Text

. .. . .

l

-- Southern Nucitar Operating Company.

Post Omca Box 1295 -

8rmingham Alabama 35201 Telephone (205) 668-5131 e..e uor.y Southem Nudear Operating Company

  • Vice President Farley P.oject . The southem electoc system -

Deconber 13, 1993 I

h Docket Nos. 50-348  !

50-364

  • i U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk ,

t Washington, D.C. 20555 ~

I . . .!'

! Joseph M. Farley Nuclear Plant Monthly Operating Data Report s i .

Gentlemen:

! +

Attached are the November 1993 Monthly Operating Reports for Joseph M. Farley Nuclear S Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

Ifyou have any questions, please advise.  ;

. Respectfully submitted,-

66 '>nt+f Dave Morey RWC:jgp(mor) ,

Attachments  !

cc: Mr. S. D. Ebneter Mr. T. A Reed Mr. T. M. Ross 9312200013 931130 57 f'

gDR ADOCK 05000348 I/r PDR

OPERATING DATA REPORT:

DOCKET NO. 50-348 DATE December 6,1993 -

COMPLETED BY R. D. llill TELEPHONE- (205)S99-5156 -

QPERATEG STATUS

1. Unit Name: Joseph M. Farley- Unit 1 Notes
2. Reporting Period: _

November 1993 - 1) Cumulative data since 12-01-77, date

3. Licensed Thermal Power (MWt): 2,652 ofcommercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812
3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe) N/A
10. Reasons For Restrictions,If Any:- N/A This Month - Yr.to Date i Cumulative
11. Ilours in Reporting Period 720.0 8,016.0~ l4R256.0
12. Number OfIlours Reactor Was Critical 720.0 7,798.6 '110,919.9:
13. Reactor Reserve Shutdown llours 0.0 0.0 3,650.0 -
14. Hours Generator On-line 720.0 , 7,778.9 109,162.6
15. Unit Reserve Shutdown Ilours 0.0 0.0 _

0.0

16. Gross Thermal Energy Generated (MWII) 1,909,034.3- 20,519,100.6 280,520,176.4
17. Gross Electrical Energy Generated (MWII) 619,240.0 6,606,834.0 90,373,636.0
13. Net Electrical Energy Generated (k 'II) 588,292.0 6,264.618.0-- 85,330,868.0
19. Unit Service Factor 100.0 97.0- 77.8

! 20. Unit Availabilty Factor 100.0 97.0- 77.8

21. Unit Capacity Factor (Using MDC Net) 100.6 96.3' 74.7
22. Unit Capacity Factor (Using DER Net) 98.6 94.3 ~ 73.4'
23. Unit Forced Outage Rate 0.0 3.0 - ' 6.4 -
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Fxh):

Refueling / Maintenance Outage March 4,1994. Approximately 56 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commer cial Operation): . Forecast  ; Achieved Initial Criticality 08/06/77 0&'09111 Initial Electricity 082.091- 08/18/77 Commercial Operation 12/2191' 12/ DIG 1'

i- .

. . ., .. 1 j DOCKET NO. 50-348 ~ ,;

UNIT : 1  !

j' ' DATE December 6,- 1993 l COMPLETED BY- R. D. Hill -

j

[

4 TELEPHONE - (205) 899-5156- l Y

+

l MONTH ~' NOVEMBER ..,

l  ;

DAY AVERAGE DAILY POWER LEVEL DAY - AVERAGE DAILY POWER LEVEL' . l

(MWe-Net) . (MWe-Net)  !
l 823' .17 - '810-1

]

.2 822 ' 18 - 8'18 -1 3 820 19 818- '

N 4 815 20' - - I819- o I

5 810~ 819 j 6 -809' 22 819:

t 7 823 23 819 8 822 24 819-i 9 819 25. '819-  ;

10 821 26 817 11 821 27 817-12 818- 28, '819- ,

i i

13 813 29 '819

l 14 808~ 30 '818- 1 15 810 - 31- N/A -

l 5!

16 810- , .j

.i PjSTRUCTIONS On dus format, list the average daily unit power level in MWe-Net for each day in Gm reporting period. Cornpute to em nearest m4ude megawstL 11

Joseph M. Fcrley Nuclerr PI:nt Unit I Narrative Summary of Operations November 1993 l

l There were no unit shutdowns or major power reductions during the month of November.

The following major safety related maintenance was performed during the month:

1. Performed miscellaneous corrective and preventive maintenance on the diesel l generators.

l 1

4

/

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKIRNO. 50-348 UNIT NAME J. M. Farley - Unit i DATE December 6,1993 COMPLLTED IlY R. D. Ilill REPORT MONTil NOVEMBER TELEPIIONE (205) 899-5156 MImIOD OF LICENSEE CAUSE AND CORRECI1VE DURATION SIIUTITNG EVENT SYSTEM COMPONENT ACTION TO

- NO. DATE TYPE (1) IlOURS REASON (2) DOWN REACTUR Q) REPORT # CODE (4) CODE (5) PREVENT RrrURRENCE There were no shutdowns or power reductions during the month of November.

1: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G. Instructions for Exhibit I- Same Source S: Scheduled A Equipment Failure (Explain) .1-Manual Preparations of Date Entry

- D MaintenanceorTest 2 ManualScram Sheets for Licensee Event

. C - Refueling 3 Automatic Scram Report (LER) File (NUREG-0161)

D- Regulatory Restriction . 4 - Other(Explain)

E - Oi erator Training & license Esami-stica F- Administrative G - Operational Error (Fglain)

II- Other(Explain)

OPERATING DATA REPORT  !

DOCKET NO. 50-364 l DATE- December 6,1993 f

COMPLETED BY R. D. Ilill TELEPHONE (205) 899-5156 ,

}

f I

onuma srrres  ;

'!t

1. Unit Name: Joseph M. Farley - Unit 2 Notes -
2. Reporting Period: November 1993 1) Cumulative data since 07-30-81, date .
3. Licensed Thermal Power (MWt): 2,652 ofcommercial operation. j
4. Nameplate Rating (Gross MWe): 860 t
5. Design Electrical Rating (NetMWe): 829 6 Maxi.num Dependable Capacity (Gross MWe):' 863.6 i
7. Maxir,4um Dependable Capacity (Net MWe): 822 _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons N/A l
9. Power Irvel To Which Restricted, If Any (Net MWe) N/A  !
10. Reasons For Restrictions,IfAny: N/A '

l This Month Yr.to Date Cumulative 8,016.0 108,169.0 I

11. Ilours in Reporting Period 720.0
12. Number OfIlours Reactor Was Critical 25.2 6,372.3 92,394.2 (
13. Reactor Reserve Shutdown Ilours 0.0 0.0 138.0 -
14. 11ours Generator On-line 0.0 6,152.0 91,068.7-
15. Unit Reserve Shutdown llours 0.0 0.0 - . 0.0
16. Gross Thermal Energy Generated (MWII) 0.0- 15,900,208.7 232,431,156.5 -
17. Gross Electrical Energy Generated (MWH) 22.0 5,180,941.0 76,193,119.0' l8. Net Electrical Energy Generated (MWII) ' (9,812.0) 4,906,313.0 72,245,511.0
19. Unit Service Factor 0.0 76.7 84.2  ;
20. Unit Availabilty Factor 0.0 76.7 84.2 l
21. Unit Capacity Factor (Using MDC Net) N/A '74.5 81.5
22. Unit Capacity Factor (Using DER Net) N/A 73.8 80.6 j
23. Unit Forced Outage Rate 0.0 4.0 4.0 f 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): l N/A
25. If Shut Down at End Of Report Period, Estimated Date ofStartup: December 2,1993 j
26. Units in Test Status (Prior To Commercia10peration):  : Forecast . Achieved  !

Initial Criticality 05/06/81 05/08/81 l Initial Electricity 05/24/81 05/25/81 l Commercial Operation 0.8/01/81 02/30/81  !

l

.]

l

.m

I o .,

l DOCKET NO. 50-364 i UNIT 2 DATE December 6,1993 COMPLETED BY R. D. Hill TELEPIIONE (205) 899-5156 l MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i 1 0 17 0 i 2 0 18 0 3 0 19 0 l

4 0 20 0 5 0 21 0 l 6 0 22 0 7 0 22 0 l

8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 l

12 0 28 0 I 13 0 29 0 .

0 l 14 0 30 l

15 0 31 N/A 16 0 issmuloss On this format, list the average daily unit power levelin MWe-Net for each day in die reporting period. Compute to the nearest whole merswatt.

- . = . . . .. ._ . . .

~

Joseph M. Ftrley Nucle:r Plant Unit 2  !

Narrative Summary of Operations .

November 1993 l The cycle 9-10 refueling outage continued through the month of November.

The following major safety related maintenance was performed during the month of j November:  !

1. Performed miscellanecus corrective and preventive maintenance on the diesel j!

generators. Completed work on the 2C diesel generator as part of the station . l black-out modification. Ll j

2. Performed eddy. current testing, sleeving of tubes, and plugging of tubes in all three steam generators. -
3. Completed refueling the reactor and performed the reactor vessel assembly.
4. Achieved reactor initial criticality at 2251 on Il-29-93.  ;

r i

i

.J 1

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS '

DOCKET NO. 50-364 UNIT NAME J. M. Farley - Unit 2 DATE December 6,1993 COMPLETED llY R. D.11i11 REPORT MONTil NOVEMBER TELEPIlONE (205) 899-5156 MEDIOD OF LICENSEE CAUSE AND CORRECTIVE DURADON S11UTITNG EVENT SYSTEM COMPONENT ACllONTO NO. DATE TYPE (l) IlOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RFCURRENCE 005 931001 S 720 C 1 N/A N/A N/A The cycle 9-10 refueling continued fmm 930925. l i

1: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G Instructions for Exhibit I- Same Source

~ 5: Scheduled A - Equipment Failure (Explain) I-Manual Preparations of Date Entry -

B . Maintenance or Test 2 - Manual , sheets for Licensee Event C- Refueling 3 - Automatic . . ram ' Report (LER) File (NUREG-0161) -

D- Regulatory Restriction 4 -Other(Explain)

- E - Operator Training & Ucense Examination -

+

F- Adm nistrative i

- G-Operational Error (Explain)

II- Other(Explain)