ML20012C624

From kanterella
Jump to navigation Jump to search
Informs of Resolution of USI A-47,per Generic Ltr 89-19
ML20012C624
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/14/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-47, REF-GTECI-SY, TASK-A-47, TASK-OR GL-89-19, NUDOCS 9003220296
Download: ML20012C624 (2)


Text

-

s t: I.

gs ,

Alabama Power Company ,

40 inverness C nte Parkway -

" 1 i- '

Post Office Box 1295 ..

. Sirpinghtmr Alabama 35201.- >

Telephone 205 868-5501:

s W[G. Hairston, ill Senior Vice President -

Nuclear Operations Alabama Pbwer'. .

thesoutten electnc system March 14, 1990-Docket Nos.-50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document. Control Desk Washington, D. C. 20555

-Gentlemen:

l Joseph H. Farley Nuclear Plant l: Generic Letter 89-19 " Request For Action Related To l Resolution Of Unresolved Safety Issue A-47 ' Safety Implication p

Of Control Systems In LVR Nuclear Power Plants' Pursuant to 10CFR50.54(f)"

As a part of the technical resolution of Unresolved Safety Issue A-47,

" Safety Implications of Control Systems in LVR Nuclear Power Plants," i L Generic. Letter 89-19 requests that all pressurized water reactors provide a p Steam Generator Overfill' Protection System, including the associated technical specifications and plant procedures, which would provide for t

' periodic surveillance of the system. Enclosure 2 of the generic. letter l

!- provides the staff recommendations, which are applicable to Farley Nuclear Plant, for acceptable steam generator overfill protection for the ,

Westinghouse Group I plants. Each licensee is required'to notify the NRC by March 19, 1990 as to whether the Enclosure 2 recommendations vill be implemented.

Alabama Power Company, in conjunction with the Farley Nuclear Plant (FNP) designers, evaluated the existing FNP Steam Generator Overfill Protection System design / configuration, technical specifications, and -

associated surveillance procedures and determined that the system design, as implemented, and the technical specifications satisfy the Enclosure 2 recommendations for a Vestinghouse Group I plant with a two-out-of-three initiating logic. However, some surveillance procedure revisions were made to ensure that all facets of the overfill protection system are fully tested. Alabama Power Company plans to take no further action in response to Generic Letter 89-19.

9003220296 900314 3)

PDR ADOCK0500g6 1 P ,

00

,\0

[f 4,7  :~r; ~ .j

v. - ,
  • .. .q U- .. Nuclear Regulatory Commission

.Page 2' l

y. 1 j

The information provided herein is true to the best of my knowledge and belief. 'Should you have any-questions, please advise.

Respectfully submitted, ,

l l (Al .h * ~

Yd V. G. Hairston, III

'?

SWORN TO AND SUBSCRIBED BEFORE ME THIS / h DAY OF' -'Mf/T)/!t 1990 ,

t 4/41 t 4 twYff' / /

l- NotaryPublig j_

My Commission Expires: /,J /f 9 }

l l

VGH,III/MGEsmgd 14.14 cc Mr. S. D. Ebneter Mr.'E. A. Reeves Mr. G. F. Maxwell  :