BVY-93-122, Monthly Operating Rept for Oct 1993 for Vermont Yankee Nuclear Power Station

From kanterella
(Redirected from ML20059J651)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1993 for Vermont Yankee Nuclear Power Station
ML20059J651
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/31/1993
From: Reid D, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-93-122, VY-RCE-93-038, VY-RCE-93-38, NUDOCS 9311120309
Download: ML20059J651 (6)


Text

_

., o.

VERMONT YANKEE NUCLEAR POWER CORPORATION

[f

. . P.O. Box 157, Governor Hunt Road (g{/ ;j/ Vernon, Ve rnont 05354-0157

. J .g y (802) 257-7711

, \ Y ,)

November 10,1993 VY-RCE-93-038 BVY 93-122 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 t.

ATTN: Document Control Desk.

Reference:

a) License No. DPR-28 (Docket No. 50 271)

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of October.1993.

Very truly yours, Vermont Yankee Nuclear Power Corp.

N

\ .h A Donald A. Reid Vice President, Operations  ;

cc: USNRC, Region l I USNRC Resident inspector, VYNPS DP 0411 Rev. 5 i Page 1 of 1

,2,,,e _ , ,,,es, PDR' ADOCK 05o0027, R

$,'t 91 PDR k

t VERMONT YANKEE NUCLEAR POWER STATION MONTIILY STATISTICAL REPORT 93-10 FOR TIIE MONTII OF OCTOBER 1993 t

f DP 0411 Rev. 5 Page 1 of 1 1

't

  1. OPERATING DATA REPORT DOCKET NO.50-271

. DATE 931110

. -COMPLETED BY G.A.-WALLIN TELEPHONE (802)257-7711.

QPERATING STATUS

1. Unit Name: Vermont Yankee U .2. Reporting Period: October NOTES:

3 '. Licensed Thermal Power (MWt):1593

4. Nameplate Rating (Gross MWe): 542-
5. Design Electrical Rating (Net MWe): 514 (oc) 504 (cc)
6. Maximum Dependable Capacity (Gross MWe) : 531 -
7. Maximum Dependable Capacity (Net MWe): 501-
8. If changes, occur in capacity ratings (Items' Number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any(Net MWe): N/A
10. Reasons for restrictions, if any: N/A

'This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 745.00 7296.00 183360.00'

'12. Number Of Hours Reactor was Critical 191.77 5713.19- 149909.54

13. Reactor. Reserve Shutdown Hours 'O.00 0.00 0 .~ 0 0
14. Hours Generator On-Line 145.30 5639.70 146894.34
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. .

Gross Thermal Energy Generated (MWH) 210074.50 8811072.50 218882138'.50:

- 17 . Gross. Electrical Energy Generated 68087.00 2924718.00 72909876.00 ,

E18.' Net Electrical Energy Generated (MWH)

  • 65341,QQ 2786892.00 69261767.00' l
19. Unit Service Factor 19.50 77.30 79.372 '

20-. Unit Availability Factor 19.50 77.30 79.37- i

21. Unit Capacity Factor (Using MDC Net) 17.40 75.79 74.261 ?
22. Unit Capacity Factor (Using DER Net) 17.06 74.31 72.81- ,
23. Unit Forced Outage Rate 0.00 3.98 -5.15~ j
24. Shutdowns scheduled over next'6 months (Type, Date, and Duration of' l Each: N/A  !

' 2 5. If shut.down at end of report period, estimated date of.startup:N/A  !

26. Units In Test Status (prior to commercial operation) : N/A ~  !

Forecast Achieved "

INITIAL CRITICALITY j INITIAL ELECTRICITY COMMERCIAL OPERATION j LVYDPF 0411.01  :

DP-0411 Rev. 5 -l Page-1.of 1 -

1 RT No. 13.F01.19F ,

I 6 -

i 4

l

AVERAGE DAILY UNIT POWER LEVEL q DOCKET NO. 50-271' _j

~

. UNIT : Vermont Yankee

- ,DATE- 931110 _

COMPLETED BY 'G.A -WALLIN- 3 TELEPHONE (802)257-7711" MONTH October l 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL -!

(MWe-Net) (MWe-Net). [

.i

1. 0 17. 0  :.
2. 0 18. ___

0 ,

3. 0 19. 0 ,
4. 0 20. O  !
5. 0 21. 0 -->

-i

6. 0 22. 0 f
7. 0 23. O  ;
8. 0 24. O  !
9. 0 25. 7 .
10. 0 26. 193
11. 0 27. 440 .;
12. 0 28, 515-
13. 0 29, 518 -l i
14. 0 30. 514  ;

i 15 .. 0 *31. 515

16. 0 *25 hour day INSTRUCTIONS On this format, list the average daily unit power level in MWE-Net l for each day in the reporting month. Compute to the nearest whole '

megawatt.  ;

VYDPF 0411.02 l DP 0411 Rev. 5 Page 1 of 1 .,

RT No. 13.F01.1BV I

.i J

?s,---

g.

. UNIT SHUTDOWNS AND: POWER REDUCTIONS , . . . ,

~

REPORT MONTH OCTOBER DOCKET NO 50-271' .

UNIT NAME Vermont Yankee- '

DATE 931110-COMPLETED BY-G.A. Wallin TELEPHONE _(8021257-7711 1 2 3 4 5

-No. Date Type Duration Reason Method of License System Component Cause-andLCorrective (hours) Shutting Event Code Code Action to~ Prevent-Down Report # Recurrence-Reactor 93-11 931001 S 597.88 C,B 1 N/A N\A N\A Shutdown for 1993

.(Cont) Refueling / Maintenance.

outage 1

93-12 931026 S 1.82 B N/A N/A N\A N\A Turbine overspeed testing 1 F: Forced 2 Reason: 3 Method: 4 Exhibit G- Instructions .

S: Scheduled A-Equipment Failure (Explain) 1 - Manual for Preparation of Data B-Maintenance or Test 2 - Manual Scram Entry Sheets for License C-Refueling ,'

3 - Automatic Scram Event Report (LER) File.

D-Regulatory Restriction 4- Other (Explain) (NUREG 0161)

E-Operator Training and License Examination 5 Exhibit I - Same Source.

VYDPF 0411.03 F-Administrative DP 0411.Rev. 5 G-Operational Error (Explain)

Page 1 of 1 H-(Explain) l:

f I

i

.____________________._..___.m_______ _____.-..___-__.--_..._.- . . ~ . ,

. . . - . . . . . - . . . _ , . . = , . - . . _ _;;;

.. t*

DOCKET NO. 50-271

' DATE .931110  :

COMPLETED'BY G.A. WALLIN ,

,. - TELEPHONE (802)257-7711 l REPORT MONTH October .

SUMMARY

'OF OPERATING EXPERIENCES Li

'Hiqhlichts j

Vermont' Yankee operated at 17.7% of rated thermal power'for the month.

Gross electrical generation was 68.087 MWHe.or 16.9% design electrical-capacity.

Operatino Summary j The following is a chronological description of plant operations including. I other pertinent items of interest for the month:

't At the beginning of the reporting period the plant was operating at 00.0%-

of rated thermal power.

  • i

-i

-931024 At 0114 hours0.00132 days <br />0.0317 hours <br />1.884921e-4 weeks <br />4.3377e-5 months <br />, the reactor was critical.

l 931025 At'2153 hours0.0249 days <br />0.598 hours <br />0.00356 weeks <br />8.192165e-4 months <br />, the turbine-generator was phased to the grid.

931026 At 0219 hours0.00253 days <br />0.0608 hours <br />3.621032e-4 weeks <br />8.33295e-5 months <br />, the turbine-generator was removed from the grid for testing. (See Unit Shutdowns and Power Reductions) 931026 At 0408 hours0.00472 days <br />0.113 hours <br />6.746032e-4 weeks <br />1.55244e-4 months <br />, the turbine-generator was. phased to the grid-following testing and a return'to full power,was initiated.

'[

t 1

'l f

3*

At the end of the reporting period the plant was operating at 99.8% of rated thermal power. '