Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196G9681999-06-22022 June 1999 Informs NRC That BC Ryan Will Be Leaving Ks State Univ for Position with Wolf Creek Nuclear Operating Corp,Effective 990701 05000482/LER-1999-007, Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl1999-06-18018 June 1999 Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl ML20196A0251999-06-17017 June 1999 Requests That Written Exams for Reactor Operator & SRO for Plant Be Administered Beginning Wk of 990719 & Followed by Operating Exam During Wk of 990726 to Personnel Listed in Attachment.Proprietary Info Encl.Proprietary Info Withheld ML20195K0641999-06-15015 June 1999 Forwards MOR for May 1999 for Wolf Creek Generating Station & Corrected Page 2 of 2 of Apr 1999 Mor,Adding That Unit Entered Intomode 5 for Restart During Month of Apr & Correcting Shutdown Duration Hours from 672 to 671 ML20195G4391999-06-11011 June 1999 Provides Details for Missed Rept Re 10CFR50.46 Thirty Day Rept of ECCS Model Revs.Attachment I Provides Summary of Commitments Made in Submittal 05000482/LER-1999-005, Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl1999-06-11011 June 1999 Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl 05000482/LER-1997-027, Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util1999-06-0404 June 1999 Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util ML20195B9811999-05-26026 May 1999 Forwards 1998 Annual Repts for Ks Electric Power Cooperative Inc,Ks City Power & Light Co & Western Resources,Inc, Including Wholly Owned Subsidiary Kg&E Co ML20196L3361999-05-18018 May 1999 Forwards Rev 1 to Cycle 11 COLR for WCGS, IAW TS Section 6.9.1.9 05000482/LER-1999-004, Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER1999-05-12012 May 1999 Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER ML20206Q8141999-05-11011 May 1999 Requests NRC Work with Industry to Resolve Generic Changes to Allow Permanent Change to TSs Prior to June 2000.Encl Provides TS Limited Duration Action Statement Until 990930 05000482/LER-1999-003, Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl1999-05-10010 May 1999 Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl ML20206K5141999-05-0707 May 1999 Provides Info Re Number of Tubes Plugged in Each Sg,As Required by TS 4.4.5.5.ISI of SGs B & C Completed on 990424,resulting in Mechanical Plugging of One Tube in SG B & Five Tubes in SG C ML20206J0711999-05-0505 May 1999 Forwards Guarantees of Payment of Deferred Premiums for Owners of Wolf Creek Generating Station,As Required by 10CFR140.21 ML20206D9551999-04-29029 April 1999 Forwards 1999 Annual Radioactive Effluent Release Rept 22, for Reporting Period Jan-Dec 1998,per Section 6.9.1.7 of WCGS Ts.Attachment to Ltr Identifies Commitments Resulting from Correspondence ML20206C7321999-04-22022 April 1999 Provides Notification of Changes at WCGS Affecting Plant Physical Security Plan,Per 10CFR50.54(p).Changes Identified in Attachment I Will Be Incorporated Into Plan by 990831. Commitments Made by Util Are Included in Attachment II ML20206B2051999-04-20020 April 1999 Forwards Revs to RERP Implementing Procedures,Including Rev 1 to EPP 06-001, CR Operations, Rev 1 to EPP 06-002, TSC Operations, Rev 3 to EPP 06-004, Public Info Organization & Rev 1 to EPP 06-005, Emergency.. ML20205L7431999-04-0606 April 1999 Confirms 990401 Telcon with NRC Re Late Payment Notice That Util Received for Invoice RL0295-99.Licensee Understands Invoice to Be Cancelled ML20205F1601999-03-30030 March 1999 Forwards Rept Re Status of Decommissioning Funding for WCGS, Per 10CFR50.75.Kansas Gas & Electric Co Decommissioning Trust Agreement,Encl ML20205K9481999-03-26026 March 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-482/98-05.Corrective Actions:Training Was Provided to Mrep Members Through Use of Contract Individual Experienced in Maint Rule Programs.Change to Commitment Date,Encl ML20196K7261999-03-26026 March 1999 Forwards Certified Copy of ITS & ITS Bases,As Committed in Licensee to Nrc.Summary of Editorial Corrections, Also Encl ML20205A1961999-03-25025 March 1999 Provides Suppl 2 to 970515 Application for Amend to License NPF-42,providing Changes to TS Based on 990310 & 19 Discussions with NRC Re Conversion to Improved TS 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A6951990-09-18018 September 1990 Requests one-time Waiver to Alter Licensed Operator Requalification Training Program Cycle to Be Better Aligned W/Natl Exam Schedule ML20059E6151990-08-29029 August 1990 Forwards Semiannual fitness-for-duty Program Performance Data Rept for Jan-June 1990,per 10CFR26.71(d) ML20059E9611990-08-28028 August 1990 Reaffirms Commitment to Safe & Responsible Operation of Facility in Face of Tender Offer for Util Stock.Accepts W/O Qualification,Responsibility for Continued Safe & Reliable Operation of Plant ML20059D5281990-08-27027 August 1990 Provides Correct Ltr Number for Jul 1990 Monthly Operating Rept.Correct Ltr Number Should Be No 90-0226 ML20059C1781990-08-21021 August 1990 Forwards Proprietary TR-90-0025 W01, Core Thermal-Hydraulic Analysis Methodology for Wolf Creek Generating Station, for Review & Approval by 920101.Rept Withheld (Ref 10CFR2.790) ML20059B3691990-08-21021 August 1990 Forwards Proprietary TR-90-0024 W01, Wolf Creek Nuclear Operating Corp Rod Exchange Methodology for Startup Physics Testing, Per Discussion at 890518 Meeting.Rept Withheld (Ref 10CFR2.790) ML20058P1001990-08-10010 August 1990 Forwards Wolf Creek Generating Station Inservice Insp Rept, for Fourth Refueling Outage,Period 2,Interval 1. Nonconforming Conditions Requiring Repair/Replacement of Supports Identified During Routine Maint Activities ML20058N1421990-08-0909 August 1990 Responds to Insp Rept 50-482/90-08 Re Effectiveness of Techniques Used to Detect Erosion/Corrosion Degradation. Existing erosion-corrosion Program Effective in Identifying Wall as Nonrelevant Volumetric Anomalies ML20058L2011990-08-0101 August 1990 Forwards Inadvertently Omitted Index of Proposed Tech Spec from Re RCS ML20055J0641990-07-26026 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-482/90-24.Corrective Action:All Dose Personnel Receiving Retraining within Normal 7-wk Training Cycle Which Began on 900723 & Emergency Procedure EPP 01-7.3 Will Be Revised ML20055H2091990-07-23023 July 1990 Informs That Util Has Commenced Cash Tender Offer to Purchase Outstanding Shares of Each Class of Common & Preferred Stock of Kansas Gas & Electric Co.Util Convinced That Proposed Merger Will Have No Effect on Plant Operation ML20055G8331990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20055F6671990-07-13013 July 1990 Forwards Monthly Operating Rept for June 1990 for Wolf Creek Generating Station & Corrected Pages 1,4 & 5 to May 1990 Rept ML20055D9941990-07-0505 July 1990 Forwards Addl Info Re Seismic Design Considerations for Certain safety-related Vertical Steel Tanks,Per 890525 Request ML20055D5011990-07-0202 July 1990 Forwards Change in Status of Licensed Operators Since Transmitted,Per 10CFR50.74 ML20055D0481990-06-29029 June 1990 Responds to NRC Re Violations Noted in Insp Rept 50-482/90-17.Corrective Actions:Procedure Adm 03-600 Revised on 900430,to Ensure That Respirator User Issued Model & Size for Which Fit Tested & Trained ML20055D2111990-06-29029 June 1990 Responds to Request for Addl Info Re Violations Noted in Insp Rept 50-482/90-05.Corrective Actions:Change Made to Adm 02-005, Reactor Operators Qualifications & Responsibilities ML20058K4011990-06-28028 June 1990 Forwards Emergency Preparedness 1990 Field Exercise Scenario for Exercise Scheduled for 900829 ML20043H2851990-06-18018 June 1990 Forwards Revised LERs 85-058-01 & 90-002-00,adding Rept Dates Inadvertently Omitted from Original Submittals ML20043G7691990-06-13013 June 1990 Responds to NRC 900514 Ltr Re Violations Noted in Insp Rept 50-482/90-16.Corrective Actions:Movement of Spent Pool Bridge Toward Location FF06 Halted & Bridge Crane Returned to Location DD02 ML20043F4051990-06-11011 June 1990 Forwards Monthly Operating Rept for May 1990 & Corrected Page 2 for Apr 1990 ML20043E8211990-06-0808 June 1990 Informs of Plant Radiological Emergency Preparedness Exercise for 1990 Scheduled for 900829.Schedule Discussed W/Personnel from Region IV Emergency Preparedness,Fema,State of Ks & Coffey County ML20043E7491990-06-0808 June 1990 Forwards Rev to Figure 3.4-2 to 880620 Application for Amend Revising Tech Specs 3/4.4.9.1 & 3/4.4.9.3.Rev Corrects Editorial Error ML20043E8721990-06-0505 June 1990 Notifies NRC of Changes in Status of Operator Licenses ML20043D3271990-05-31031 May 1990 Forwards Rev 17 to Physical Security Plan,Safeguards Contingency Plan & Security Training & Qualification Plan. Rev Withheld (Ref 10CFR73.21) ML20058K1911990-05-30030 May 1990 Forwards Radiological Emergency Preparedness Exercise Objectives for 1990 ML20043B4791990-05-24024 May 1990 Documents Administrative Error in Rev to Radiological Emergency Response Plan Submitted on 900116 ML20043B4361990-05-22022 May 1990 Responds to Request for Addl Info Re Proposed Revs to Tech Specs 3/4.4.9.1 & 3/4.4.9.3 Re Pressure/Temp Limits for RCS & Overpressure Protection Sys ML20042E8691990-04-30030 April 1990 Forwards Documentation of Util Ability to Make Payment of Deferred Premiums ML20042E3021990-04-13013 April 1990 Forwards Supplemental Response to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-482/90-05.Corrective Actions:Air Check Valves to Main Steam & Feedwater Isolation Valves Added to Preventive Maint Program ML20012D9911990-03-22022 March 1990 Responds to NRC 900220 Ltr Re Violations Noted in Insp Rept 50-482/90-02.Corrective Actions:Procedure CNT-660, Rigging Revised to Incorporate safety-related Manway Covers Which May Be Removed W/O Addl Safety Evaluation ML20012C9841990-03-19019 March 1990 Provides Util Response to Generic Ltr 89-19 Re Request for Action on Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Mods Made to ESFAS Logic Design ML20012C6841990-03-15015 March 1990 Responds to NRC 900213 Ltr Re Violations Noted in Insp Rept 50-482/89-26.Corrective actions:10CFR73.71,App G Reviewed to Determine If Any Reporting Requirements Not Properly Reflected in Security & Operations Procedures ML20012A1601990-02-23023 February 1990 Forwards Semiannual Radioactive Effluent Release Rept 10 for Jul-Dec 1989 & Rev 5 to ODCM for Wolf Creek Generating Station. ML20012A5631990-02-23023 February 1990 Forwards Total Pump Study & Revises Info Previously Provided on Safety Injection Pumps & Centrifugal Charging Pumps in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. ML20006F7151990-02-21021 February 1990 Provides Present Levels of Onsite Property Damage Insurance Being Maintained,Per 10CFR50.54(w)(2) ML20012B0781990-02-14014 February 1990 Forwards Cycle 5 Radial Peaking Factor Limit Rept,Per Tech Spec Section 6.9.1.9 ML20006D6541990-02-0808 February 1990 Forwards Amend to Physical Security Plan.Proposed Change Will Require Submittal of Fingerprint Cards to NRC in Lieu of Currently Required Criminal Records Check.Proposed Changes & Safety Evaluation Withheld ML20006E3551990-02-0707 February 1990 Responds to NRC 900103 Ltr Re Violations Noted in Insp Rept 50-482/89-30.Corrective Actions:Communications Flow Process Between Facilities & Locations of Operations Status Boards Will Be Reviewed to Identify Needed Improvements ML20006E1871990-02-0707 February 1990 Advises That Bt Kckinney,Senior Reactor Operator,No Longer Employed at Util ML20011E1041990-01-30030 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Util Developed Plan & Schedule to Accomplish Reviews,Evaluations & Insps Recommended in Part IV ML19354E8831990-01-23023 January 1990 Forwards Response to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. ML20005G7791990-01-16016 January 1990 Forwards Monthly Operating Rept for Dec 1989 for Wolf Creek & Revised Operating Data Repts for Feb-Nov 1989,reflecting Thermal Generation Using New Calorimetric Procedure That Uses Main Steam Flow Instead of Feedwater Flow ML20006A0051990-01-16016 January 1990 Forwards Rev 25 to Facility Radiological Emergency Response Plan & Revs to Radiological Emergency Response Plan Implementing Procedures.Procedures Effective 891220 ML20005H1801990-01-15015 January 1990 Forwards Amend 4 to Indemnity Agreement B-99 ML20005E8591990-01-0404 January 1990 Certifies That Util Implemented fitness-for-duty Program That Meets Requirements of 10CFR26 ML20005E1921989-12-26026 December 1989 Affirms That Util Will Meet Schedule Requirements of Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. ML20011D4801989-12-20020 December 1989 Responds to NRC 891120 Ltr Re Violations Noted in Insp Rept 50-482/89-27.Corrective Actions:Personnel Completed Detailed Review of Tech Spec Surveillance Requirements to Ensure That Each Item Properly Addressed in Surveillance Procedures ML19332F8731989-12-14014 December 1989 Requests Authorization to Use ASME Section XI Code Case N-401-1, Eddy Current Exam,Section Xi,Div 1, Per 10CFR50.55a(a)(3),since Case Not Currently Listed in Reg Guide 1.147,Rev 7 as Endorsed by NRC ML19332F9131989-12-14014 December 1989 Notifies That DM Brown No Longer Employed at Facility as Senior Reactor Operator,Per 10CFR50.74 1990-09-18
[Table view] |
Text
,- .
s ..
I
~
W44.F CREEK NUCLEAR OPERATING CORPORATION John A. Bailey Vee Proceent Nucteer operstkme April 13, 1990 NO 90-0120
-1 i
U. S. Nuclear Regulatory Conunission j ATTN: Document Control Desk i Hail Station P1-137 Washington, D. C. 20555
Reference:
Letter dated March 16, 1990 frnm S. J. Collins, NRC, to B. D. Withers, WCNOC ;
Subject:
Docket No. 50-482: Response to Violation 482/9005-01, ;
02 and 03-Gentlemen:
Attached is Wolf Creek Nuclear Operating Corporation's (WCNOC) response to i violation 482/9005-01, 02 and 03 which were documented in the Reference. -l Violation 482/9005-01 involved inadequate corrective action, violation 482/9005-02 involved an inoperable auxiliary feedwater pump and violation. ]j 482/9005-03 involved a failure to follow procedure.
~
l If you have any questions concerning this matter, please contact me or Mr.
H. K. Chernoff of my etaff. ;
1 Very truly yours, j
~
y ; .-
John A.-Bailey Vice President I ,
Nuclear Operatione l I
JAB /jra '
Attachment I i
cc: R. D. Martin (NRC), w/a D. Persinko (NRC), v/a-D. V. Pickett (NRC), w/a-M. E. Skow (NRC), w/a l I
i 9004200578 900413 PDR ADOCK 05000482 2:
O PNV
~
RO. Box 411/ Burhngton, KS 66839 / Phone: (316) 364 8831 An Equal opportunity Employer MFhtC/ VET '
Att:chment to NO 90 0120 Page 1 of 4 Violation 482/9005-01: Inadecuate Corrective Action Criterion XVI of 10 CFR, Part 50, Appendix B, corrective actions, requires, in part, that measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition.
On December 15, 1988, the licensee was issued Notice of Violation 482/8827-04, for failure to test certain safety-related check valves. On January 16, 1989, the licensee responded, stating that the check valves would by included in a testing program, and that by December 29, 1989, a review to identify similar components would be completed.
Contrary to the above, during the month of February J990, while- reviewing-the licensee's corrective action for Violation 482/8827-04, the inspector identified: (1) that even though the check valves were added to the test program, four of them were not going to receive a tests and (2) there were-other similar components that should have been added to the testing program (e.g., sir check valves to the main steam and main feedwater isolation valves) that the licensee. failed to identify.
Reason For Violation
. The corrective action associated with violation 482/8827-04 included the ,
, incorporation of 16 nitrogen supply and instrument air system supply check
, valves into the Inservice Testing (IST) Program. The IST Program was revised on May 5, 1989. At that time it was determined that the four nitrogen supply check valves were passive which resulted in no testing being required for these valves.
. Additional corrective action for violation 482/8827-04 included a review of similar components in other systems to ensure that appropriate testing
- requirements are being applied. The air check valves to the main steam and matn feedwater isolation valves were reviewed as part of the corrective action and a determination made that these valves were not required to be i tested in accordance with ASME Section XI.
1
- 1. Corrective Stoos Which Have Been Taken And Results Achieved:
A further review of the function of the turbine driven auxiliary feedwater ;
pump discharge valies identified that these valves are normally open and their safeguards fail safe position is open. The motor driven auxiliary l feedwater pump discharge valves are tLs valves that are required to mitigate
, transients. These valves automatica13 r throttle to Itnit total auxiliary feedwater flow to 320,000 lbm/hr. The motor driven auxiliary feedwater
! discharge valves are tested to fulfill this function. The closing of the turbine driven auxiliary feedwater pump discharge valves by a safety-related
~
nitrogen source is a function that WCNOC feels is prudent to verify and will revise an existing procedure to test the four nitrogen' supply check valves.
- - - - -- - . . . . .-. - ~ ..
i s i i
Attechrc;t to NO 90-0120 Page 2 of 4 l l
The air check valves to the main steam and main feedwater isolation valves i were added to the Preventative Maintenance Program in December, 1989, which requires a valve operability test be performed every refueling outage.
Sorrective Steps Which Vill Be Taken To Avoid Further Violations: !
The above corrective steps which have been taken +till avoid further !
violations and no additional corrective steps are planned. 1 1
Date Vhen Full Comnliance Will Be Achieved i The procedure to test the four nitrogen supply check valvas will be revised !
by June 15, 1990.
l Violation (482/9005-02): Inocerable Aurillary Feedwater Pumn l
Findina l Technical Specification (TS) requires that written' procedures shall be established, implemented, and maintained covering those activities ,
recommended in Appendix A of Regulatory Guide (RG) 1.33 Revision 2, l February 1978. RG 1.33 requires, in part, that there be procedures covering l the authorities and responsibilities for safe operation and shutdown.
WCGS Administrative Procedure (ADM)02-004 Revision 7 ' Supervising Operator Qualifications and Responsibilities', has been established and implemented in accordance with RG 1.33. Step 3.2 of ADM 02-004 requires that the supervising operator maintain a detailed up-to-date knowledge of the conditions and limitations in the plant operating license and TS.
Contrary to the above, on February 07, 1990, the inspectors observed the turbine speed controller for the turbine driven auxiliary feedwater pump set so low as to make the pump incapable of performing its safety function, and no licensed operator (including the supervising operator) was aware of the pump's condition.
Reason For_Yiolation:
Following a reactor trip on February 07, 1990, the Balance of Plant operator (BOP).. who is a licensed operator, throttled back on the speed controller for the turbine driven auxiliary feedwater pump after steam generator levels had returned to normal. The BOP operator initially throttled back on the auxiliary feedwater pump discharge valves, but since the reactor coolant system temperature was still decreasing, he throttled back on the speed controller to decrease steam removal from the steam generator to stabilize reactor coolant system temperature. Following the recovery from the reactor trip, the BOP operator neglected to restore the speed controller to normal. No other on-shift licensed personnel realized the speed controller had been throttled back and therefore were unaware of the pump's condition.
. - ~ . . .. -
t 4 +
Att0chment to CD 90-0120 Page 3 of 4 :
Corrective Stens Which Have Been Taken And Results Achiwyed Following notification by the NRC inspector that the speed controller for the turbine driven auxiliary feedwater pump was improperly set low, Control Room personnel set the speed controller at 3900(40 -50) RPM.
Procedure STS CR-001, ' Shift Logs For Modes 1, 2, and 3,* has been revised to verify the turbine driven auxiliary feedwater pump speed controller is i set at 3900 (+0 -50) RPH. Procedure GEN 00-005, ' Plant Shutdown From 20% ,
Minimam Load To Hot Standby,' has been revised to verify the turbine driven .
auxiliary feedwater pump speed controller is set at 3900 (+0 -50) RPM and ,
that the auxiliary feedwater pump discharge valves are in the full open >
standby position.
- Corrective Steos Which Will Be Taken To Avoid Further Vloiations:
The above corrective steps which have been taken will ~ avoid further violations and no additional corrective steps are planned. ;
Date When Full Cnmn11ar_ce Will Be Achieved:
Full compliance has been achieved. ,
i Violation (482/9005-03): Failure To Pollow Procedure. [
Findinn TS requires that written procedures shall be established, implemented, and f maintained covering those activities recommended in Appendix A of RG 1.33 Revision 2 February 1978. RG 1.33 requires, in part, that there be procedures covering performing maintenance. '.
Procedure ADH 01-057 Revision 15, ' Work Request,' Section 2.1, requires !
that work requests will be used to control work performed in plant systems. t Contrary to the above, on February 13, 1990, the inspector observed licensee i, personnel working on Load Center Supply Transformer XP022, without an authorized work request.
Reason For Violation 4
During a preventive maintenance inspection of Lond. Center Supply Transformer XPG22 in accordance with Work Request (WR) 52829 89 a winding spacer was found at the base of the transformer winding. Corrective WR 00314-90 was initiated on January 16, 1990 to remove the transformer covers and perform a more detailed inspection of the winding spacer problem. On February 13, ,
1990 a clearance order was hung including the installation of ground wires in accordance with procedure ADM 02-100, ' Clearance Order Procedure *. The electrical maintenance personnel involved in removing.the transformer covers and installing the ground wires were not aware that a work request had been -
initiated for this inspection activity which resulted in not obtaining on the work request the shift supervisors permission to start the activity.
4
k
, ,e i Attachment to NO 90-0120 Page 4 of 4 ,
Corrective Steac Which Have gg,e_n Tsken And Reeulta Achieved:
Work Request (VR) 00314-90 was located and documented permission to start work was obtained and taken to the job site. Electrical Maintenance Supervision instructed electrical maintenance personnel of the requirement r in procedure ADH 01-057, ' Work Regpest', to have the appropriate work controls at the job site when performing work or inspection activities.
Maintenance ard Modification Balletin'No. 45 was issued to Maintenance .and Modification Supervisors /L6 ads to stress further the procedural requirennents i to have in possession the authorised work r,ontrole when performing work or ;
inspection activities.
E2IIective Steos Vhich Vill Be Yaken To Avoid Further Violatiengt The above corrective' steps which have been taken will avoid further violations and no additional corrective steps are planned. ,
l Date Vben Full Comoliance Vill Be Achieved:
- l Full templiance has been achieved.
l b
i 5 i
,