Provides Info on Acceptability of Rescheduling Response to Reg Guide 1.97 Ser,Item 4b, Neutron Flux Monitoring Instrumentation. Rescheduling of Util Response Will Be Determined on or Shortly After Meeting W/Nrc
ML20058P765
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 08/14/1990
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9008200058
Download: ML20058P765 (1)


Text

. ._. . . - _ _ . - - - . . ._m__. _ _ _ _ _

I I

..fe -

Whey Power Staten '

  • Shwngport, PA 15077A)04 3 1

t COU1o.,% m2, m sas 1 August 14, 1990

-U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,.DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Response to R. G. 1.97 Gentlemen:-

This- letter provides information on the acceptability of I 4

rescheduling our response to Item 4b, Neutron Flux Monitoring

-Instrumentation, of the Regulatory Guide 1.97 Safety Evaluation

'l '

Report (SER) for the- Beaver Valley. Power Station (BVPS-1). 'The I response; was to.,be submitted by. August '15, 1990~ predicated on a l prior meeting with' the -NRC Staff. As indicated in our previous. 1

. response to the SER, we have pursued resolution of the issue with j other. utilities which will-.also ba represented at the meeting. i During .telecon discussions on August 3 and-6, 1990 between i Mr. -A. W. DeAgazio, NRC Senior Project Manager,.and Mr. E. D.. .

Coholich, Duquesne Light company (DLCo) , . it - was determined that a - .i meeting prior to August:15 between the NRC Staff and the Utility l Group Representatives could :not be arranged ~because.of personnel  ;

schedules. .However, Mr. DeAgazio determined that it would be

acceptable; to delay the-DLC response until after1the meeting.. The'.

-nearest _ possible future date. for the-meeting will be arranged -

presently targeted ,for mid-September. The rescheduling of the DLCo response will be determined.on or shortly,after the meeting.

. 'Please contact- my-. office if there are any questions-regarding this' submittal.  ;

Very truly yours,

. A'2/

J. D. Sieber Vice. President O -

Nuclear Group

.cc: Mr. J. Beall, Sr. Resi' dent. Inspector Mr. T. T. Martin, NRC Region I Administrator

'Mr. A. W. DeAgazio, Project Manager Mr. R. Saunders (VEPCO) 00029 /

9009200058 900814 9 j PDR ADOCK 05000334 i e p PDC i l