MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip ML20058A2591993-11-10010 November 1993 Application for Amends to Licenses NPF-37,NPF-66,NPF-72, NPF-77,DPR-39,DPR-48,NPF-11 & NPF-18 Re Limitations on Radioactive Matl Released in Liquid Effluents,New 10CFR21 & Radioactive Matl Released in Gaseous Effluents 1999-08-06
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20059E2681993-12-30030 December 1993 Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37, NPF-66,NPF-72,NPF-77,NPF-11,NPF-18,DPR-39 & DPR-48, Respectively.Amends Change Instantaneous Limits for Radioactive Liquid & Gaseous Effluent Release Rates ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip 1999-08-06
[Table view] |
Text
Commonw:alth Edis:n
+ Z r 1400 Opus Place
. 7 Downers Grove,11hnois 60515 October 28,1993 Dr. Tl omas E. Murley U.S. Nuclear Regulatory Commission Director, Nuclear Reactor Regulation Washington, D.C. 20555 Attn: Document Control Desk
SUBJECT:
LaSalle County Nuclear Power Station Units 1 and 2 Application for Amendment of Facility Operating Licenses NPF-11 ,
and NPF-18 Technical Specifications NRC Doclet Nos. 50-373 and 50-374 Dr. Mur:ey:
Pursuant to 10 CFR 50.90, Commonwealth Edison (CECO) proposes to amend Appendix A, Technical Specifications, of Facility Operating Licenses NPF-11 and NPF-18 to revise the ECCS injection valve stroke times and ECCS response times due to MOV modifications (resulting from GL 89-10 testing) that slow down
- injection valve stroke times. This will not affect plant operations and has been .
justified by a limited break spectrum Loss-Of-Coolant Accident Analysis performed '
by General Electric. Acceptance of this analysis will establish a new LOCA analysis of record for LaSalle, upon which any future changes will be based. In addition a review of the sensitivity of previous analyses has been performed for Anticipated Transients Without Scram, containment response, the limiting offsite dose event, and HPCS-related transients.
This proposed amendment request is subdivided as follows:
- 1. Attachment A gives a description and safety analysis of the proposed changes in this amendment.
- 2. Attachment B includes a summary of the proposed changes and the marked-up Technical Specifications pages for LaSalle Units 1 and 2 with the requested changes indicated.
- 3. Attachment C describes CECO's evaluation performed in accordance with :
10 CFR 50.92 (c), which confirms that no significant hazard consideration is involved.
kMla\lasalle\locase. wpm f f
9311030132 931028 7 PDR ADDCK 05000373 $
1( ,
- p. PDR. . a m
E
- 4. Attachment D provides an Environmental Assessment Applicability Review per 10 CFR 51.21.
- 5. Attachment E is the General Electric Loss-Of-Coolant Accident Analysis Report for LaSalle Units 1 and 2. .
- 6. Attachment F is a withholding aflidavit for the GE LOCA Analysis Report.
- This proposed amendment has been reviewed and approved by CECO On-Site and Off-Site Review in accordance with Commonwealth Edison procedures.
Commonwealth Edison requests that NRC review of the Technical Specification !
changes be completed by LaSalle Unit 1 Cycle 6 shutdown. which is scheduled to l occur March 7,1994, so that the valve modifications can proceed with assurance y '
that this licensing amendment is acceptable to your staff.
The attached General Electric LOCA Analysis Report contains information proprietary to General Electric Company. In accordance with the requirements of 10CFR 2.79(b), an affidavit for this letter is enclosed as Attachment F to support the withholding of this report from public disclosure. )
To the best of my knowledge and belief, the statements contained above are )
true and correct. In some respect these statements are not based on my personal l knowledge, but obtained information furnished by other Commonwealth Edison employees, contractor employees, and consultants. Such information has been reviewed in accordance with company practice, and I believe it to be reliable. -l Commonwealth Edison is notifying the State ofIllinois of this application for 3 amendment by transmitting a copy of this letter and its attachments to the .)
designated state official. l
\
j Please direct any questions yon vaay have concerning this submittal to this office.
gg., et [N . county of ' IAfd Very truly yours, e.- k me on this ' N-[ay n ry puta e GaryG./ Benes 7 g Nuclear Licensing Administrator l
- k:\nlaMa aalleVocase.wpfi2 1
, .- . . .~ . . = . . . .. . - , -
i Subscribed an vorn to before me
- 1993.
Notary Public 1 Attachments:
A. Description of Safety Analysis of the Proposed Changes
. B. Marked-Up Technical Specification Pages C. Evaluation of Significant Hazards Considerations D. Environmental Assessment Applicability Review E. General Electric Loss-Of-Coolant Accident Analysis F. Withholdin'g Affidavit for General Electric LOCA Analysis Report cc: J. B. Martin, Regional Administrator - RIII-D. L. Hills, Senior Resident Inspector - LSCS 3 J. L. Kennedy, Project Manager, NRR 1 Oflice of Nuclear Facility Safety - IDNS ~ .
" OFFICt AL SE AL "
S ANDH A C. L AR A NOT A9Y PUBLic. STATE OF ILLIN0lS -
My ccMytSSiON EXPIRES 6/26!S
.J
-i i
j
)
.]
I
'l 1
-: I I
1 k:\nla\lasalle\locase.wpf\3 1
1, ._: .
2 __ ..;. __
ATTACHMENT A DESCRIPTION AND SAFETY ANALYSIS OF PROPOSED CHANGES TO APPENDIX A, TECHNICAL SPECIFICATIONS OF FACILITY OPERATING LICENSES NPF-11 and NPF-18 L DESCRIPTION OF THE CURRENT REQUIREMENT The LaSalle Units 1 and 2 Technical Specifications provide required response' >
times for several ECCS systems in Table 3.3.3-3 (See Attachment B). The Low Pressure Core Spray System (LPCS) and the Low Pressure Coolant Injection (LPCI) Mode of the Residual Heat Removal System required response times are both given as less than or equal to 40 seconds. In addition, the LPCS and LPCI injection valves are required to be open within 20 seconds after receipt of the reactor vessel pressure and ECCS injection line pressure interlock signal concurrently with power source availability and receipt of an accident initiation signal. The High Pressure Core Spray System (HPCS) required response time is given as 27 seconds.
IL BASES FOR THE CURRENT REQUIREMENT Per the design basis of the systems one purpose is to mitigate the effects of a Loss-Of-Coolant Accident (LOCA), and to a lesser extent, the mitigation of sev-eral other events. The current Technical Specification required response times for these systems were used by General Electric as input assumptions in the current LaSalle LOCA analysis (Reference 1, approved in References 2 and 3),
which demonstrates that the limiting LOCA would result in a Peak Cladding Temperature (PCT) of 1138 F, which is less than the acceptance limit of 2200 F.
The stroke times are also input assumptions to several other analyses performed by GE for other less severe events.
IIL NEED FOR REVISION OF THE REQUIREMENT Modifications to the ECCS injection valves are scheduled to be performed during reftuling outages which begin in March,1994 for Unit 1 and March,1995 for Unit 2. The modifications are the result of GL 89-10 testing and will improve MOV performance. They are based on gear changes which will slow down the valves' stroke times, and consequently, system response times to values greater than currently permitted by LaSalle Technical Specifications.
.A-1
IV. DESCRIPTION OF THE REVISED REQUIREMENT ;
The requested change would increase the injection valve stroke times for LPCS and LPCI from 20 seconds to 40 seconds. This would result in required response ,
times for these systems ofless than or equal to 60 seconds (currently,40 sec-onds). Because of the increase in the HPCS injection valve stroke time from 14 seconds to 28 seconds, the response time for this system would become 41 sec- ,
onds instead of the current requirement of 27 seconds.
V. BASES FOR THE REVISED REQUIREMENT Because the increased valve stroke times result in delayed coolant injection from the affected ECCS systems, the LOCA PCT will increase. To justify that this in-creased severity does not result in a PCT exceeding the allowable limit of 2200 F, ^
and to verify that the other four LOCA licensing criteria in 10CFR 50.46 contin-ue to be met, GE has performed a limited break spectrum LOCA analysis which reflects the increased response times for LPCS, LPCI and HPCS (Attachment E).
A. LOCA Analysis Method The four GE computer models used in this analysis are: LAMB (short-term blowdown phenomena for large breaks), SCAT (transient short-term thermohydraulic calculations for large breaks), SAFER (long-term system re- '
sponse for all breaks) and GESTR-LOCA (fuel stored energy and fission gas in- l ventory). All methods used for this analysis have been previously reviewed and approved by the NRC. 1 The limiting fuel type and limiting single failure were determined by comparison. ,
of case results which used nominal input assumptions. Cases were then run us- 1 ing Appendix K to 10CFR Part 50 input assumptions for a more limited number l of combinations. This analytical approach is part of the SAFER /GESTR-LOCA l licensing methodology that was approved by the NRC. i i
Nominal analyses were performed for the Design Basis Accident (DBA), which is a 3.10 ft' double ended guillotine break of the recirculation suction line, the 80%
DBA, the 60% DBA, a 1.0 ft2 break, a 1.4 ft* break, a 0.5 ft2 break, a 0.1 ft 2 .
break, and a 0.05 ft2 brea'k. The non-recirculation line break that was performed ' l was for the Main Steamline Break Outside Containment. Results were obtained - 1 for the P8x8R (GE7), GE8x8EB (GE8) and GE8x8NB (GE9) fuel types for all i nominal cases, except the 80% and 60% DBA cases, which were performed only for the limiting fuel type (GE7). Appendix K results were determined for the limiting fuel type (and, in some cases, for all three fuel types) for all cases except the 0.5 f12 and 0.05 ft 2cases. Results were obtained for the HPCS D/G failure, the LPCS D/G failure, and the LPCI D/G failure, although not all cases were run . l for all failures. The limiting single failure was determined to be the HPCS D/G . j failure, and this failure was analyzed for all of the cases described above. A list-: '
ing of the PCTs obtained for the different cases is given in Attachment E, Tables 5-1 and 5-2.
A-2 ,
B. LOCA Analysis Results GE found the limiting LOCA case to be the DBA with the HPCS D/G failure.
For the limiting fuel type, GE7, the licensing basis PCT for LaSalle Station was calculated to be 1260 F, which is well below the 2200 F licensing basis limit es-tablished by the NRC. This value may be found in Table 6-1 of Attachment E, along with values for the PCTs of the two non-limiting fuel types. The licensing basis PCTs were determined consistent with the NRC-approved methodology de-scribed in the GE analysis report.
The maximum local oxidation was found to be less than 0.1%, and the core-wide metal-water reaction was found to be less than 0.3%, which satisfies the applica-ble licensing constraints. These parameters were verified for all three fuel types.
Compliance with requirements for coolable geometry and long-term cooling were previously met in the Reference 4 analysis listed in Attachment E and are not adversely affected by the changes associated with this amendment.
Single Loop Operation (SLO) analyses were performed for the same limiting break and single failure scenario (DBA with HPCS DG failure) as determined for two-loop operation. Without a MAPLHGR reduction, the resulting PCTs are somewhat higher than those for their corresponding two-loop cases. However, since these PCTs are still well below the 10CFR 50.46 limit, no MAPLHGR re-duction is required under SLO. ,
As with the previous analysis of record, the new LOCA analysis is also valid for operation in the Extended Load Line Limit (ELLLA) region, as described in At-tachment E.
The MAPLHGR limits currently in the LaSalle 1 and 2 Core Operating Limits Reports (COLRs) were found to remain valid, since the values used in the GE l analysis were equal to, or larger than, those contained in the current COLRs.
C. Justification for Continued Applicability of Other Previous GE 3 Analyses Appendix A of Attachment E provides a discussion of sensitivity studies per-formed by GE to demonstrate that results from the Anticipated Transient Without Scram (ATWS) analyses, containment analyses, off-site dose analyses l (Main Steamline Break Outside Containment) and HPCS-related transient l analyses would not be impacted by the increased injection valve stroke times.
VL SCHEDULE REQUIREMENTS Commonwealth Edison requests that this amendment be processed by March 7, 1994, which is the scheduled shutdown date for LaSalle Unit 1 Cycle 6. Other- l wise the injection valve modifications would have to be initiated without assur-ance of the acceptability of this proposed' amendment. The valves are not re-quired to be operable until the core is begun to be reloaded during the refueling outage, however.
1 A-3 j i
d VIL CONCLUSION The LPCS, LPCI, and HPCS injection valve stroke times and ECCS response times will be increased for LaSalle ' Units 1 and 2 as a result of gear changes re-sulting from ECCS injection valve modifications. These increased stroke times have been used as the input assumptions for a limited break spectrum LOCA analysis, which has been performed for both units by GE. The calculated li-censing basis PCT remains well below the 2200 F licensing basis acceptance lim-it. The four other 10CFR 50.46 LOCA criteria also continue to be within their associated acceptance limits. GE has also provided adequate justification for the continued applicability of other related analyses with the increased stroke times.
l l
l l
1 1
j J
A-4
- - , . = .
REFERENCES
- 1. GE document, NEDC 31510P, "LaSalle County Station Units 1 and 2 SAF-ER/GESTR-LOCA Loss-Of-Coolant Accident Analysis", December 1987.
- 2. P. C. Shemanski (NRC) to H. E. Bliss (CECO), " Issuance of Amendment No. 58 to Facility Operating License NPF-11, LaSalle County Station, Unit 1 (TAC No.
66969)" containing " Safety Evaluation by the Office of Nuclear Reactor Regulation
. Relating to License Amendment for Cycle 3 Reload, License No. NPF-11, Common-wealth Edison Company, LaSalle County Station, Unit 1, Docket No. 50-373", June 23,1988.
- 3. P. C. Shemanski (NRC) to H. E. Bliss (CECO), " Issuance of Amendment No. 41 to Facility Operating License NPF-18, LaSalle County Station, Unit 2 (TAC No.
69368)" containing " Safety Evaluation by the Office of Nuclear Reactor Regulation, Amendment No. 41 to Facility Operating License No. NPF-18, Commonwealth Edi- :
son Company, LaSalle County Station, Unit 2, Docket No. 50-374", January 6,1989.
4 A-5