ML20049J900

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1981
ML20049J900
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 09/15/1981
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20049J897 List:
References
NUDOCS 8203290197
Download: ML20049J900 (17)


Text

3 OPERATING DATA REPORT l l

DOCKET NO. 50-269 DATE 9-15-81 COh!PLETED BY J. A. Reavis TELEPHONE 7nA 179 R552 OPERATING STATUS ,

Oconee Unit 1 Notes

1. Unit Name:
2. Reporting Period: Aunust. 1981 Year-to-date and cummulative capacity factors are calcu-
3. Licensed Thermal Power OlWt): 2568 lated using a weighted
4. Nameplate Rating (Gross $1Wel: 934 f
5. Design Electrical Rating (Net 31We): 886 dependable capacity.
6. .\taximum Dependable Capacity (Gross StWel: 899
7. Staximum Dependable Capacity (Net StWe): 860 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reas6ns:

None

9. Power Level To Which Restricted if Any (Net N!We): None
10. Reasons For Restrictions. lf Any:

This hionth Yr. to.Date Cumulative

11. Hours In Reporting Period 744.0 5,831.0 71,256.0 0.0 3,689.2 50,975.2
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0.0 3,658.7 48,242.8
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (.\ lWH) 0 8,990.912 113,445,299 17 Gross Electrical Energy Generated (StWH) 0 _,

3,174,500 39,476,330'

18. Net Electrical Energy Generated ($1WH) - 2,338 3,017,356 37,365,365
19. Unit Service Factor 0.0 62.8 67.7
20. Unit Availability Factor u.0 62.8 67.8
21. Unit Capacity Factor iUsing 5tDC Net) 0.0 60.2 60.8
22. Unit Capacity Factor iUsing DER Net) _

0.0 58.4 59.2

23. Unit Forced Outage Rate 0.0 13.8 6.6
4. Shutdowns Scheduled Over Nest 6 5tonths (Type. Date.and Duration of Eacht:

Currently Refueling

25. If Shut Down At End Of Report Period. Estimated Date of ',t:rtup:

26': Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COstNtERCIAL OPER A TION 1

8203290197 810915 l PDR ADOCK 05000269 (9/771 R PDR

?

  • l! Nil SilillDOWNS AND ImWl.it lil:DUCIIONS DOCKET NO. 50-269

~

UNIT N AME Oconee Unit l' DATE 9-15-81

lit:l'Olt i MON ill August, 1981 COMPLETEI) gy J. A. Reavis TELE!*llONE 704-373-8552

=- e.

=

i wN

_, = X l. n.enscc

-  ?

s";. C.iuse & Correceive

~ie g -to N"- D "C

i.  ? 4 is5 I vent py s?L Actionso .

H d I. ch j y, - 'tcpue s n :2 0 , l'revent f(ccur ente 6

S 5 81-08-01 E 744.00 C -- RC FUELXX Scheduled refueling and inspection (10 year) continues.

NRC required modifications in progress.

i I - .I .

I l ini cal iteasiin - y c , g n ,,g .

E xliibit G .'Instinctions S Silicilnicil A -1 iguipinen Itailnie (I spl.un) i M.innal :eir Picparation of Data ll Mainten.inie or l'ess y.g.,nual Sesain. 1:ni,3 sticeig r,n 3,icen C l(eincling ,t. Anioin.iiie 3,, ini, g;ye,,, g,p,,, g g ; ,gc gzg ygg,,gy,g, g.see D ltegulator) ltesenceton . .0 1,..e g ial'l 'in i O t til l

~

i Upcianos Is.uning X 1 siens. I unnn.iii..n l'- A.innni>s sative 'g G Ogwr.itnnial I si .: (l%pl.iin) g3 g,;g,,, g , 33,ne 3,,g,.,.

l/ Ill 11 Ollies(1:Spf.ine)

--_m______m_ m__m__ _ _ _ _ _ . _ , _

l l

o. AVERAGE D AILY L* NIT ?OWER LEVEL DCCKET NO. 50-269 0 nee Unit 1

.lT D ATE 9-15-81 COMPLETED BY, J. A. Reavis TELEPHONE (704)373-8552 310NT11 August, 1981 DAY AVERAGE DA!LY POWER LEVEL 1AY AVERAGE DAILY POWER LEVEL IMWe Nec) i31we. Net, g _

2 l3 3

4 20 3

5 ..

7 ,3, 3

9 10 :3 11 ..

12 ;3 g, ,9

. i 14 30

~~ --

15 3; 16 r

!NSTRL'CTIONS

.Cn t.'.is fer .si. list :ne v.er:ge jai!y .i: ..w e. :e. ei ;,, ,twe.se, :.;; e3e,g

. .3., .3,., .,,, 7, , -_, , ,,

e f.estest .sheie .egr.s::-

.o - i s

e

l

  • DOCKET NO: 50-269 UNIT: Oconee Unit 1 DATE: 9-15-81 NARRATIVE

SUMMARY

l MONTH: August, 1981 NRC modifications / refueling maintenance / ten year inspection / continue.

Reactor core support assembly repair is in progress.

e

=

e

y MONTHLY REFUELING IiFORMATION RIOUEST

1. Facility name: Oconee Unit 1 ,
2. Scheduled next' refueling shutdcun: June, 1981 ,

3 '. Scheduled restart following refueling: December, 1981 .

4. Will refueling or resumption cf operation thereafter require a technical specification change or other license amend =ent? Yes ,

If yes, what vill thes'e be? Technical Specification Revision '

If so, has reload design and core configuration been reviewed by Safety Review Co-~4 ttee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA .

3. Scheduled date(s) for submitting proposed licensing action and supporting information: April, 1981 ,
6. l=portant licensing considerations (new or different design or suppli6t, unreviewed design or performance analysis nethods, significant changes in design or new operating procedures). None
7. Nu=ber of fuel asse=blies (a) in the core: 0 .

(b) in the spent fuel pool: 542* . .

8. Present licensed fuel pool capacity: 1312* .

Size of requested or planned increase: None .

9. Projected date of last refueling which can be acccc=odated by pressnt licensed capacity: .

4 DUK.E POWER COMPANY Octe: September 15, 1981 ,

llase of

Contact:

J. A. Reavis .

  • Represents total for the combined Unit 1 and 2 Spent Fuel Pool

?

C*

OPERATING DATA REPORT .

DOCKET NO.

DATE 9-15-81 COMPLETED BY .J. A. Reavis TELEPHONE 7nA 171 R552 dPERATING STATUS ,

Notes I. Unit Name: Oconee Unit 2 August, 1981 Year-to-date and cummulative 4 2. Reporting Period:

capacity factors are calcu-

3. Licensed Thermal Power O!Wt): 2568 lated using a weighted
4. Nameplate Rating (Gross alWei: 934 average for maximum
5. Design Electrical Rating (Net S!We): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:

None 9.' Power Level To Which Restricted. !f Any (Net MWe): None

10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 744.0 5,831.0 61,176.0
12. Number Of Hours Reactor Was Critical 744.0 5,529.7 44,634.6

-- -- ~

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 744.0 5,491.5 43,667.2
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,897,218 13,310,490 103,406,605 17 Gross Electrical Energy Generated (MWH) 648,100 , 4,588,420 35,200,656
18. Net Electrical Energy Generated (MWH) 619,432 4,386,646 33,429,212
19. Unit Service Factor 100.0 94.2 71.4
20. Unit Availability Factor 100.0 94.2 71.4
21. Unit Capacity Factor (Using MDC Net) 96.8 87.5 63.3
22. Unit Capacity Factor iUsing DER Net) 94.0 84.9 61.7
23. Uni Forced Outage Rate 0.0 0.7 16.1
24. Shutdowns Scheduled Over Next 6 Months IType. Date,and Duration of Eachi:

Refueling - September 27 - 12 Weeks

25. If Shut Down' At End Of Report Period. Estimated Date of',:artup: -

26; Units in Test Status ! Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY I

INITIAL ELECTRICITY COMMERCIAL OPER ATION f

f _

_ . _ _ _ - _ _ _ _ _ _ _ . .- . . ._ _. . - _~

~

IINil~ SilulDOWNS ANI) POWl;it itEl30c3l()Ns DOCKET NO.

UNIT N AME Oconee Unit 2 DATE 9-15-81 COMPLETEI) IlY J. A. Reavis

.. I(1:Pf)lt i AION ggg August, 1981 TELEPflONE 704=373-8552 c en 3 :.,. 5 _ 3 EX

, i :- , l.kcosec 5 -r,, s I. Cause & Curreceive No. 17.it e g gg -

j gy g. vent 3? M Adinn in -

H

$I rt 2gC l(clun t ': SU ED , Prevent l{ccutscnte

{ v o

9-p 81-08-21 F --

A -- SC PENETR 2Al reactor coolant pump (RCP) was removed from service to check con-tainment electrical penetration EMV-2 l

for leakage.

i-.e.w i

I 2 .i .:

I linset! Hea>nn- Meilnnl:

Exhibit G 'instanceiim S. S lecilnic.l A l'ignepinen I .nline (I splain) 1 Mann.al for Preparat on of Data ll Mainten.inic or l'es .!.M sun si Scrant- lintry Slice:S fin 1.icensee C l(elucting .l. Anioni.it se Sir.nn. 1:veni Repuri (i.lilt } l:,le iNL lti.G.

11.ltegulatin) Itesen.non .l t):1 e. ( L xpl.inig o g g. )

i Upciaio: learning .t I si cnw I unnn.sti..n l' A.Innni>teatne 3

. G Operanon.il I not (ISplain) 3;,ggiig,ii g . 33,ne Sonsee t*8/11) II Ollice Ilimplans)

t

! .* AVERACE D AILY L'N!T POWER LEVEL 3

5 DCCKET NO. 50-270 ,

g.lT Oconee Unit 2 i 9-15-81 '

l DATE COMPLETED BY, J. A. Reavis ,

TELEPHONE (704)373-8552 i

1 f

.\t0NDI A"E"8E' I981 DAY AVERACE DAILY POWER LEVEL DAY AVER AGE D ALLY Pow ER LEVIL t.\the.Nec t i.stw e. Net s

g 840 g. 837 -

, 840 838

- 13  ;

3 837 838  ;

39 4 837 l0 836 i 5 836 og 700 4

3 6 837 832

836 ,3 838

, s 831 4 837  ;

9 837 837 10 838 3 832 -

3 838 . 837 -

1,-

838 837 i 23 12 838 :9 838 i4 838 30 13 838 3, 835 g6 839

!NSTR L'CTIC,NS Cn i.".:s ictr st lat :he c.er:ge si!y .. n .;wer 'e. ei .,3 ',twe s e u . . r n e , . :., . . , , . .. .. . . ; , , ,, , ,,

~

  • .e r,carest 4neie e;:w:::

,4 - g 4

A d

e

.- ,--m. .-.,r. w, , m - -p r - r, , , - , , - . - - - - ,-c3---rw-, y a 1 .r-..,--,c,,,-r y + .

DOCKET No: 50-270 UNIT: Oconee Unit 2 DATE: 9-15-81 NARRATIVE

SUMMARY

MONTil: August, 1981 Oconce 2 had no outage during August.

> A power reduction was necessary on August 21 to investigate gas leakage on dN-2 (reactor containment electrical penetration for 2A1 reactor coolant pump). The pump was off during the investigation.

O e

e G

I

?

MONTH 1.Y RETUELt!!G IMTOPJtATION RICUEST

1. Facility nane: Oconee Unit 2 , ,
2. Scheduled next refueling shutdevn: September, 1981 ,
3. Scheduled restart following refueling: December, 1981 i

4 Will refueling or resumption of operation thereafter require a technical '

i specification change or other license a=end=ent? Yes .

m i If yes, what vill thes~e be? Techncial Specification Revision i

I j If no, has reload design and core configuration been reviewed by Safety l Review Co:smittee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA .

1 -5. Scheduled date(s) for submitting proposed licensic; action and supporting I inf orsa tion: May, 1981 ,

6. 1=portant licensing considerations (nev or different design or supplict, unreviewed design or performance analysis methods, significant changes in j design or new operating procedures).

?

1 1

l l 7. Nu=ber of fuel asse=blics (a) in the core: 177 ,

1 (b) in the spent fuel pool: 542* ,

8. Present licensed fuel pool capacity: _1312 .

Size of requested or planned increase: None ,

9. Projected date of last refueling which can be accc==odated by present licensed capacity: {

4 .

DC'E PC'4ER CCMPA!Pt hee: September 15, 1981 ,

l'ame of

Contact:

J. A. Reavis .

l

  • Repre'sents total for the combined Unit 1 & 2 Spent Fuel Pool.

-+

s.- 7 d T *e--~ - - --'--

. - - - ._ _ _ - . _ _ _ __- _ . _ _ _ . _ = - -_ _ _ _ _ _ _ _ _ _ - - - - _ = .

o OPERATING DATA REPORT j DOCKET NO.

50-287 j l DATE 9-15-81 COMPLETED BY J. A. Reavis TELEPHONE 70A 171 R552 OPERATING STATUS .

1. Unit Name:

Oconee Unit 3 Notes August, 1981 Year-to-date and cummulative

2. Reporting Period: _

capacity factors are calcu-

3. Licensed Thermal Power Otht): 2568 lated using a weighted
4. Nameplate Rating (Gross MWel: 934 average for maximum 5.< Design Electrical Rating INet MWe): 886
6. Muimum Dependable Capacity (Gross MWe): R99
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Ress6ns:

None

9. Power Level To Which Restricted. lf Any (Net MWel: None
10. ;tessons For Restrictions. lf Any:

This Month Yr..to.Date Cumulsiive II. Hours In Reporting Period 744.0 5,831.0 58,823.0 -

12. Number Of Hours Reactor Was Critical 741.2 '4,009.4 42,413.4
13. Reactor Reserve Shutdown !!ours
14. Hours Cencrator On Line 734.0 3.944.3 41.473.3
15. Unit Reserve Shutdown llours -- -- --
16. Gross Thermal Energy Generated (MWH) 1,849,096 9,869,797 100,174,138 17 Gross Electrical Energy Generated (MWH) 628,880 _, 3,397,830 34,629,044
18. Net Electrical Energy Generated (MWH) 599,893 3,231,767 32,946,162
19. Unit Service Factor 98.7 67.6 70.4 a 20. Unit Availability Factor 98.7 67.6 70.4 c 21. Unit Capacity Factor (Using MDC Net) 93.8 64.5 64.9

) 22. Unit Capseity Factor :U>ing DER Net) 91.0 62.6 63.2 l 23. Unit forced Outage Rate 1.3 3.4 15.8

24. Shutdowns Scheduled Oser Nest 6 Months IType. Date.snd Durstion of Eachi:

None 1

25. If Shut Down At End Of Report Period. Estimated Date of Lt:rtup:

261 Units in Test Status (Prior to Commercial Operationi: Forecast Achieved I

INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATlON I

sti!!? ;

s 50-287 IINil Siltill) OWNS AND POW 1 R ltI:pucggons DOCKET NO.

UNIT N AME Oconee Unit 3 j DATE 9-15-81 <

i

litroRI AloNill August, 1981 COMPLETED !!Y J . A. Reavis lELEPil0NE 704-373-8552 c

-, -!E ' l- , [5 1.sternce [t, h, Cause & Currective ,

N- lh'c H

? j is5 I.vcne 3y WU si Action to -

f I_ r2 ~ 5, = Hepose e EU . Preveni Reassacnte g u o

10-p 81-08-01 F --

B --

AA TURBIN Completion of turbine valve movement .

test. '

1 11-p 81,08-08 F --

B --

1111 PUMPXX 3D2 IIDP (heater drain pump) repair.

12-p 81-08-14 F --

A --

1H1 PUMPXX 3D2 IIDP tripped.

6 81-08-15 F 9.98 A 3 IIA TURBIN Turbin/ reactor trip due to oil leak on turbine controi system (EllC) .

1 13-p 81-08-16 F A --

Cil VALVEX 3 FDW-62 valve repair (3B feedwater pump suction relief valve).

4 1 .' 1

, l I l .ni cil ,te.non- Meitn il: thhibit G 'Insiinctiinn S Siletilieleil A l'qmpmeni I .ntme f I splaml i Manual for Preparation of DJs.a 11 M.sinien.mce or Icss 2 M.anual Scrain. I:nis) Sheets fin lxensee t' Hctuelmg; .' Autom.niec Sis.im. liven Repmt ll.I HIl'ile INilRI.G-li ites;nl.sius) Resto seon l Osteen ll.wplaml 01611 I t pp ce.iio leanH"r A i u tuw I unon.iii..n I'. A.Inoni> aisve 5 G Opciaie.nial I nur llNplaml thhileit I Same Source

s/11) 11 Other ( thplam l 4

. AVERAGE D A!LY L* NIT POWER LEVEL 50-287 DCCKET NO.

l.31T Oconee Unit 3 DATE 9-15-81 COMPLETED BY, J. A. Reavis TELEPHONE (704)373-8552 August, 1981 310 NTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY ?OWER LEVEL (31We-Nec > t 31we.Neti ,

g 834 808 .

836 g3 834 3 834 39 836

.t 834 836 20 834 836 3 3

. 834 832

  • 22 7 835 , 827 3 812 ;4 810
9 787 3 ' 793 10 833 -

3 833 gg 834 835 835 835 I,-

23 I,

834 837 29 826 836 14 30 I5 584 , 835 21 16 389 INSTRUCTIONS

'Crt t?.is ict: st. hst tr.e r.er:ge j:t'y ,; .it ;.;w er e. c ;,3 *,1We Net :,.; e3ep, 33.,

.,.3,.,_,..ng.., ,(,, ., , ,g,,

'?.: r.est:st A rtete . c; w:t:

1 ri - i

f DOCKET NO: 50-287 UNIT: Oconee Unit 3 DATE: 9-15-81 NARRATIVE

SUMMARY

MONTil: August, 1981 Oconec 3 began August completing a turbine valve movement test and returning to full power.

' Power was reduced to 90% on August 8 for 3-D2 HDP (heater drain pump) main-tenance. It returned to service on August 9. On August 14 3-D2 HDP tripped and was returned to service in a couple hours.

On August 15 at 1708 an oil line fitting leak on the turbine control oil system (EHC) resulted in a generator / reactor trip. Repairs were completed and the unit was on-line at 0307 on August 16. The 3 B FWP (feedwater pump) suction relief valve lifted and would not re-seat causing a delay in getting the second FWP in service. Full power was reached on August 17 at 0600.

4 4

, P.ONTHLY REFUELING INFOR.MATION RIOUEST

1. Facility name: Oconee Unit 3 ,

i

2. Scheduled next refueling shutdcun: June, 1982 ,
3. Scheduled restart following refueling: August, 1982 ,
4. Will refueling or resumption cf operation thereafter require a technical '

l specification change or other license amend =ent? Yes .

i If yes, what vill thes'e be?

Technical Specification Revision 6

1 If no, has reload design and core configuration been reviewed by Safety Review Co=mittee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA .

i 5. Scheduled date(s) for submitting proposed licensing action and supporting infor=ation: June, 1982 ,

6. I=portant licensing considerations (new or different design or supplier, unrevieved design or performance analysis nethods, significant changes in design or ncv operating procedures). ^
7. Nu=ber of fuel assemblics (a) in the core: 177 .

(b) in the spent fuel pool: 463 . .

3. Present licensed fuel pool capacity: 474 ,

! Sise of requested or planned increase: None .

9. Projected date of last refueling which can be accc=$odated by presint licensed capacity: .

I .

1 DUKE PCWER COMPANY Octe: September 15, 1981 .

U=e of

Contact:

J. A. Reavis .

, , _ _ _ - . - . - - - _ ..r - ---

o

, i l

)

OCONEE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of July, 4 individual (s) exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.940 rem, which represents approximately 16.2% of that person's allowable annual limit.
2. The total station liquid release for July has been compared with the Technical Specifications annual value of 15 curies; the total release for July was less than 10 percent of this limit.

The total station gaseous release for July has been compared with the derived Technical Specifications annual value of 51,000 curies; the total release for July was less than 10 percent of this limit.

50-269 IINil S!!IllDOWNS AND l'OWI.R REDU(*llONS DOCK ET NO.

UNIT NAhlE Oconee Unit 1 DATE 9-17-81 '

Hi PORI AIONill August. 1981 COMPLETED BY J. A. Reavis TEl.EPilONE 704-373-8552

+

=_. <. 3 a. 5 -

~

5E a53 I '. 5 ., 3*L Cause a Curect-tive

. ', " - 9 "'. y-e:

E

!; .2 _; e I."5

. cne py g?

c- Action i , .

  • rE 0 dE d 55g, Itcrini e u E' , Psevent Recursente o

5 81-08-01 S 744.00 C --

RC FUELXX ,

Scheduled refueling and inspection

. (10 year) continues.

NRC required modifications in progress.

a l 2 .I 3 I I.usicil Reason gicain il:

thliibit C - Instenctions S. Siliciloleil A-l ignepineni I:.ninie ll spl.nn)

I hl.nnial g,,a Preparauun nit' Data il-hlaintenani e os l'est 2.hlanual Scram. 1:nt:) Sheets tin 1.icensee C Heincling ,t. Auloin.itie Scs. ni. livent Repini (1.1:R) 176fc INilRIL D Regul.oring itesisicsson , .l.Olhee (I:xplaini Olt 11

1. Upciato leaining.t laccuse i vaininaan.n l'. A.ino ni>is a uve . 3 G Operational I n..e (INpl. ing g3ggg,;,g ,3" , ,e 3go,c, s

I'8/ / f l H Oilies (1:.spl u.I

_ _ _ _ _ _ _ _ _