ML20028H753

From kanterella
Jump to navigation Jump to search
Forwards Rev 8A to Pilgrim Nuclear Power Station Core Operating Limits Rept,Cycle 8, Per Tech Spec Section 6.9.A.4.d
ML20028H753
Person / Time
Site: Pilgrim
Issue date: 01/22/1991
From: Gina Davis
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20028H754 List:
References
BECO-91-004, BECO-91-4, NUDOCS 9101290386
Download: ML20028H753 (2)


Text

.

iY BOSTON EDISON Pilgom Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts o2360 George W. Davis sener vice President - Nuclear January 22, 1991 BECo 91 004 U.S. Nuclear Regulatory Commission Document Control Desk Hashington, D.C. 20555 License DPR-35 Docket 50-293 SUBMITTAL OF PILGRIM CORE OPERATING LIMITS REPORT. REVISION 8A Boston Edison Company hereby submits the Core Ooeratina Limits Report (COLR).

.Pavision 8A for Pilgrim Nuclear Power Station as an attachment to this letter. COLR. Revision 8A is submitted in accordance to the requirements of Pilgrim's Technical Specifications, Section 6.9. A.4.d.

COLR. Revision 8A is in effect for the remainder of Cycle 8.

G. H. av s

Attachment:

Pilarim Nuclear Power Station Core Operatina Limits Report.

Revision 8A PMK/clc/5318 cc: Regional Administrator U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station

/

9101290386 910122 ['

PDR ADOCK 05000253 U s P POR l; C)  ! O *; I

' BOSTON EDISON COMPANY U.S. Nuclear Regulatory Commission

.Page 2 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, MA 02111 Mr. R. Eaton, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14D1 U.S. Nuclear Regulatory Commission 1-White Flint North 11555 Rockville Pike Rockville, MD 20852