Forwards Revised Tech Specs Re Defueled Status of Plant,Per Agreements Reached W/Nrc at 900802 Meeting
ML20059D403
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 08/30/1990
From: Leonard J
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059D406 List:
References
SNRC-1752, NUDOCS 9009070029
Download: ML20059D403 (2)


Text

. . ,

4 gg LONG ISLAND LIGHTING COMPANY l mamu,muce-- I SHOREHAM NUCLEAR POWER STATION l P.o. sox e t c. NORTH COUNTRY RO AD

  • WADING RIVER. N.Y.11792 l

JOHN D. LEONARD, JR vet Pet 6IDI wt.08 Fct W conPo4ATt unvett I

AND vet . w . *ne' " "" "'"

Sm-m l

AUG 3 01990 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Revision To License Change Application Operating License NPF-82 Shoreham Nuclear Po) ,r Station - Unit 1 Docket No. 50-322 Reft (1) LILCO letter SNRC-1664 dated January 5, 1990 to the U.S.

Nuclear Regulatory Commission from W.E. Steiger, Jr.;

subject: License Change Application, Operating License NPF-82 (2) NRC letter dated June 27, 1990 to William E. Steiger, i Jr. from Walter R. Butler; subject: Technical l Specifications For The Defueled Mode, Shoreham Nuclear Power Station, Unit 1 (TAC No. 75846) l l

l Gentlemen:

By this correspondence, the Long Island Lighting Company (LILCO) revises its request to amend Facility Operating License NPF-82, as identified by SNRC-1664 (reference 1), by proviaing a revised set of defueled technical specifications. This revised set l incorporates the agreements reached with the NRC Staff at the August 2, 1990 meeting and subsequent discussions with Messrs.

  • Brown and Miller.

SNRC-1664 forwarded LILCO's request to amend Facility Operating License NPF-82 to create a Defueled Facility Operating License.

The regulatory and technical bases for LILCO's request were provided in the attached documents to SNRC-1664, attachment 2 of l which contained a draft of the Shoreham Nuclear Power Station (SNPS) Technical Specifications, revised to reflect the current defueled status of the plant. LILCO proposed to amend the tq,c)gi al specifications to establish a set of Limiting C R)dy ~ As for Fuel Handling and to eliminate all c:her existing Limiting Conditions for Operations and the Safety Limits section 28P P

I88R 8888h PNU f Q

~'

n-SNRC-1752 Page 2 which are'not relevant to Shoreham in its defueled, non-operational condition.

The Commission's letter;of June 27, 1990 (reference 2) provided the Staff's initial review of our request and provided the Staff's comments on-the propos04 technical specifications.

Subsequently, on August 2, 1990 LILCO met with the Staff to discuss the Staff's commente,-resolvo outstanding concerns, and to prepare final Defueled Technical Specifications. Again, as a

' result of that meeting and subsequent discussions, attached to this letter is LILCO's proposed-revision to Shoreham's Technical Specifications to replace those provided in reference (1).

If additional inforn,ation or further discussion is required in this matter, please do not hesitate to' contact my-office.

Very truly yours,

..}