Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARJAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities ML20076F4631994-10-0707 October 1994 Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements 1999-09-29
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARJAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236X5831998-07-29029 July 1998 Amend 245 to License DPR-59,consisting of Changes to TS in Response to Application Transmitted by ,Requesting Rev of Reactor Protection Sys Normally Supply Electrical Protection Assembly Undervoltage Trip Setpoint ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities 1999-09-29
[Table view] |
Text
- - - .
$23 Main street - .
i Wh:te Pla:ns. New York 10601 j 914 E416S46 '
l
- > NewYorkPower ,,,,,,,.,,,,,
& Authonty e eceive v.ce eremoent Nuclear Generation August 17,1993 i JPN-93-059 ;
i U.S. Nuclear Regulatory Commission {
ATTN: Document Control Desk i Mail Station P1-137 Washington, DC 20555 -
SUBJECT:
James A. Fitzpatrick Nuclear Power Plant ~ t Docket No. 50-333 !
- Proposed Changes to the Technical Specifications ,
Regarding Power Uprate (JPTS-91-025)
Revision 2 to NEDC-31317P -
]
REFERENCES:
See page 3. !
l
Dear Sir:
The Authority submitted a proposed amendment to the James A. FitzPatrick Technical Specifications to increase the authorized maximum power level by ,
approximately 4.1 percent to 2536 megawatts thermal (Reference 1). A detailed LOCA l analysis was performed by the General Electric Company and summarized in a proprietary report entitled, " James A. FitzPatrick Nuclear Power Plant SAFER /GESTR-LOCA Loss-of Coolant Accident Analysis," NEDC-31317P-1, Revision 1 (Reference 2).
T5e Authority submitted this report with the proposed amendment. The NRC reviewed General Electric's report along with the associated affidavits and was unable to conclude that the report contains proprietary information (Reference 3).
, General Electric has revised the report and the associated affidavit to conform to 10 CFR 2.790. Two copies of the revised report supporting our proposed Technical Specification change are enclosed (Attachment 1). This report supersedes and replaces the report included with Reference 2.'
(\
none 9309230171 930817 F fo ii PDR P
ADDCK 05000333 h PDR, L1
The changes in Revision 2 are limited to those necessary to identify information -
I considered proprietary by General Electric. The technical information included in Revision 2 is the same as in Revision 1. Information marked with vertical lines in the
! margin of the report is of the type which General Electric maintains in confidence and withholds from public disclosure.
The Authority requests that this report be withheld from public disclosure in accordance with the provisions of 10 CFR 2.790. It has been handled and classified as proprietary by General Electric as indicated in the enclosed affidavit. An affidavit for this revised report is also enclosed (Attachment 2). Please return all copies of NEDC-31317P, Revision 1 held by the NRC to the Authority. ,
If you have any questions, please contact Mr. J. A. Gray, Jr.
Very truly yours,
- -/G ;
Ralph E. Beedle cc: Regional Administrator ,
U.S. Nuclear Regulatory Commission l 475 Allendale Road '
King of Prussia, PA 19406 Office of the Resident inspector .
U.S. Nuclear Regulatory Commission !
P.O. Box 136 Lycoming, NY 13093 Mr. Brian C. McCabe Project Directorate 1-1
~
Division of Reactor Projects -1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 2
i
! l I
l .
l l
l
References:
- 1. NYPA letter, R. E. Beedle to USNRC dated June 5,1992, JPN-92-028 regarding proposed changes to the Technical Specifications regarding power uprate (JPTS-91-025).
- 2. General Electric Co. Report " James A. FitzPatrick Nuclear Power Plant SAFER /GESTR-LOCA Loss-of Coolant Accident Analysis,"
NEDC-31317P-1, Revision 1 dated August 1991.
- 3. NRC letter, B. C. McCabe to D. J. Robare (GE) dated March 4, )
1993 regarding request for withholding information from public disclosure, TAC M83182.
1 Attachments: 1. General Electric Report, " James A. FitzPatrick Nuclear Power Plant, SAFER /GESTR-LOCA Loss-of-Coolant Analysis," NEDL-31317P, Revision 2, DRF-A00-03843, Class lit, April 1993. ,
- 2. Affidavit by David J. Robare, General Electric Project Manager, Plant Licensing, regarding GE proprietary report NEDC-31317P-2, Revision 2, signed May 7,1993. ,
i l
f I
l 3
i I
l
-. - . . - . ~~
GENERAL ELECTRIC COMPANY AFFIDAVIT I, DAVID J. ROBARE, being duly sworn, depose and state as follows:
(1) I am Project Manager, Plant Licensing, General Electric Company ("GE") and have been delegated the function of reviewing the information described in paragraph 2 which is sought to be withheld, and have been authorized to apply for its withholding. ,
I (2) The information sought to be withheld is contained in the GE proprietary report NEDC-31317P, " James A. FitzPatrick Nuclear Power Plant SAFER /GESTR-LOCA Loss-of-Coolant Accident Analysis", Revision 2, Class III, dated April 1993.
(3) In making this application for withholding of proprietary information of which it is the owner, GE relies upon the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 USC Sec. 552 (b) (4 ) , and the Trade Secrets Act, 18 USC Sec. 1905, and NRC regulations 10 CFR 9.17 (a) (4) , 2.790 (a) (4) , and 2.790(d) (1) for " trade secrets and commercial or financial information obtained i from a person and privileged or confidential" (Exemption 4). The material for which exemption from disclosure is .
here sought is all " confidential commercial information",
and some portions also qualify under the narrower definition of " trade secret", within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Enercy Proiect v. Nuclear Reaulatory Commission. 975F2d871 (DC Cir. 1992), and Public Citizen Health Research Group v. FDA, 704F2d1280 (DC Cir.
1983).
(4) Some examples of categories of information which fit into the definition of proprietary information are: l,
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license fron General Electric constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his l
l i
n q
competitive position in the design, manufacture, j shipment, installation, assurance of quality, or
- licensing of a similar product- t 4 t I
- c. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of General Electric, its customers, or its l suppliers;
- d. Information which reveals aspects of past, present, or future General Electric customer-funded development plans and programs, of potential commercial value to General Electric;
- e. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The information sought to be withheld is considered to be proprietary for the reasons set forth in both paragraphs (4)a. and (4)b., above.
(5) The information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized ;
disclosure, are_as set forth in (6) and (7) following. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GE, no public disclosure has been made, and it is not l available in public sources. All disclosures to third j parties including any required transmittals to NRC, have ;
been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provide for maintenance of the information in confidence.
(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitivity of the information in relation to industry knowledge. Access to such documents within GE is limited on a "need to know" basis.
(7) The procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitivo effect, and determination of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and i
t
l potential customers, and their agents, suppliers, and licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary agreements.
(8) The information identified in paragraph (2) is classified as proprietary because it contains detailed results of analytical models, methods and processes, including computer codes, which GE has developed, obtained NRC approval of, and applied to perform evaluations of the loss-of-coolant accident for the BWR.
The development and approval of the loss-of-coolant l accident computer codes used in this analysis was achieved !
l at a significant cost, on the order of several million dollars, to GE.
The development of the evaluation process along with the
! interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.
(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to GE's competitive position and foreclose or reduce the availability of profit-making opportunities. The information is part of ;
GE's comprehensive BWR safety and technology base, and its commercial value extends beyond the original development cost. The value of the technology base goes beyond the :
extensive physical database and analytical methodology and includes development of the expertise to determine and I
apply the appropriate evaluation process. In addition, the technology base includes the value derived from providing analyses done with NRC-approved methods.
The research, development, engineering, analytical, and NRC review costs comprise a substantial investment of time and money by GE.
The precise value of the expertise to devise an evaluation process and apply the correct analytical methodology is difficult to quantify, but it clearly is substantial.
GE's competitive advantage will be lost if its competitors are able to use the results of the GE experience to normalize or verify their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions.
The value of this information to GE would be lost if the information were disclosed to the public. Making such
l 1
i I
)
t information available to_ competitors without their having i been required to undertake a similar expenditure of ;
resources would unfairly provide competitors with a l windfall, and deprive GE of the opportunity to exercise its 'I competitive advantage to seek an adequate return on its large investment-in developing these very valuable analytical tools.
i i
i t
STATE OF CALIFORNIA ) l 4 ) SS: r COUNTY OF SANTA CLARA ) j i
. David J. Robare, being duly sworn, deposes and says: {
. That he has read the foregoing affidavit and the matters stated f therein are true and correct to the best of his knowledge, j information, and belief. i 7W l
Executed at San Jose, California, this day of MAY , 19 2 !
David J. Robare !
General Electric Company Subscribed and sworn before me this day of Y (I M , 19 b 0 t O u$tu kWMu Notary Public, State ()cif California -l
___m-
_ i
_. OFFICI AL SEAL j i *
- PAULA F HUSSEY -
no,ru cn- wcmA [
$ANTA CLAP.A COUNTY - !
i i
I i
3/30/93
] .
_ - .. _.