Forwards Summary of Environ Protection Program Re Const of Unit for 6-months Ending 900630,per Exhibit 2-A in Subsection 3.E.1 of CPPR-119
ML20055J055
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/27/1990
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AECM-90-2-0003, AECM-90-2-3, NUDOCS 9008010011
Download: ML20055J055 (3)


Text

-

= Entergy l"' g'T*" "* '"'- u Operations m" o m*"*S 3= 1^

Te! G)1.J17 6109 W. T. Cottle yee wwr3 July 27.-1990 *

  • om

\

i l

I i

U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention: Document Control C.)sk Gentlemen:

SUBJECT:

-Grand Gulf Nuclear Station  !

Unit a Docks do. 50-417  :

Construction Permit No.--CPPR 119 j Transmittal of Environmental ,

Protection Program Report for Six  !

Months Ending June 30, 1990 l AECM-90/2-0003- 3 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 }

for Six Months Ending June 30, 1990." This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Permit No. CPPR-119, i

Yours-truly,

VTC:beb Attachment c-:2 2r m cc: Mr. D. C. Hintz (w/a)

Mr. T. H. Cloninger (w/a) R Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a) i Mr. H. L. Thomas (w/o)

Mr. H. O. Christensen (w/a)  ;

('~s~'..'. 9 Mr. Stewart D. ' Ebneter (w/a)

Regional Administrator 1 U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 11D21 Washington, D.C. 20555  ;

+

9008010011 900727 -17

-A9007241/SNLICFLR -'1 CO f-kDA ADOCK0500g7

Attachment'to-AECM-90/2-0003 !

~

SUMMARY

OF ENVIRONMENTAL PROTECTION PROGRAM--

RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX MONTHS ENDING JUNE 30. 1990 Construction Highlights Unit 2 construction was suspended in' September 1985 with approximately 35% of field construction completed based on-the ,

estimated manhours needed to complete the Unit. Minimal Unit 2 activities were for the purpose of long term equipment and 4 strJctural maintenance.

V9.hicular Movement

- No "off limit" violations were observed during the reporting. period.

M t Control No dust control violations were observed during the reporting period.

Smoke Control No smoke violations occurred.during the reporting period.

The GGNS Burn Pit, which was officially closed on February 22, 1990,

.was filled with dirt during the week of June 11, 1990 thus prohibiting any future use.

Erosion Control Rainfall was recorded on 45 occasions during the reporting period, I with an accumulated total of 35.96 inches.

l Chemical & Solid Waste Control

.No violations or improprieties of Mississippi waste disposal' regulations occurred during the reporting period.

Noise Control l

No excessive noise levels were detected during the reporting period.

l l Sediment Basins A &_Q There were no construction-associated problems with Sediment Basins.

ALor B during the reporting period.

A9007241/SNLICFLR - 3

,' Attachment to AECM-90/2-0003 I ~

Regional Groundwater Wells The twelve regional groundwater wells were read 13 times during the reporting period with no problems encountered.

Vegetation Survev No vegetational abnormalities were observed during the reporting period.

Transmission Lines Transmission line surveys were suspended in 1988 based on the stabilization of soil and vegetation observed along these lines during-previous surveys.

(

A9007241/SNLICFl.R - 4