Monthly Operating Rept for May 1982
ML20054F147
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/09/1982
From: Ruiter G
WISCONSIN PUBLIC SERVICE CORP.
To:
Shared Package
ML20054F143 List:
References
NUDOCS 8206150258
Download: ML20054F147 (4)


Text

.

COCKET 50-305 i

k' KEEAUNEE NUCLEAR ECWIB PLANT

SUMMARY

OF OPEBA1ING EXPERIENCE May, 1982 l

OP ER ATIONS: The reactor coolant system was filled and vented on May 15.

f The reactor was in hot shutdown on May 17.

The reactor coolant s} stem integrity test was completed on May 17.

Initial criticality was achieved for Cycle VIII on May 20.

On May 22, zero scwer physics tests were completed.

On May 23, the unit was returned to service however, the reactor tripped on 10-10 steam generator level during startup. The unit was returned to service later on May 23.

cn May 24, the unit was removed from service for turbine overspeed and torsion tests. Later on May 24 the unit was returned to service.

The unit was at 90% reactor power at the end of the month.

P. A I NT EN A NC E: The Unit was returned to service folloVing the ref ueling outage on May 23. Feguired surveillance testing was completed.

Replaced solenoid valve coils for a feedwater bypass valve.

b $c h5803000393 820609 R

PDR

. PAGE 2 Peplaced an incore detector. ,.

Freventative maintenance on equiprent was performed.

Bepaired or replaced nusecous valves.

Belocated a MCC and incpected and replaced equipment as per 79-018 requirements.

Upgraded start circuitry en Diesel Generator 12.

Besoved FCP trip on SI signal per CCF.

Inspected a FCP so t o r.

Inspected and replaced, as required, seals on a FCE.

Fepaired containrent fan coil units.

Installed a PCP oil collection system.

Installed doors in a centrol room A/C duct.

Completed piping and electrical work associated with TMI modificaticns.

Installed new seals and bearings in a CC pump.

Feplaced a seal on a FEF pump.

Replaced a de fect ive relay in the Bus 1-5 undervoltage protection circuit.

AV E9 AGE D AIL Y UNIT PCW EE E EVEI EOCKET No- 50-305 UNIT- KEWAUNEE CCMELETED BY- G. B. BUITEE l TELEPHONE- 414-388-2560 1225 '

I DEECFT MCETH ERY, 1982 AVERAGE EAILY DAY PCNES LEVEL

( M N E- N ET) 1 0 2 0 3 0 4 0 5 0 2 6 0

! 7 0 8 0 3

9 0 10 0 1 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 0 21 0 22 0 23 16 24 89 25 226 26 381 27 389 28 390 29 389 30 389 31 422 l

i

OP E B ATI E G D 8T A T EPO BT '.

L- CCCFET NO- 50-305 .

CCPfLFTED DT- G. B. ROIT7P O P E B RTI E G STATUS TEIEPac5E- 414-388-2560 1225

' L, 1 DNIT NAEE FEMA 03EE **********************************************

. (. *

  • 2 BEFCBTIDG FESIOC MAY, 1922
  • NC115
  • b- 3 LICf5 SIC THfPMAL FCVER (PUT) 1650 ** 1he unit was returned to cretation on
  • Pay 24, for po*er escalation in
  • 4 NA5ffLATE PATI 5G (GFCSS MBF) 56C
  • acccedance with post-re f ueling testing *

' L-

  • requirerents. The unit was at 9C1
  • 5 DESIGN IEECTRICAI R ATING (NET FWE) 535
  • yoner on May 31
  • L' 6 MAIIP05 CEFE5CAELE CAPACITY (GPOSS PRE) 538 *
  • s 7 MAIIPUR DEFENCAEIf CAPACITY (NET MSI) 515 **********************************************

8 IF CHANGES CCCCF IN CAPACITY F8TI5GS (ITEPS SUPEE5 3 TE5COGE 7) SIECE LAST EETCET, GIVE BERSONS Bone u . j v

9 TCVE9 LITEL TC SBICB BESTPICTf t, IF ABY (NET MSY) Ncae

~

s 10 BEASCNS-FOR BES1RICTIONS, IF All THIS MC51B TB-TC-DATE COBOLATIVE v s 11 HOUBS *I FEECBTING PERICD 744 3624 69769

'V 12 NDPPER CF HC0fS BFACTOR BAS CRITICAE 247.5 2623.4 58625.3 s 13 FEAC108 BESTRTI SfDTECHN HCDPS 0.0 0.0 2330.5 4 a 14 HCDPS GENERATCB 05-IINE 191.1 2566.5 57373.3 s- 15 UNIT RESIRTE SV1DCBB HCDPS 0. 0 0.0 10.0 s 16 C POSS T BIRM 3L E n f BGY GE5f9ATED (51H) 208610 4027926 82844860 v ,

17 GROSS EIICTSICAL INIBGY GINIPATEC (PNB) 68900 1317600 29270000 Y 18 NRT ILICTRICAL IEfBGY GE5ESATEC (R9 P) 645E7 12567C1 27856958 ,

19 UNIT SEftICI FACTOR 25.7 70.8 82.2 4 ,

20 UNIT ATAILABIIITY FACTOB 25.1 70.8 82.2 we 21 DNIT CAPsCITY FACTCB (OSING Mtc NET) 16.9 67.3 76.4 s 22 UNIT CAP ACITY F#CTOR (USING DEF BET) 16.2 64.8 74.6

~'

J 23 DNIT F0BCED COTAGE FATE 3.3 O.3 4.6 4- 24 SHOTDOWNS SCHICOLfD CTES NEIT 6 ECM1BS (TIP E , EATE, A50 DURATICF CF EACH) ,j Bore

%- 25 IF SBUT CCW5 AT E 50 CF TEFCBT PERIOC, YSTIMATEC D ATF CF ST AFTUP - N/ A ,j

^

? * * ' *

'p . .{ '

' .ypM ' j

L ,

L UNIT SBUTDOS 5 S A ND F0W EB BEDUCTIOWS b CCCKPT 40: 50-3C5 USIT 5AME: rewacnee DATP: June 1, 1982 b COMPLETYD EY: G. R. Butter TfttPBCNf: 414-388-25tc x225 L

PEECST ECRTH - 57!, 1982 L } NO. l DATE l TYPE iDDR ATICNj RE A505lMf1HCDl LER MUMBfB iSYS lCCFfCNENT l CO P E F ET S l 1 1  :  :  :  :  :  :  :  : 4 I I I I I ] I I I I I L I 4 1 5/ 1/829 S I 540.4 i C ] 4 1 N/A I 22 l 222222 1 4 Continued the Cycle VII-TIII refuel catage. I I I J l i I I I I I The outage was concluded on 5/23/e2 at 1226 I I I i l I i I i i  ! Bours. I b I I I I I I I I I I . 1 -

l 5 I 5/23/828 F I 6. 6 i G I 3 i N/A 1 CH l 222222 1 5. A reactor /turkine trip occurred en Ice-Icv S/G l l 1 I I I I I I I I level during power ascension while transfering l

' I i 1 1 I I I I I I 5/G tevel Control from manual to automatic. I s

! I I I I I I I I I I i 6 1 5/24/821 S I 5. 9 i B l 1 1 3/A I EA 1 TURBIN I 6. A short outage.vas taken to perfcts tutkine 1 V i i I I I i 1 I. I I overspeed and torsion tests. I s i I I I I I I I I I I I I I I I I I I I I I L 1 1 I I I I I I I I I s I I I I i 1 1 I I I I I I I I I I I I I I I

' I I I I I I l i I I I s

! I I I I I I I I I I I 1 l I I I I I I i 1

' 1 I i 1 1 I I I I I I s i i 3 I I I I I I I I I I I I I I I I I I I

' 1 I I I I I I I I I -

I -

1 I i 1 1 1 I I I I I I I I I I I I I I I I

' I I I I I I I I I I I -

1 I I I I I I I I I I I I I I I I I I I I 1.

  • I I 't I I I I I I I I -

l 1 I I I I I I I I I

!  !  !  !  !  !  !  !  ! ' J v ,

TYPE f!ASCM EFTBCD SYSTER & COMPONFNT CODES

% a F: Forced 7-Equipment Fallere IExplain) 1-Manual From NOREG-0161 S: Scheduled E-raintenance or Test 2-Manual Scras b- C-Fefueling 3-Automatic Scraa s C-Fegulatory Bestriction 4-Continuaticas

, I-CFerator Training C License Examinatica

  • 5-toad Reductions be F-Administrative 9-Other ,/

G-Cperaticnal rrror ifxF lain)

E-C t he r triplain)

  • J 7 - [4 'f I'
  • i 'l.% *d.][, T ' ' , . .j" ' i

[{

5 '

'(([

m. ,

'{ <

_f*