0CAN079015, Discusses Clarification to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Surveillance Sampling Being Performed Monthly & Analyzed Prior to Loading/Releasing Each Load to Russellville Municipal Sewage Sys
ML20055J026 | |
Person / Time | |
---|---|
Site: | |
Issue date: | 07/26/1990 |
From: | Ewing E ARKANSAS POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
0CAN079015, CAN79015, NUDOCS 9007310289 | |
Download: ML20055J026 (2) | |
Text
"a
- -~ En t
=~n o-Rvo 3. Etw 137G
. w.
nS w* m nsoi Te! 501-964 3100 July 26, 1990 BCAN079015 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, D. C. 20535
SUBJECT:
Arkansas No.: lear One - Units 1 and 2 Docket Nos. 50-313/50-368 License Nos. DPR-51 and NPF-6 Clarification to Inspection Report 50-313/90-04; 50-368/90-04 Gentlemen:
The subject inspection report discussed the inspector's review of an event 1 l in which low-level contaminated liquid waste from the ANO sanitary sewage !
treatment facility was transferred to the Russellville Municipal Sewage Treatment System. The inspection rep rt included a description of corrective actions taken in response to this event. As discussed on July 1 l 5, 1990, with Mr. Blaine Murray of the NRC Region IV staff by Messrs. Bill McKelvy, Rick King, and Ms. Julie Jacks of the ANO staff, some of these l corrective actions have changed since the time the inspection was i performed. i i
The source of the contamination was suspected to be_certain waste water from Unit One. Once this source was isoiated from the sewage treatment facility, measurable activity was not detected in the ANO sanitary sewage -
samples. Therefore, the weekly surveillance sampling and daily composite samples were determined to be no longer necessary. Surveillance sampling is now being performed on a monthly basis. Samples are being taken and analyzed prior to loading and releasing each load to the Russellville
~
Municipal Sewage System. This action will prevent recurrence of the event.
05C.
9007310289 900726
{DR ADOCK0500g3 '
ygg/
'lo
U. S. NRC ,
July 26, 1990 Page 2 If you have further questions regarding this event or the corrective actions currently being taken, please contact Mr. James J. Fisicato at
- 501-964-3228. >
Very truly yours,
. C. Ewing General Manager, Assessment ECE/JDJ/sgw cc: Regional Administrator Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlirgton, Texas 76011 L
l t
I i
,.