Submits Schedule for Installing Hardened Wetwell Vent,Per Generic Ltr 89-16.Util Intends to Perform Hardened Wetwell Vent Mods During Second Refueling Outage After 891027 for Each Unit.Mods to Unit 1 May Not Be Completed by 930101
ML20011E791
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 02/08/1990
From: Loflin L
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-16, NLS-90-034, NLS-90-34, NUDOCS 9002220480
Download: ML20011E791 (1)


Text

-

Caronna Power & Ught Company

' SERIAL: NLS 90 034 FEB 0 81990 Ih United States Nuclear Regulato Commission  !

ATTENTION: Document Control De Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PIANT, UNIT NOS.1 AND 2 l DOCKET NOS. 50 325 & 50 324/ LICENSE NOS. DPR-71 & DPR 62 INSTALLATION OF A MARDENED WETWELL VENT Centlemen:

In a letter dated January 23, 1990, the staff acknowledged receipt of-the CP&L's response to Generic Letter 89 16, Installation of a Hardened Wetwell Venr. This letter also stated that completion of the requisite vont modification for each unit by January,1993 is acceptable and requested that any changes to the completion schedule must be discussed with the staff prior to their implementation, with the final schedules not to excend beyond i January, 1993. At the request of the Brunswick Project Manager, CP&L is -

submitting this clarification of the schedule commitment for installation of hardened vents by providing the currently projected outage dates.

As committed in CP&L's October 27, 1989 response to Generic Letter 89 16, i hardened vents will be installed at Brunswick by "either January 1, 1993 or -

during the'second refueling outage from the date of this letter (October 27,  ;

1989), whichever is later." The Company intends to perform hardened vent ,

-modifications during the second refueling outage after October 27, 1989 for each unit. These outages are the Reload 8 outage for Brunswick 1, currently '

scheduled to begin February 1992, and the Reload 10 outage for Brunswick-2, ,

currently scheduled to begin October 1992. It must be recognized that outage  !

dates are subject to change and that the possibility exists that the i Brunswick 2 outage may shift to such an extent that hardened vent installation would not be completed by January 1,1993.  ;

The Company understands that the BWR Owners Group notified the staff that utilities would complete vent installation in approximately three years or two t

p refueling outages. .CP&L's commitment is consistent with the BWR Owners Group position.

Please refer any questions regarding this submittal to Mr. M. R. Oates at 6 (919) 546 6063.

Yours very truly, 9002220400 900208 PDR ADOCK 05000324'

'N '

A P PNU -con rd . Loflin Ma ager Nuclear Licensing Section LIL/ MAT cc: Mr. P,. D. Ebneter Mr. W. H. Ruland Mr. E. G. Tourigny 411 Fayetteville Street