 3.1994 COMPLETED BY: F. W. Bornt TELEPHONE: 203-4471791 x'4823 Number Date Type Duration Reason Method of Licensee System Component Cause and Corrective Action to Prevent (1) (Hours) (2) Shutting Event Report Code Code Recurrence Down the Number (4) (5)

Reactor (3)

None l_; Tvoe: 2.; Reasons: 3; Method 4: IEEE Standard 805-1984 F: Forced A Equipment Failure (Explain) 1 Manual S: Scheduled B Maintenance or Test 2 Manual Scram 5: IEEE Standard 803A-1983 C Refueling 3 Automatic Scram D Regulatory Restriction 4 Continued from Previous Month E Operator Training & License 5 Power Reduction Exam (Duration = 0)

F Administrative 9 Other (Explain)

G Operational Error (Explain)

H Other l

i

  • 1 R EFU ELING IN FOR M ATIO N REO U EST Febniary 1994 l
1. Name of facility: hiillstone 3.
2. Scheduled date for next refueling shutdown: May. 27.1995 i l
3. Scheduled date for restart following refueling: August 10.1995 ,

1

4. Will refueling or resumption of operation thereafler require a technical specification change or other license amendments?  ;

No

5. Scheduled date for submitting licensing action and supporting information.  !

l N/A l l

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:

l None

]

-l

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: l (a): 193 (b): 332
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present size - 756.

No increase requested.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

End of cycle 5.