Forwards Info Re Temporary Mod to Security Plan Concerning Protected Area.Info Withheld
ML20059E682
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 09/04/1990
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLR-N90178, NUDOCS 9009100278
Download: ML20059E682 (2)


Text

[

SAFEGUARDS INFORMATION l

g Pubhc Service Electric and Gas Company Stanley LaBruna Pubhc Service Electnc and Gas Company P.O Box 236, Hancocks Booge. NJ 08036 609-339 4500 4 ueues aen uw owaws SEP 0 41990 NLR-N90178 4

United States Nuclear Regulatory Commission- 7 Document Control Desk Washington, DC 20555 Gentlemen:

SALEM AND HOPE CREEK GENERATING STATIONS ARTIFICIAL ISLAND SECURITY PIAN TEMPORARY PROTECTED AREA MODIFICATION i DOCKET NOS. 50-272, 50-311, 50-354 As' described to Mr. Keinig and members of the Safeguards Section staff on August 21, 1990, Public' Service Electric & Gas Company (PSE&G) will construct a new warehouse' facility within the Artificial Island protected area. To complete this major task with minimal effect upon the Nuclear Security Program, PSE&G is notifying the NRC in accordance with 10 CFR 50.54 (p) of its intent to temporarily modify the protected area to permit-construction outside the protected area. This arrangement will provide several security benefits and construction program savings. Security benefits include maintenance.of security measures equivalent to those described in the-Artificial Island ,

Security Plan, reduced personnel, vehicle and material searches  !

and processing, avoidance of construction interferences with lighting and CCTV surveillance,.and very limited compensatory posting and personnel-escorting.

Attachment i depicts'the proposed location of the' warehouse and temporary protected area perimeter relative to the currently approved site configuration. Attachment 2 describes the security measures which will be.in force for the duration of the project.

When the project is completed, the protected area will be configured in a new permanent layout, also' depicted in Attachment

1. A Security Plan revision describing the physical protection features associated with the warehouse and a drawing showing the revised site layout will~be submitted under the provisions of 10 CFR 50.54 (p).

SAFEGUARDS INFORMATION 0M C.

MIEN SEPARATED PROM ENCLOSURES s fgh i 9oon oo27e 9009o4 IIANDLE Tills. DOCUMENT AS. DECONTROLLED '

i'i

,i PDh ADOCK 05o00272 I F l PDC -

l SAFECUARDS INFORMATION Document Control Desk 2 NLR-N90178 SEP o4 tgg0 Thank you for the customary courtesy and constructive comments provided by Mr. Keinig and his staff.

l

Sincerely,

&c w Enclosure C (Without enclosures, except as noted)

Mr. J. C. Stone Licensing Project Manager - Scleu.

Mr. C. Y. Shiraki

, Licensing Project Manager - Hope Creek Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator (w/ enclosures)

Region I Mr. Kent Tosch, Chief

. -. - . -