JPN-90-016, Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown

From kanterella
(Redirected from ML20055C280)
Jump to navigation Jump to search
Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown
ML20055C280
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/21/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JPN-90-016, JPN-90-16, NUDOCS 9003010167
Download: ML20055C280 (2)


Text

{{#Wiki_filter:_A

     =;
    - 3                         123 Main street
    -i#
     +7 i

White Pla;ns, NewWyk10601

e. 914 081 6240 g -{ .

Newb & h r sonac. area.

                      & Authority                                                                                   M%'?"'

JPN 90-016 - February 21,1990 A U.S. Nuclear Reguiatory Commission Mall Station P1 137 Washington, D.C. 20555 ATTN: Document Control Desk

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50433  : Proposed Changes to the Technical Specifications Regarding RHR Pump Operability (JPTS 90-002)

Reference:

1. NYPA Letter (JPN-90-013), J.C. Brons to NRC, dated February 9,1990, requesting changes to the RHR Pump Tecnnical Specifications on an <

exigent basis, q

Dear Sir:

Reference 1 requested temporary relief from the requirements of the James A.  ! FitzPatrick Technical Specifications to avoid the potential for a premature plant shutdown. 'l The Authority requested that this amendmcnt application be processed _on an exigent basis j under the provisions of 10 CFR 50.91(a)(6), since insufficient time existed to provide for a 30 day public comment period. l 1 a The Authority has discussed this submittal with the NRC staff and understands that the f ' time period for processing an exigent amendment application has since expired. In . accordance with 10 CFR 50.91(a)(5), the Authority requests that the proposed changes transmitted in Reference 1 be processed on an emergency basis. Approval of this amendment application is required no later than February 25,1990 to - l avoid the potential for a premature plant shutdown. l Should you or your staff have any questions regarding the proposed changes, please i contact Ms. S. M. Toth of my staff. Very truly yours,  :

                                                                                         . Brons
                                                                         }l tt.1Ex      ve Vice President M     Nuclear Generation p          anname, roc n

p J4 Ok j q _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _o

        **' , '         e cc:

Regional Administrator /;' U.S. Nuclear Regulatory Commission 1

                                   ' 475 Allendale Road King of Prussia, PA 19406                                                             l l

Office of the Resident inspector U.S. Nuclear Regulatory Commission . l . P.O. Box 136 Lycoming, NY 13093 1 Mr. David E. LaBarge Project Directorate 11-Division of Reactor Projects 1/11 U.S. Nuclear Regulatory Commission Mall Stop 14 B2 Washington, DC 20555 Ms. Donna Ross New York State Energy Office l 2 Empire State Plaza 16th Floor Albany, NY 12223 I l l' e I