Forwards Const Status Rept for Jul 1983.Const for Both Units Is 84% Complete
ML20024E276
Person / Time
Site: Midland
Issue date: 07/25/1983
From: Miller D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CSC-6809, NUDOCS 8308100167
Download: ML20024E276 (5)


Text

a

Vs j

/' ]i COUSteiS ,

Donald B Mi!Ier. Je l } g. e r, p se be S.'te Akn.sger i

s Afidknd Project y i l Q Midland Project: Po Box 1963, Midland, Mi da640 + (517) 6318650

$O-309 50- m 3 o nCi tswr f Y3 July 25, 1983 g ,

3 PA0 SLO OPRP RC Mr. R. A. Hartfield 9psA Chief, Management Information Branch 6JMSF office of Management and Program Analysis ')E U. S. Nuclear Regulatory Commission Al gt

}-

Washington, D. C. 20555 MIDLAND ENERGY CENTER GWO 7020 NRC SCHEDULE File: 0652 UFI: 53*54 Serial: CSC-6809 70*01 Attached is the July 1, 1983 information for updating the status of Midland Units 1 and 2 of the NRC Yellowbook.

The construction percent is 84% complete for both Units 1 and 2.

Ap21 DBM/PFS/lrb Attachment cc: Mr. James G. Keppler', Regional Director, Region III Mr. J. J. Harrison, Midland Project Inspector, Region III Mr. Frederick C. Williams, Isham, Lincoln and Beale, Washington Mr. Phil Steptoe, Isham, Lincoln & Beale, Chicago 0) 9308100167 G30725 PDR ADOCK 05000329 \\

R PDR

C0N$TRUCTION STATUS REP 0RT PAGE N0s 2-HIDLAND i NUCLEAR POWER PLANT $ STATUS A5 0F86/30/83 C0N5iRUCTION STATUSs -

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE8 2/9/85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A$

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE: 11-08-81 DEFINED IN cps (EARLIEST) December 1 1983 APPLICAHy:S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 88-00-79 (LATEST) December l'.1984 APPLICANT'S CURRENT ESTIMATED COMMERICAL OPERATION DATES 8/9/85*

CURRENT ESTIMATED PERCEMT CONSTRUCTION COMPLETES 84%

COMMENTS REGARDING CURRENT CONSTRUCTION STATU$s c  !

i ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START _ COMPLETION COMPLETION X COMPLETI l MoaILIZE AMD PREPARE SITE 3/73 8/73 1001 PLACE STRUCTURAL CONCRETE: 8/73 ** '991+

INST ALL REACTOR PRESSURE VES;"' t 6/78 8/78 1001 INSTALL LARGE BORE PROCESS PIPES 7/76 6/84 99%

  • INSTALL L ARGE BORE PIPE HANGERS. RESTRAINTS AND SHUBBER58 12/77 6/84 921 INSTALL SMALL BORE PIPES 1/77 6/84 961 INSTALL CABLE TRAYS 4/77 **'

l 991+

, INSTALL EXPOSED METAL CONDUITS 4/77 7/84 97%

4 INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLES 11/78 7/84 93%

INSTALL ELECTRICAL TERMINATIONS: 6/78 7/84 82%

CONDUCT REACTOR COLD HYDROSTATIC TEST: 3/84 3/84 CONDUCT. HOT FUNCTIONAL TEST: 7/84 9/84 CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOADS 10182 2/85

  • Commercial Operation for both process steam and electrical
    • Concrete and Cable Tray are 991 complete with minimal remaining to be done as required. -
      • Percent complete is for large bore hangers. Restraints and anubbers are not included.

t

,C0N$TRUCTION STATUS AEPORT PAGE N0s ?-

HIDLAND 2 NUCLEAR POWER PLANTS STATUS AS 0 6/30/83 PLANT CHARACTERISTIC 58 KEY PERS0NNELe DOCKET N08 05880338 CORPORATE CONTACTS J. *J. Cook. Vice President CP No. A DATE ISSUEDs Projects. Eng & Construction CP EXPIRATION DATES graj284/ 82-14-72 7-0 CORPORATE ADDRESS 8 1945 W. Parnall Road APPLICANT 8 CONSUMERS POWER COMPANY PLANT LOCATION: Midland. MI 48640 Jackson. MI 49201 IE REGIOMs III CORPORATE PHONE N0s (587) 788-0453 AEs BECHTEL NRC LPMs D. NOOD NS$$s BASCOCK 8 WILCOX IE PRINCIPAL INSPECTORS CONSTRUCTOR: BECHTEL -CONSTRUCTION: R. J. COOK (RESIDENT INSPECTOR)

REACTOR TYPES PWR -TEST AND STARTUPs DER (MWE3 8 8 18 IE RESIDENT INSPECTOR:

INSPECTION 8 T A T U Se FUEL L0AD DATE CHANOES TIME PERIOD A5 REPORTED 8Y U T I L I T Ya REPORT NEW REASON FOR CHANGE REPORT BES DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER CE OF INSP.

11-07-74 11-80-79 CONSTRUCTION SCHEDULE STRETCHED OUT TO REDUCE CURRENT CASH OUTFLOW ANNOUNCED BY UTILITY.

Ot-f4-7S 18-08-80 CONSTRUCTION SCHEDULE STRETCHED OUT.

89-19-79 46-08-89 DEVELOPMENT OF A TWO UNIT IN.EGRATED TEST SCHEDULE.

89-80-80 87-88-83 PROJECT SCHEDULE REEVALUATION i INCORPORATING OUTSTANDING LICENSING ISSUES.

03-31-83 10-01-84 PROJECT SCHEDULE RE-EVALUATION AND i

DEVELOPMENT OF CCP PLAN LOCAL PUBLIC DOCUMENT R O O Ms

, GRACE DOW MEMORIAL LIBRARY 8780 W. ST. AHDREWS ROAD

. ,MIDLAND MICllIGAN 48640 .

C0NSTRUCTIOM STATUS REPORT PAGE N0s 2-i HIDLAND 1 NUCLEAR PGWER PLANTS STATUS A5 0F.6/30/83 PLANT CHARACTERISTICSa KEY PERSONNELa f

l DOCKET H0s 85080329 CORPORATE CONTACTS J. W. Cook.*Vice President I CP Ho. 8 DATE ISSUED: CPR-SI / 12-14-72 Projects. Eng & Construction CF EXPIRATIDH DATES 12-01-84 CORPORATE ADDRESSs 1945 W. Parnall P.oad APPLICANTS CONSUMERS POWER COMPANY PLAHi LOCATIONS Midland NI 48640 Jackson MI 49201 f IE REGIONS III CORPORATE PHONE N0s (SI7) 788-0453 i' AEs BECHTEL MRC LPMs D. HOOD H555: BABC0CK 8 WILC0X IE PRINCIPAL INSPECTORS CONSTRUCTOR 8 SECHTEL -CONSTRUCTIDHs R. J. COOK (RESIDENT INSPECTOR)

-TEST AND STARTUPs

(

REACTOR TYPES DER (MWE)s PWR (4.000.000 Lb/Hr process steam) 492 IE RESIDENT INSPECTOR 8 fi INSPECTION S T 4.T U Se FUEL L0AD DATE CHANGES g

TIME PERIOD AS REP 0RTED BY UTILITYs REPORT .NEW REASON FOR CHANGE 4 REPORT BE0 DATE ENO DATE DATE SCHE DUL E REPORTED BY UTILI1Y

' HkHg[{ OF INSP. OF INSP.

1 88-07-74 11-08-80 CONSTRUCTION SCHEDULE STPETCHOUT TO i

REDUCE CURRENT CA5H OUTFLOW.

el-14-75 11-08-81 CONSTRUCTION SCHEDULE STREICHED OUT TO REDUCE CURRENT CAST GUTFLOW.

09-88-40 12-00-83 PROJECT SCHEDULE REEVALUATION INCORPORATING OUISTAHDING LICEN53HG I ISSUES.

Y j 03-31-83 02-09-85 PROJECT SCHEDULE R7.-EVALUATION AND

'l DEVELOPMENT OF CCP PLAN i

f 4 .

j h

s

i. L0 CAL PUSLIC D0CUMENT R 0 0 Ms .

b GRACE DOW MEMORIAL LIBRARY d 1718 W. SI. ANDREWS ROAD MIDLAND MICHIGAN 48640 .

C 0 N S T'R U C T I U N 5TATUS REP 0RT PAGE N0s 2-

  • NUCLEAR POWER PLANTS STATUS AS OFs HIDLA'HD 3 6/30/a1

( ,

l 8

CONSTRUCTION S T 4 T U Ss -

l i

10/01/84' APPLICANTS CONSTRUCTION CDMPLETION ESTIMATE AS j APPLICANTS 3 CURRENT ESTIMATED FUEL LOADING DATE: DEFINED IN cps (EARLIEST) July 1, 1963 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE: 36-08-88 l 11-30-78 ILATEST) Jujy 1,1984 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE APPLICANT'S CURRENT ESTIMATED COMMERICAL OPERATION DATES 2/28/85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETES 84%

t COMMENTS REGARDING CURRENT CONSTRUCTION STATUS ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11 ART._ igGELETIDM COMPLETION 4 COMPLE11 i

MOBILIZE AND PREPARE SITE 8 -

3/73- 8/73 100%

8/73

  • 99%+

PLACE STRUCTURAL CONCRETES 1 INSTALL REACTOR PRESSURE VESSELS 4/78 5/78 100%

4/76 6/84 991 INSTALL LARGE BORE PROCESS PIPE:

11/77 6/84 92%

  • '* INST ALL L ARGE BORE PIPE HANGERS. RESTRAINTS AND SMUSSERSs l 951 INSTALL SMALL SOR2 PIPES 1/77 7/84 l

4/77

  • 99%+

[ INSTALL CABLE TRAYS 4/77 6/84 9 21 j INST ALL EXPOSED METAL CONDUITS .

s 1/78 6/84 93%

INSTALL POWER. CONTROL, INSTRUMENTATION AND SECURITY CABLE:

6/78 6/84 82%

INSTALL ELECTRICAL TERMINATIONSs CONDOCT REACTOR COLD HYDROSTATIC TESTS 1/84- 1/84 f

l CONDUCT HOT FUNCTIDHAL TEST: 5/84 7/84 l

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD: 8/82 9/84 i

  • Concrete and Cable Tray are 991 complete with minimal remaining to be done as required.
    • Percent complete is for large bore hangers. Restraints and snubbers are not included.

4