ML20059G094

From kanterella
Jump to navigation Jump to search
Forwards LaSalle County Station Unit 2 Third Refueling Outage,Asme Section XI Summary Rept for Spring 1990 Insp
ML20059G094
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 09/05/1990
From: Morgan W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059G097 List:
References
NUDOCS 9009120131
Download: ML20059G094 (2)


Text

.

W:L .  %  !

Y

\

' DA

  • - ~i C2mmonw3Cith Edisin

[R

~< 1400 Opus PI:c3 '

1 Downers Grove, Illinola 60515 i

i t

September 5,1990 q

U.S. Nuclear Regulatory Commission Attn:1 Document Control Desk Washington, D.C. 20555

Subject:

LaSalle County Station Unit 2 -  ;

inservice inspection Summary Report  :

NRC Docket No. 50-374 1 j

l Oear Sir: q

. a Attached please find a copy of the Commonwealth Edison Company LaSalle;  !!

County Nuclear Power Station Unit 2 ISI Summary Report for the spring 1990 ASME- P Section XI Irmervice inspection.- This is the second wriod of tho first ten year )lan and i this was LaSalle's third refuelina outage for Unit 2. _aSalle's malling address s LaSalle'~ '

County Station, P.O. Box 220, Rural Route 1, Marseilles, IL 61341. Unit 2 is owrad and .

operated by Commonwealth Edison Co., whose address is One First National Plaza, l  !

P.O. Box 767, Chicago, Illinois 60690. Unit 2 has a Commercial Operating date of' October 17,1984, and has a gross generating capacity of 1122 MWE.-

The Unit 2 reactor vessel was supplied by Chicago Bridge and Iron, Oak Brook, IL 60521. The reactor recirculation system com)onents were su) plied by

)

General Electric, Co., San Jose, CA 95125. All other p ping examined c uring the third refueling outage was supplied by B.F. Shaw, Wilmington, Delaware 19801. 'he residual  :;

heat removal system heat exchangers were supplied by Struthers Wells Corp., Warren, Pennsylvania 16365.

The inspections that were 3erformed, the conditions that were obseWed, and the corrective measures that were ta <en are contained in the attached report.

We certify that the staten.ents made in this report are correct and that the examinations and corrective measures taken conform to the rules of the 1980 Edition of ASME Section XI, including the Winter 1980 Addenda.

I g ?[)33 9009120131 900905 PDR ADOCK 05000374 Q PDC

~

L

,y< .

_ , 3 ~

1  :  !

A< ' 6; ,' '

s ,

. U.S.' NRC :

4 2 -- - September 5;1C40 - 1 y

~

l 1

- if there are any questions or commemb regarding this matter, please ' contact ! ]

t' his office.

? Very truly yours, l

~ W.E.

rgan i .

M 1

o"' Nuclear Licensit.g Administrator l-  ;

i

i
Attachment ,

s cc: - A. Bert Davis - Regional Administrator, Rlli-T. Tongue -' Senior Resident inspector, LSCS

,i Imw/ID145 f

I i l b .

r

.I b

s O

_ , - , - . . .- --. . , , _ - . - - . -