0CAN099007, Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07

From kanterella
(Redirected from ML20059J999)
Jump to navigation Jump to search
Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07
ML20059J999
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/14/1990
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To: Perkins K
Office of Nuclear Reactor Regulation
References
0CAN099007, CAN99007, GL-89-12, GL-90-07, GL-90-7, NUDOCS 9009210105
Download: ML20059J999 (4)


Text

i.

.; .I x  !

,a ,

j

..., ' a.< Int a,...,., ,.u.

Rane 3.Bx 137G

., i, . 1

$ RJS% M d 6R 72S31  !

Ts?5014 % 3100 i I

September 14, 1990 i OCAN899007 U. S. Nuclear Regulatory Commission Mr. Kenneth E. Perkins Jr., Chief Operator Licensing Branch j OWFN-10D 22  ;

Washington, DC 20555

Subject:

Arkansas Nuclear One - Units 1 & 2  :'

Docket Nos. 50-313 and 50-368 License Nos.'DPR-51 and NPF-6 Response to Generic Letter 90-07 l Operator Licensing Examinations l

Dear Mr. Perkins:

l Generic Letter 90-07, Operator Licensing ' National Examination Schedule, j requested' an estimate of the number of candidates to be . examined . during-each site visit (as an update to our response to Generic Letter 89-12) as well as, dates for scheduled requalification examinations, and the number i of candidates we expect to participate in the Generic ~ Fundamental Examination Schedule. This information is provided in attachments to this l 1etter for Arkansas Nuclear One Unit 1 and Arkansas Nuclear One Unit 2 in the format of the enclosures to GL 90-07. ,

Very truly /ours,-

,_f.Jano~

James J. Fisicato <

l Manager, Licensing JJF/RBT/prm Attachments .I cc: Robert D. Martin, Regional Administrator.  ;

U. S. Nuclear Regulatory Commission  !

-Region:IV  ;

611 Ryan Plaza Drive, Euite 1000 >y Arlington, TX- 76011 U. S. Nuc1 car Regulatory Commission ,

' Document Control Desk  !

^

Mail Station P1-137 Washington, DC 20555 j Obi PDE*ANEN v

0h!? /1007 gg_

Kenneth E. Perkins Jr.

September 14, 1990 BCAN099007 ATTACHMENT 1 OPERATOR LICENSING EXAMINATION SCHEDULE UTILITY ANO NRC REGION 4 FY 1991 FY 1992 FY 1993 FY 1994 (10/1/90- (10/1/91- (10/1/92- (10/1/93-9/30/91) 9/30/92) 9/30/93) 9/30/94)

1. Assigned Date 12/10/90 U-2 12/15/91 U-2 12/93 U-2 (GL 89-03) 02/91 U-1 02/92 U-1 02/93 U-1 02/94 U-1
  1. RO 15 0 ,

0 16

  1. SRO Instant 0 2 0 0
  1. SRO Upgrade 0 10 6 0
  1. SRO Limited 0 0 0 0
2. Assigned Date 07/15/92 U-2 07/93 U-2 07/94 U-2 (GL 89-03) 08/91 U-1 08/92 U-1 08/93 U-1 08/94 U-1
  1. RO O 16 0 0
  1. SRO Instant 0 0 0 0
  1. SRO Upgrade 0 0 4 10
  1. SRO Limited 0 0 0 0 Please' indicate initial cold license examinations by placing an asterisk

(*) by the date. Please indicate examinations intended to extend an operator's license to a second or subsequent unit with two asterisks (**).

(For example, if Unit 1 is in operation and Unit 2 is approaching fuel' load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five R0 candidates licensed on Unit 1 are-to be-examined to extend their licenses to Unit 2, then indicate "R0 3,5** ")

=_ _-___-_--_-_____- _ _ _ _ __

o . . . .

Ker.,eth E. Perkins Jr.

September 14, 1990 '

BCAN099007 ATTACHMENT 2 i REQUALIFICATION EXAMINATION SCHEDULE PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FORMAT UTILITY AND NRC REGION- IV FY 1991 FY 1992 FY 1993 FY ' , '

(10/1/91- (10/1/92-(10/1/90- ^

4 o -s: ,

9/30/91) 9/30/92) 9/ 0/93) ' F, .

1. Date 8-91 (U-11 7-92 (U-2) 8-93 (U-11 f: ,s1 ,
2. Date
3. Date
4. Date
5. Date -i o

l Y

Kenneth E. Perkins Jr.

September 14, 1990 BCAN099007 ATTACHMENT 3 GENERIC FUNDAMENTAL EXAMINATION SCHE 0VLE UTILITY ANO NRC REGION 4 OCTOBER 1990 FEBRUARY 1991 JUNE 1991 Estimated Number of Candidates 1(U-1) 0 0 The Generic Fundamental Examination Schedule (GFES) is aciministered three times a year, on the Wednesday following the first Sunday in February, June, and October.

2 l