r

.50 - 3a9 2 -3m Donald B Minor, Jr power

@ Consumers su u <n Company """'~*"

Midland Project: Po Box 1963, Midland, MI 44!S40 + (517) 6314660 fRINCIPAL STAFF vRA _ f, .yng ,

April 28, 1983 0/RA A/RA SC%

PA0 g'3 OPRP sto Mr. J. J. Harrison f)RMA RC l Midland Project Section D31SP  !

U. S. Nuclear Regulatory Commission DE' j Region III M_L 799 Roosevelt Road i JL , Ft LEl fg ,

Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.16 UFI: 42*05*22*04 Serial: CSC- 6686 12*32 We ha e completed our review of the following activities:

155052305 Drift for and install Bulkhead from Pier 8E north to Containment Wall.

155059025 Excavate and remove mudslab for Grillage Beams between Pier 8E and Containment.

155053025 Excavate for Support Columns next to c' tainment.

155055003 Install Steel Support Columns next to Containment.

155055010 Install and load Grillage Structure at Pier 8E.

165052305 Drift for and install Bulkhead from Pier 8W north to Containment Wall.

1 165059025 Excavate and remove mudslab for Grillage Beams between Pier 8W and Containment.

165053025 Excavate for Support Columns next to Containment.

165055003 Install Steel Support Columns next to Containment.

165055010 Install and load Grillage Structure at Pier 8W.

155052020 Excavate / lag Zone Y1.

165052020 Excavate / lag Zone Z1 8305170131 830428 OM PDRADOCK05000g A

_L2Dj

REMEDIAL SOILS WORK AUTHORIZATION April 28, 1983 Page 2 In accordance with the NRC-CPCo Work Authorization Procedure, we request your concurrance to proceed with the above work.

V DBM/GM)f/dmh [