MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line ML20084Q9241995-06-0505 June 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 94-49-0,revising TS Section 3/4.1.5, SLCS to Remove Min Flow Rate Requirement for SLCS Pumps ML20083R0031995-05-19019 May 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Change Request 95-02,revising TS Table 3.3.3-3, ECCS Response Times to Reflect Value of 60 Seconds for HPCI Sys Response Time Instead of 30 Seconds ML20082J4001995-04-0606 April 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Requests 94-51 Delete Independent Tech Review Section from TS, 94-52 Delete Nrb Review Section from TS, 94-53 Delete Nrb Audit Section from Ts 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20247M6891998-05-14014 May 1998 Amend 128 to License NPF-39,documenting NRC Staff Approval of Implementation of Plant Mod to Support Installation of Replacement Suction Strainers for ECCS at Plant,Unit 1 ML20217Q5001998-05-0404 May 1998 Amend 127 to License NPF-39,revising Minimal Critical Power Ratio Safety Limits for Operation Cycle 8 ML20217M0731998-03-31031 March 1998 Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively, Revising LGS Units 1 & 2 TS Section 4.0.5 & Bases Sections B 3/4.4.8 Re Surveillance Requirements Associated W/Isi & IST ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line 1999-09-27
[Table view] |
Text
N. ..
, 7, . , 10 CfR 50.90
.. i PHILADELPHIA ELECTRIC COMPANY l l
NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691 ,
l tris) eso sooo j June 14, 1990 I Docket Mos. 50-352 License Nos. NPF-39 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 2055b
SUBJECT:
Limerick Generating Station. Unit 1 Technical Specifications Change Request No. 90-01-1
)
Dear Sir:
l Philadelphia Electric Company (PECo) hereby submits Technical Specifications Change Request (TSCR) No. 90-01-1, in accordance with 10 CFR 50.90, requesting an amendment to the Technical Specifications (TS) (Appendix A).of Operating License No.
NPF-39. Information supporting this Change Request is contained in Attachment 1 to this letter, and the proposed replacement pages are contained in Attachment 2.
This submittal requests changes to TS Section 3.6.3, " Primary Containment Isolation Valves " to replace the approximately thirteen hundred (1300) individual Hydraulic Control Unit (HCU) isolation boundaries with four newly installed isolation boundaries on the common Control Rod Drive (CRD) headers.
If you have any questions regarding this matter, please contact us.
)
1 Sincerely yours, G.A.Ijnger,Jr.An a? h ya, .
Manager l Licensing Section i Nuclear Engineering and Services )
9006st'0541 900614 1
{DR ADOCK0500gg2 l
Attachments l
cc: T. T. Martin, Administrator, Region I, USNRC 0'0 T. J. Kenn.v. USNRC Senior Resident Inspector, LGS T. M. Gerusky, Director, PA Bureau of Radiation Protection I'g{ I
<x__ __ _ _ _ ____ _ _ _______. _ - . _ - . --- -
~
TECHNICAL SPECIFICATION CHANGE REQUEST NO. 90-01-1
. CbpMONWEALTH OF PEMNSYLVANIA :
- ss.
COUNTY OF CHESTER :
D. R. Helwig, being first duly sworn, deposes and says:
l l
That he is Vice President of Philadelphia Electric Company; the Applicant herein; that he has read the foregoing Application for Amendment of Fr.cility Operating Licenses to incorporate the newly installed isolation valves on each common Control Rod Drive header and to eliminate the existing Hydraulic Control Unit isolation valves, and knows the contents thereof; and the statements and matters set forth therein are true and correct to the best of his i knowledge, information and belief.
O D Dd p i ,
Vish President Subscribed and sworn to beforemethisWIay of o 1990.
&n u d 7)%h, 1
l Notary Public 7 '
l l
NOTARIAL SEAL l CATHERINE A. MENDEZ. tJe:ay Pubhe l
Trec@in Two Chester County My Commission Eupres Sect. 4.1993 1 l
1 ... . .
i
- e. .- ,
, 1
=
j ATTACHMENT 1 .
LIMERICK GENERATING STATION :
Unit 1 P
l i Docket No. 50-352 License No. NPF-39 i
l TECHNICAL SPECIFICATIONS CHANGE REQUEST No. 90-01-1
" Proposed Changes to the Technical Specifications to ReplacetheHydraulicControlUnit(HCU)IsolationBoundaries" Supporting Infomation for Changes - 5 pages l
l
-m-*-' - -, o. ae m,s.m,8 . m m-r .,-,m p *-<+me'w ap
Docket Nos. 50-352
,- License N::s. NPF-39 Philadelphia Electric Company, Licensee under facility Operating License No. NPf-39 for Limerick Generating Statiot (LGS), Unit 1 hereby requests that the Technical Specifications (15) contained in Apl.cndix A to the Operating License be amended as proposed herein to reflect newly installed isolation valves on each cosmon Control Rod
, Drive (CRD) header and to eliminate the existing individual Hydraulic Control Unit (HCU) isolation boundaries from TS. The proposed changes to the TS are indicated by the vertical bars in the margin of the TS pages 3/4 6-23 and 3/4 6-41. TS page 3/4 6-
'I 43 is included for information. All TS pages are contained in Attachment 2.
We request the changes proposed herein to be effective by September 30, 1990 to facilitate incorporation and use prior to the scheduled containment integrated leak rate test during the upcoming refueling outage scheduled to begin September 8, 1990.
This change request provides a discussion and description of the proposed TS changes, a safety assessment of the proposed TS changes, information supporting a l
finding of No Significant Hazards Consideration, and information supporting an Environmental Assessment.
Discussion and Description of the Proposed Changes TheIntegratedleakRateTest(ILRT)isapressurizationofprimarycontainment and measurement of total leakage from all isolation boundaries. This test by its
, nature is a critical path task during a Refueling outage. The current method of i i testing the isolation boundaries of the CRD system is to collect leakage through the .
- HCus at the vent valves on each of four supply headers during an ILRT. If the total leakage exceeds specified limits, approximately 1300 individual check valves or t
- solenoid valves must be examined to find and repair leak paths. The process of identifyingtheleakingvalves(s)cantakemanydaysofcriticalpathoutagetime.
To minimize critical path outage time, new check valves will be installed in the l CRD supply headers in four locations, effectively extending the isolation boundary from the HCUs to these new valves (See figure 1). These four (4) new valves will reduce the number of testable CR0 penetrations from approximately 1300 to four.
Although a TS change is not required prior to installation of the new valves, a TS change is required to take credit for these new isolation boundaries, and also to remove the current valves numbers for the HCU boundaries from TS. Therefore, we propose that TS Table 3.6.3-1, "Part A-Primary Containment Isolation Valves," be revised to remove the existing HCU isolation boundary valves and replace them with the newly installed isolation boundary valves. Note 12 of that table should also be revised as shown in Attachment 2 to reflect the addition cf the new valves. Also, >
since the affected CRD lines are water filled and would remain water filled for a minimum of thirty days after a loss of Coolant Accident (LOCA), Note 22 applies to l these isolation valves.
l l
l l
2-w -, _ . - , .y g_ w -- , , 7, , , , , . . . - - - _ _ y.._,.,
.' Docket N:s, 50-352 Lic;nse Nos. NPf-39 1
Safety Assessment The current primary containment isolation design for the CRD insert and withdraw lines does not conform to 10 CFR 50 Appendix A General Design Criterion (GDC) 55,
" Reactor coolant pressure boundary penetrating containment," because of the system's 3 uniqueness of design, inherent safety features, and important safety function. The system was analyzed . gainst GDC 55 requirements on a generic basis by General Electric and found acceptable by the NRC as cited in NUREG-0803 " Generic Safety Evaluation Report Regarding Integrity of BWR Scram System Piping." The existing isolation provisions for the CR0 insert and withdraw lines at LGS Units 1 and 2 were found acceptable by the NRC as documented in LGS Safety Evaluation Report (SER) (NUREG-0991)
Section 6.2.4.1. The present method of leakage monitoring was accepted by the NRC in SER Section 6.2.6.3.
The new design does not change the design criteria described above but enhances our ability to demonstrate the leak integrity of the existing analyzed design configuration. The testing of the new valves uses techniques and criteria accepted for othersimilarapplicationsasdocumentedintheLGSfinalSafetyAnalysisReport(fSAR)
Table 6.2-25. " Containment Penetrations - Compliance with 10 CFR, Part 50, Appendix J "
Note 14.
The proposed TS change will take credit for the new check valves instal 12d in each of the CR0 headers to the HCUs (drive, cooling, charging, exhaust) between the main control station and the vent valve. These valves constitute a new isolation boundary.
Each check valve station consists of two check valves, a block valve and two test i connections. This enables each check valve to be tested individually instead of during i the critical path ILRT. Each check valve station is accessible from an existing platfers near the existing vent valves.
An analysis has been performed on the piping being upgraded for inclusion in the extended ILRT boundary. The piping and related pipe supports are designed to meet the criteria of Seismic Category I and ASME Code Section 111 Class 2 or 3 as appropriate.
Analysis has shown that the existing piping and the modified piping is within the ASME Code allowables. Piping supports have been evaluated and modified as necessary to accommodate the aewly analyzed loads.
Mechanical environmental qualification of the check valves has been evaluated and confirmed to be acceptable. Dynamic qualification of each check valves and its mounting has been evaluated and confirmed to be acceptable. The valves that will be used for this modification have been used extensively at LGS in stellar applications.
' The hydraulic effect of the new valves has been evaluated. The most critical and limiting case is the cooling water header required to supply 50-60 gpm to the CRDs during normal operation. The exhaust header performs a pressure control function and normally has no flow. The pressure control function does not have a critical time i component so flow resistance is not an issue. The drive water header has flow only l during rod movement and then only four gpe. The charging header supplies pressure to j the scram accumulators. The only operation requiring significant flow is during post j scram or initial charging when time is not a critical parameter. )
l l 1
Docket Nos. 50-352 >
)
.- .- Lic:nse Nos. NPf-39 ,
. i i ,
At a cooling water flow rate of 55 gpe, the pressure drop through the check valves
! will be one psi cach and through the manual isolation globe valve 0.9 psi. The total for the valve station will be approximately 2.9 psi. i At the normal drive water flow rate of four gpe, the total pressure drop for the valve station will be approximately 0.8 psi.
In order to compare the calculated pressure drop with the available system pressure, data was obtained from the plant. On December 6, 1989, the following system performance was measured. ;
Process Water Temperature 1300F CR0 Pump Suction Pressure 17 psi CR0 Pump Discharge Pressure 1420 psi System Flow 55 gpa Recirculation Pumps Seal Purge flow 5.3 gpa CRD Pump Minimus Flow 25 gpm i
from this data, the CRD pump Total Dynamic Head (IDH) is calculated to be 1,424 psi and the total flow rate to be 85 gpa, resulting in performance somewhat below the pump curve but still above the required design point.
The scram function of the CRD system involves the scram valves and the accumulators both of which are part of the HCUs. The supply headers provide cooling water, drive and exhaust water for normal operation, and charging water for post scram recovery, but play no part in the scram function. The additional line loss due to the ;
newly installed valves is less than three psi in the cooling header and less than one psi for the drive header. The available margin of CRD pump capacity is approximately 30 psi. Therefore, the additional line loss associated with the installation of the i new valves will have no adverse effect on system performance.
Therefore, since the new isolation boundaries will continue to meet all design requirements, incorporation of these valves into the TS will not adversely affect safety.
Information Supporting a Finding of No Significant Hazards Consideration de have concluded that the proposed changes to the LGS Unit 1 TS which reduce the number of isolation boundaries by changing the isolation boundary specified in TS from the HCL' to newly install isolation valves on each cosmon CR0 header, do not constitute a significant hazards consideration. In support of this determination, an evaluation of each of the three (3) standards set forth in 10 CFR 50.92 is provided below.
- 1) The proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
The piping to be included within the new isolation boundary complies with the same standards and specifications as the original boundary. The number of active components making up the boundary will be reduced from approximately 1300 to four.
__ . _. _~ __ _ _. __ . _ _ _ _ _ _ . _ _ _ . . _ _ . _
Docket N:s. 50-352 '
. ,- Lic:nse Nos. NPF-39 Therefore, there will be no increase in the probability that the isolation boundary will be breached.
The current CRD isolatiots boundary includes the insert and withdraw lines, the scram discharge volume arid the HCUs. The relocation of the boundary will add somie of the supply header piping but will not affect the existing equipment. The added piping is small diameter (2" or less) comparable to the previously analyzed scran, discharge drain line. Tte consequences of a pipe failure inside the isolatich ,
boundary remain within the envelope analyzed in NUREG 0803.
Therefore, the proposed changes do not involve an increase in the probability or consequences of an accident previously evaluated.
- 2) The proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed TS changes are intended to take credit for the newly installed isolation valves on the CR0 common headers. These valves and associated piping '
are designed and installed in compliance with all applicable criteria. In addition, they will meet all performance requirements currently existing for the approximately 1300 HCU isolation boundaries. In effect, the only change will be to reduce the testable penetrations from 1300 to four. The proposed TS changes merely substitutes one isolation boundary for another and therefore cannot create a new or different kind of accident from any previously evaluated.
(3) The proposed changes do not in"olve a significant reduction in a margin of safety.
As discussed in items 1 and 2 above, the newly installed valves and associated piping meet all applicable' design requirements. In addition, the consequences of l
a pipe failure inside the isolation boundary remain within the envelope analyzed 1 in NUREG 0803. The valves will be tested to ensure compliance with existing perfomance requirements for isolation boundaries. Further, the performance of -
the CRD system is well within the system capability for nomal operation, and control rod scram perfomance is unaffected. Therefore, the proposed changes do not involve a reduction in a margin of safety.
)
1 Information Supporting an Environmental Assessment An environmental assessment is not required for the changes proposed by this Change Request because the requested changes conform to the criteria for " actions eligible for categorical exclusion" as specified in 10 CFR 51.22(c)(9). The requested j changes will have no impact on the environment. The proposed changes do not involve a significant hazards consideration as discussed in the preceding section. The proposed changes do not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite. In addition, the proposed changes do not involve a significant increase in individual or cumulative occupational radiation exposure.
i Docket Nos. 50-352 I Lic:nse Nos. NPF-39 l
l Conclusion l The Plant Operations Review Cosmiittee and the Nuclear Review Board have reviewed 1 these proposed changes to the TS and have concluded that they do not involve an unreviewed safety question, or a significant hhzards consideration, and will not endanger the health and safety of the public.
l
{
.l t
I
. . b 1
q2
, i sg c>
c<e e<
ww w w +x 14 s i
h L.~
n-V =
r w e
I e s .m --
i
.34
~
W (2 9 .
5
- 4Is t
y W g e ~
h O4 Je 0 O 5 * ..
t )
M i f ae &
e 4 V
g
- 3. - O t
' W d d h.
{8 x
c
84 -
~
a N Y p 1 L
_.x s-
)~
1 L -
)g >.
'I w4O 7
. . - - - -