ML20043G933

From kanterella
Jump to navigation Jump to search
Forwards Rev 13 to Operating QA Manual.
ML20043G933
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/04/1990
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043G934 List:
References
ULNRC-2220, NUDOCS 9006210332
Download: ML20043G933 (4)


Text

- - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ __

o .. .

CU%My Piont ll NXi (l'lG $kh $50 '

j Mton. thssam EL2H

[

June 4, 1990 Eutenac P3

-U.S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, D.C. 20555 ULNRC-2220 Gentlement DOCKET NO. 50-483 CALLAWAY PLANT OPERATING QUALITY ASSURANCE MANUAL, REVISION 13;

Reference:

1) ULNRC-2014, Dated June 9, 1989 Furnished herewith for your review and approval is a copy of updated pages which constitute Revision 13 of the callaway Plant Operating. Quality Assurance Manual (OQAM). Pursuant to the requirements of 10CFR50.54(a) and 10CFR50.71(e) (3) (i) , the OQAM has been revised to incorporate changes to the Operating Quality Assurance Program (OOAP) description made since the last docketed revision' transmitted by Reference 1.

In addition to the OQAM, Revision 13 updated pages, please find enclosed one copy each of the following:

^1. -OQAM (Revision 13) mark-up, identifying changes through the use of inserts and strikeovers.

2. Explanations and justifications for changes to the OQAM.

4 The changes have been evaluated by Union Electric and, with one

-exception, are not considered reductions in the OQAM commitments previously accepted by the NRC. The exception (identified as item 9 of Attachment 3) is considered a justified lessening of OOAM commitments which requires NRC approval prior to implemerc tation. The revised OQAM continues to satisfy the requiremento of.10CFR50, Appendix D.

i 9006210332 900604 fi hgh' PDR ADOCK 05000403 !

P PNV L 1 i

l

-. 4- . -

ULNRC-3220 Page 2 June 4, 1990 If you have any questions, please contact us.

Very truly yours, s

pra.--

l -

Donald F. Schnell RCS/ pas Attachments:

1) OQAM (Revision 13) updated pages
2) 00AM (Revision 13) identification of changes
3) Explanations of and justifications for proposed-changes to the 00AM 4

STATE OF MISSOURI )

) SS CITY OF ST. LOUIS )

, Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing docu-ment and knows the content thereof that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of this knowledge, information, and belief.

By Dontild F. Schttell Senior Vice President-Nuclear SUBSCRIBED and sworn to before me this 5 day of j/ p , 1990.

O kett .,, w t./

DEDORAH L CLARK NOTARY PUBLIC. STATE oF MIS 9CHJRi ST. LOulS COUNTY WY COMM:SSON EXPlFES APR 14,1966

1.. e l

ULNRC-2220 Page 3 June 4, 1990 cc A. Bert Davis Regional Administrats U.S. Nuclear Regulatt.af Commission Region'III 799 Roosevelt Road Glen Ellyn, IL 60137 R. L. Hague Chief, Project Section 3C U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 A. T. Gody, Jr. (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, D.C. 20555 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 B. L. Bartlett /C. H. Brown Resident NRC Inspectors, Callaway Plant Callaway Resident Office U.S. Nuclear Regulatory Commission RR#1 Steedman, MO 65077 Shaw, Pittman, Potts, and Trowbridge w/o 2300 N. Street, NW Washington, DC 20037 i

.. _ _. _ _ __ _