ML20012E409

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp 90-Day Rept,Beaver Valley Power Station Unit 1,Outage 7, for 880227-891221,per Section XI of ASME Boiler & Pressure Vessel Code 1983 Edition Through Summer 1983 Addenda,Section XI
ML20012E409
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 03/16/1990
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012E410 List:
References
NUDOCS 9004050066
Download: ML20012E409 (2)


Text

.

l

,< i

.J ,\- . ,*.

3  ;

Ii ' i

{ @ g g . ,e. g e g n ro..,s ciion Shipperipport, PA 16077 4 004 l

f f i

e .

I I

?!U,$..",NU, o., " " "

)

i W  !

i March 16, 1990 l f

U. S. Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555

  • i

Reference:

Beaver Valley Power Station, Unit No. 1  ;

Docket No. 50-314, License No. DPR-64 Seventh Refueling Outage Inservice Incpection (ISI)

Report and Steam Generator Tube Inservice Inspection Results Report .,

Gentlement .{

This letter forwards the Inservice Inspection Report on ASME  :

Class. 1, 2, and 3 components examined during the seventh refueling outage at Beaver Valley, Unit No. 1. Included as Appendix VI of this ,

report is the Steam Generator Tube Inservice Inspection Results l ' Report.  :

The ASME Boiler and Pressure Vessel Code, Section XI, Article

'IWA-6230 requires that an Inservice Inspection Report be submitted to the enforcement and regulatory authority having jurisdiction at the plant site within ninety (90) days after completion of an inservice inspection. This report addresses the inspection term from February r L 27, 1988 to December 21, 1989.

These examinations are part of Interval 2, Period 1 of the Beaver L Valley Unit No. 1 ISI inspection schedule. The inservice inspections t I

were performed in accordance with section XI of the ASME Boiler and Pressure Vessel Code, 1983 edition through Summer 1983 addenda.

L The Steam Generator Tube Inservice Inspection Results Report is f being submitted in accordance with Technical Specification 4.4.5.5.  :

.; This report contains: .

1. The number and e:: tent of tubes inspected,
2. location and percent of wall-thickness penetration for each indication of an imperfection, and
3. identification of tubes plugged.

i Dk

{ 4050066 900316 i Q ADOCK 05ooo334 PDC g\\

^

??

l' ,,?. % ,

i o Beav r VallCy Pow;r St;tica, Unit N3. 1 l Docket No. 50-334, License No. D@R-66 ,

Seventh Refueling Outage Inservice Inspection (ISI) Report and j Steam Generator Tube Inservice Inspection Results Report '

Page 2 ,

l If you have any questions, please contact ne or members of my

staff. l Very truly yours,'
bD.i EcAv J. Sieber i

Vice President i Nuclear Group cc: Mr. J. Beall, Sr. Resident Inspector I Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager  !