HL-4477, Forwards Rev 12B to FSAR for Ei Hatch Nuclear Plant Units 1 & 2 & Rev 9B to Ei Hatch Nuclear Plant Units 1 & 2 Fire Hazards Analysis

From kanterella
(Redirected from ML20063A785)
Jump to navigation Jump to search
Forwards Rev 12B to FSAR for Ei Hatch Nuclear Plant Units 1 & 2 & Rev 9B to Ei Hatch Nuclear Plant Units 1 & 2 Fire Hazards Analysis
ML20063A785
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/13/1994
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063A786 List:
References
HL-4477, NUDOCS 9401270017
Download: ML20063A785 (2)


Text

- " Georgb Puwer Company .

"#- ' ~ 40 inverrass Center Parkway p ^

. Post Offica Box 1295 4 Birmingham, Alabams 3520t -

iT Telephone 205 877-7279 y i _

J.T. s.ckham ar. Georgia Power Vice President - Nuclear Hatch Project t!e southern akurc syatem January 13, 1994 ,

b ~

Decket Nos. 50-321 HL-4477 50-366 000010 U.S. Nuclear Regulatory Commission A'lTN: Document Contrcl Desk i- Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Operating Licenses DPR-57, NPF-5 Ouarterly FSAR and Fila Amendments Gentlemen:

In accordance with the provisions of 10 CFR 50.71, Georgia Power Company hereby submits 1 signed original and 10 copies of each quarterly amendment to the Final Safety Analysis Reports (FSARs) (Revision 12B) and the Fir Tzards Analysis and Fire Protection Program (Fila) (Revision 9B) for Plant Hatch Units 1 and 2.

In accordance with 10 CFR 50.71(e), Mr. J. T. Beckham, Jr. states he is a Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and to the best of his knowledge and belief, the

'information contained in each of the enclosed FSAR and FHA amendments accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.'

GEORGIA POWER COMPANY BY: .3' J. T.-lleckham, Jr. g/

n Swom to and suburibel before me daythisofIS<bQW 1991.

h& h. / ~

Notary Public ,

My Commission Eghs Ing. 8.1905 i SIU'/sp

Enclosures:

1. Plant Hatch Unit 1 FSAR Amendment 12B
2. Plant Hatch Unit 2 FSAR Amendment 12B
3. Plant Hatch Units 1 and 2 FHA Amendment 9B c 1 n .q ,2 Uu 3 I9

. c: '(See next page.) /

9401270017 940113 .IE (O \$

r PDR - ADOCK 05000321 Li

-K P DR -- . gj kg

GeorgiaPower d U.S. Nuclear Regulatory Commission Page 2 January 13, 1994 c: Georgia Power Company (w/o)

Mr. H. L Sumner, Nuclear Plant General Manager NORMS U.S. Niclear Regulatory Commission. IVashington. D.C. (w/o)

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reeulatory Commission. Reelon 11 Mr. S. D. Ebneier, Regional Administrator  !

Mr. L D. Wert, Senior Resident Inspector - Hatch '

State of Georvia (w/o) l Mr. J. D. Tanner, Commissioner - Department of Natural Resources l

l l

1 l

I l

l lit 4477 000010 700775 .