ML20063B534

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,proposing Changes to Ts,Which Would Temporarily Waive Two Year Maximum Surveillance Interval for Type C Test (Local Leak Rate Test) of Shutdown Cooling Isolation Valves
ML20063B534
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/11/1994
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063B536 List:
References
JPN-94-001, JPN-94-1, JPTS-93-022, JPTS-93-22, NUDOCS 9402010018
Download: ML20063B534 (2)


Text

. .

m u suee

. Wh te Pla ns. New York 10601

  • 914 081 6846
  1. b NewYorkPower n .,,, e o... ,.

4# Authority =;g;;llr January 11,1994 l JPN-94-001 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 l Washington, DC 20555 l

l

SUBJECT:

James A. FitzPatrick Nuclear Power Plant l Docket No. 50-333 i Exemption from 10 CFR 50 Appendix J and Proposed Technical Specification Change Regarding_QgatainmenLt.c_ak Rate _Tes_ti.ng_(JPTS-93-022) l l In accordance with 10 CFR 50.12 and 50.90, the Authority requests an exemption from i 10 CFR 50, Appendix J, and an amendment to the James A. FitzPatrick Technical l Specifications. This exemption and amendment would temporarily waive the two year l maximum surveillance interval for the Type C test (local leak rate test) of the shutdown cooling isolation valves (10MOV-17 and 10MOV-18). The waiver would permit deferring this

test until the next refueling outage, currently scheduled for the end of November 1994.

10 CFR 50 Appendix J ano T9chnical Specification 4.7.A.2.e(5) require the i containment isolation valves to be leak-rate tested during each refueling outage, but at intervals of not greater than two years. As a result of the extended 1991-1993 outage, and the length of the current operating cycle, tests of all containment isolation valves are due prior to the start of the next refueling outage. Two mid-cycle outages were scheduled, in part, to accommodate the testing of these valves, except for the shutdown cooling isolation valves.

The shutdown cooling isolation valves cannot be removed from service during a non-refueling outage to accommodate a leak-rate test since its associated system is needed to remove reactor decay heat. The reliability of the isolation valve design, and the very low probability that the shutdown cooling system penetration would result in a pathway for leakage to the reactor building, as discussed in this application, provides justification for this one-time schedular exemption.

The Authority requests that this exemption request and amendment application be

, approved prior to the spring 1994 surveillance / maintenance outage, currently scheduled to begin on April 2,1994.

The signed original of the Application for Amendment to Operating License is enclosed for filing. Attachment I to this application contains the request for exemption from 10 CFR 50, Appendix J, Section Ill.D.3. Attachments ll and 111 of this application contain the proposed change to the Technical Specifications, and the associated Safety Evaluation.

9402010018 940111 n ?. n 1 "10 PDR ADOCK 05000333 P PDR

Al i \

a

A copy of this application and the associated attachments is being provided to the designated New York State official in accordance with 10 CFR 50.91.

If you have any questions, please contact Mr. J. A. Gray, Jr. ,

Very truly yours,

,gg' /tv nx .w hic ,

afpn E. eed

\'

cc: Regional Administrator U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident inspector U. S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. Brian C. McCabe  !

Project Directorate 1-1 Division of Reactor Projects-l/II i U. S. Nuclear Regulatory Commission Mail Stop 14 B2 l Washington, DC 20555  ;

Ms. Donna Ross

2 Empire State Plaza l 16*' Floor Albany, NY 12223 l.

{

L f