Forwards Inservice Insp Hydrostatic Test Program for Class 2 & 3 Sys Conducted During First 10-Yr Insp Interval. Relief Requested for Second 10-yr Insp Interval for Hydrostatic Relief Requests Contained in Encl
ML20012A102
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/01/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012A103 List:
References
JPN-90-021, JPN-90-21, NUDOCS 9003080280
Download: ML20012A102 (2)


Text

~

3

}:  % >s r

(:,f  :. i 123 Main Street '

-!- 1 Whit) Plaire, fewYork 1060'. =

= 014 681.6240 e ' '

4 s O hfMMT John c.Brun -.

L & Autwrity t=nr *it"*"'

p Mmmh 1,1990 ;

g 'JPN-90-021 f

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mall Stop P1 137 -

, ' . Washington, D.C. 20555

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 '

Inservice inspection Hydrostatic Test Program Relief from System Pressure Test Requirements

Dear Sirs:

This letter transmits the results of the of the Inservice inspection Hydrostatic Test Program for Class 2 and 3 systems conducted during the first 10 year inspection interval. These tests were conducted in accordance with the ASME Boiler and Pressure Vessel Code,1974 Edition through n Summer 1975 Addenda.. The Authority requests relief for those systems and/or components for which testing in accordance with the 1974 Edition through Summer 1975 Addenda of the Code is 1i mpractical. These hydrostatic relief requests, previously discussed in verbal communications 1with the NRC, are contained in Attachment I to the Inservice Inspection Report.

. . Relief is also being requested for the second 10-year inspection interval for those hydrostatic

' relief requests contained in Attachment I which apply to the second.10-year interval. The code of

, record for the second 10-year inspection interval is the 1980 Edition through Winter 198t

Addenda.

Attachment il to the Inservice inspection Report provides the justification for deletion of the Class ll-Augmented nitrogen / air systems from the inservice inspection program. These systems

- were inadvertently included in the original scope of the inservice inspection program and have 3

. since been removed. l o i l-i I

l l  !

=

n, j

.9003080280.900301 u- DR ADOCK 050 3 /

m -

i ;,_ '

c c-

's ,

+

S_hould you or your staff have any questions regarding this matter, please contact Ms. Sofia Toth of my staff.

[..

t Very truly yours, ,

b hn C. Brons Executive Vice President

,) Nuclear Generation

.cc: .U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Resident Inspector-U.S. Nuclear Regulatory Commission P.O. Box 136 ,

Lycoming, NY 13093 Mr. David E. LaBarge

Project Directorate 11 L- - Division of Reactor Projects I/11 U.S. Nuclear Regulatory Commission Mall Stop 14 B2 g Washington, DC 20555 L

,