MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20132B5771996-12-10010 December 1996 Proposed Tech Specs 3.13 Re Fire Protection Sys ML20129C4521996-10-17017 October 1996 Proposed Tech Specs,Revising Pages 89,89a & 90 to Incorporate Changes from Amends 148 & 149 ML20128N6031996-10-11011 October 1996 Proposed Tech Specs,Revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 1999-09-21
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217N3001999-10-21021 October 1999 Proposed Tech Specs,Correcting Two Textual Errors & Changing Designation of Referenced Figure ML20217K8731999-10-18018 October 1999 Proposed Tech Specs Revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 ML20212F6941999-09-21021 September 1999 Proposed Tech Specs,Increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20211J0211999-08-31031 August 1999 Proposed Tech Specs Bases Page 91,allowing Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line (Predicted) Uncorrected Solution & on-line (Measured) 3D-Monicore Exposure Corrected Solution ML20211B6781999-08-18018 August 1999 Proposed Tech Specs Revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance ML20211B7051999-08-18018 August 1999 Proposed Tech Specs Revising Reactor Core Spiral Reloading Pattern to Begin Around SRM ML20210D2481999-07-20020 July 1999 Proposed Tech Specs Revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3371999-07-20020 July 1999 Proposed Tech Specs Re Enhancements to Support Implementation of Increased Core Flow ML20209G1671999-07-12012 July 1999 Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values ML20196K2951999-06-29029 June 1999 Proposed Tech Specs Pages for Proposed Change 220,revising Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2881999-06-24024 June 1999 Proposed Tech Specs Revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20195J8691999-06-15015 June 1999 Proposed Tech Specs Increasing Stis,Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9531999-06-0909 June 1999 Proposed Tech Specs,Supplementing Proposed Change 213, Allowing Use of ASME Code Case N-560,per GL 88-01 ML20195C8841999-05-26026 May 1999 Proposed Tech Specs Clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3771999-05-0606 May 1999 Proposed Tech Specs Pages ,Eleting Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 ML20206J7231999-05-0505 May 1999 Proposed Tech Specs Pages for Proposed Change 212,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys ML20205S9431999-04-20020 April 1999 Proposed Tech Specs,Revising Reactor Core Spiral Reloading Pattern Such That It Begins Around Source Range Monitor ML20205T4721999-04-19019 April 1999 Marked-up Tech Specs Pages Re Suppl to 990201 Request for Amend to License DPR-28,revising Portions of Proposed Change 208 ML20205S4081999-04-16016 April 1999 Proposed Tech Specs Modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 ML20205S3121999-04-15015 April 1999 Proposed Tech Specs Revised Bases Pages 90,227,164 & 221a, Accounting for Change in Reload Analysis,Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20202E5451999-01-25025 January 1999 Proposed Tech Specs Re Technical Requirements Manual Content ML20206S0661999-01-22022 January 1999 Proposed TS to Change Number 189,proposing Relocation of Fire Protection Requirements from TSs to TRM ML20198D5381998-12-15015 December 1998 Proposed Tech Specs Page 142,correcting Wording to Reflect Previously Approved Wording,Last Revised in Amend 160 ML20198B7421998-12-11011 December 1998 Proposed Tech Specs Changing Wording of Primary Containment Integrity Definition to State That Manual PCIVs Which Are Required to Be Closed During Accident Conditions May Be Opened Intermittently Under ACs ML20197J4631998-12-10010 December 1998 Proposed Tech Specs Section 4.9.2,revising Info Re Calibr of Augmented Offgas Sys Hydrogen Monitors ML20197H0031998-12-0707 December 1998 Proposed Tech Specs Change 209,resolving Emergency Concern Re Potential Operation Outside of LCO Contained in Current TS & Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation ML20155F7421998-11-0303 November 1998 Proposed Tech Specs Incorporating Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G5061998-11-0202 November 1998 Proposed Tech Specs Re ECCS Actuation Instrumentation - LPCI A/B RHR Pump Start Time Delay Requirements & CS Sys A/B Pump Start Delay Requirements ML20196A7851998-10-0909 October 1998 Rev 19 to Vynp IST Program Plan ML20151U0131998-09-0404 September 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel Assemblies ML20237E9571998-08-27027 August 1998 Start-Up Test Rept Vynp Cycle 20 ML20236H4551998-06-30030 June 1998 Proposed Tech Specs Modifying Table 4.2.1 to Delete ECC Actuation Instrumentation Re Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8121998-05-0808 May 1998 Proposed Tech Specs Reducing Normal Operating Suppression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances That Add Heat to Suppression Pool ML20247E5671998-05-0808 May 1998 Proposed Tech Specs Page 270,containing Wording Inadvertently Deleted from TS Proposed Change 202 ML20217P4171998-05-0101 May 1998 Proposed Tech Specs Re Administrative Controls Section ML20217G7131998-04-23023 April 1998 Proposed Tech Specs Change 200 Revising Station SW & Alternate Cooling Sys Requirements ML20217C4591998-03-20020 March 1998 Proposed Tech Specs Re Containment Purge & Vent ML20217A1271998-03-13013 March 1998 Proposed Tech Specs Bases Section 3.10.B,updated to Require That Station Battery,Eccs Instrumentation Battery,Or Uninterruptable Power Sys Battery Be Considered Inoperable If Any One Cell Is Below Specification Cell Voltage ML20202H2611998-02-0606 February 1998 Revised TS Pages Re Change 190,w/typos Corrected ML20197E8481997-12-22022 December 1997 Replacement Pages 160 & 279 & mark-up Pages to Proposed TS Change 190 Containing Editorial Changes ML20203F0131997-12-11011 December 1997 Proposed Tech Specs Revising Current Value for SLMCPR for Cycle 20,next Operating Cycle ML20199K8501997-11-21021 November 1997 Replacement Pages 147,156,157 & mark-up Pages to Proposed TS Change 190,removing Ref to Documents Outside of TS That Define Components to Which Program Applies ML20199J7661997-11-20020 November 1997 Proposed Tech Specs Pages,Revising Requirements for Main Station Batteries ML20217H6931997-10-10010 October 1997 Proposed Tech Specs Revising & Clarifying Requirements for Offsite Power Sources ML20211A6461997-09-18018 September 1997 Proposed Tech Specs,Providing marked-up Pages for Proposed Changes 192 & 193 ML20217Q3311997-08-22022 August 1997 Proposed Tech Specs Pages 245 & 252,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys ML20217N4111997-08-20020 August 1997 Proposed Tech Specs Pages 270 & 270a,updating Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle-specific Thermal Operating Limits to COLR ML20141H1171997-07-11011 July 1997 Proposed Tech Specs,Replacing Pages 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1861997-06-0909 June 1997 Proposed Tech Specs Change 191,updating Section 6.0 Administrative Controls ML20149M7451997-01-24024 January 1997 Startup Test Rept,Vermont Yankee Cycle 19 1999-09-21
[Table view] |
Text
_-__ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ - _ _ - _
VYNPS
3.13 Limiting Conditions for Operation 4.13 Surveillance Requirements k -)/
s 4
C. Fire Hose Stations C. Fire Hose Stations 00 bd 1. Except as specified in 3.12.C.2 below, all hose 1. Each fire hose station shall be CD stations inside the Reactor Building, Turbine verified to be operable:
- G Building, and those inside the Administration CD Building which provided coverage of the Control a. At least monthly by visual IC Room Building shall be operable whenever inspection of the station to assure f
C) equipment in the areas protected by the fire hose all equipment is available.
4 stations is required to be operable.
- b. At least once each 18 months by
- 2. With one or more of the fire hose stations removing the hose for inspection
' () specified in 3. 3.C.1 above inoperable, route an and replacing degraded coupling additional equivalent capacity fire hose to the gaskets and reracking.
unprotected area (s) from an operable hose station within one hour. c. At least once each year by hydro statically testing each outside hose at 250 lbs.
i-
- d. At least once per 3 years by hydro statically testing inside hose at 150 lbs.
- c. At least once per 3 years, partially open hose station valves to verify valve operability and no blockage.
D. High Pressure CO2 System D. High Pressure CO2 System
- 1. Except as specified in Specification 3.13.D.2, 1. The CO2 system located in the cable the CO2 systems located in the cable vault, vault, switchgear room, and diesel fire switchgear room, and diesel fire pump day tank pump day tank room shall be room shall be operable, whenever equipment in the demonstrated operable.
l area protected by the system is required to be l operable. a. At least once per six months by verifyird each CO2 cylinder does
- not contain less than 90% of its initial charge.
I i
l 187-f i
1
VYNPS -
3.13 Limiting Conditions for Operation 4.13 Surveillance Requirements ,
- 2. From and after the date that the CO2 system in b. At least once per 18 months by the cable vault or the switchgear room is verifying that the system, inoperable, establieh a continuous fire watch including associated ventilation with backup fire suppression equipment. Restore dampers, will actuate automatically the system to operable status within 14 days or to a simulated actuation signal, or submit a report within the next 30 days to the a manually initiated signal.
Commission as specified in 6.7.C.2 outlining the cause of inoperability and the plans for c. At least once per operating cycle a restoring the system to operable status. flow path test shall be performed to verify flow through each nozzle. l
- 3. From and after the date that the CO2 system in the diesel fire pump day tank room is inoperable, E. Vital Fire Barrier Penetration Fire Seals a fire watch shall be established to inspect the location at least once every hour. Restore the 1. Vital fire barJier penetration fire system to operable status within 14 days or seals shall be verified to be submit a report within the next 30 days to the functional by visual inspection at Commission as specified in 6.7.C.2 outlining the least once per operating cycle and cause of inoperability and the plans for following any repair.
restoring the system to operable status.
E. Vital Fire Barrier Penetration Fire Seals
- 1. Except as specified in Specification 3.13.E.2 i
below, vital fire barrier penetration seals protecting the Reactor Building, Control Room 4.13.F Sprinkler Systems I Building and Diesel Generator Rooms shall be intact. 1. Each of the sprinkler systems specified L in Table 3.13.F.1 shall be demonstrated
- 2. From and after the date a vital fire barrier operable.
penetration fire seal is not intact, a continuous i fire watsh shall be established on ct least one a. At least once per 12 months by side of the affected peaetration within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. cycling each testable valve in the flow path through at least one 3.13.F Sprinkler Systems complete cycle of full travel.
- 1. Except as specified in Specification 3.13.F.2 below, those sprinkler systems listed in Table 3.13.F.1 shall be operable whenever equipment in the area protected by those sprinklers is operable or is required to be operable.
187 g
VYNPS ,
3.13 Limiting Conditions for Operation 4.13 Surveillance Requirements
- 2. From and after the date that one of the sprinkler b. At least once per 18 months by; systems specified in Table 3.13.F.1 is inoperable, a fire watch shall be established to 1. Cycling each valve in the flow inspect the location with the inoperable path that is not testable sprinkler system at least once every hour. during plant operation through Restore the sprinkler system to operable status at least one complete cycle of within 14 days or submit a report within the next full travel.
30 days to the Commission as specified in 6.7.C.2 outlining the cause of the malfunction and the 2. A visual inspection of the plans for restoring the system to operable status. sprinkler headers to verify their intergrity, and
- 3. A visual inspection of each nozzle's spray area to verify that the spray pattern is not obstructed.
- c. At least ont , per 3 years by performing a flow test through each open head sprinkler header and verifying each open head sprinkler nozzle is unobstructed.
3.13.G Foam Systems 4.13.G Foam Systems
- 1. Except as specified in Specification 3.13.G.2 1. The foam system specified in 3.13.G below, the Recirculation M.G. Set Foam System shall be. demonstrated operable.
shall be operable whenever the Recirculation M.G.
Sets are operating. a. At least once per 12 months by cycling each testable valve in the
- 2. From and after the date that the Recirculation flow path through at least one M.G. Set Foam System is inoperable, a fire watch complete cycle of full travel.
shall be established to inspect the location at least once every hour; and a foam nozzle with a b. At least once per 18 months by:
10 minute supply of foam shall be brought to the Reactor Building elevation containing the l Recirculation M.G. Sets.
i 187-h
VYNPS 3.13 Liniting Conditiona for operation 4.13 Surveillance Requirements
- 1. Cycling each valve in the flow '
path that is not. testable during plant operation through at least one complete cycle of full travel.
- 2. A visual inspection of the foam header to verify intergrity, and i,
- 3. A visual inspection of each '
foam nozzle area to verify that the spray pattern is not obstructed.
- c. At least once per 3 years by performing an air flow test through the foam header and verifying each foam nozzle is unobstructed.
187-1
VYNPS Table 3.13.A.1 Fire Detection Sensors Minimum No. Sensors Required to be Operable Heat Flame Smoke
_ Sensor. Location Cable Spreading Room' & Station Battery Room - -
23 1.
- 2. Switchgear Room 20 2
Diesel Generator Room (A) 3.
2
- 4. Diesel Generator. Room (B) 1
- 5. Intake Structure (Service Water) 1 1
- 6. Recire Motor Generator Set Area 3 -
8 7.a Control Room Zone 1 (Control Room Ceiling) - -
14 7.b Control Room Zone 2 (Control Room Panels) 18 25 7.c Control Room Zone 3 (Control Room Panels) 7.d Control Room Zone 4 (Control Room Panels) 10 7.e Control Roon zone 5 (Exhaust & Supply Ducts) - -
2 1
8.a Rx Bldg. Corner Rm NW 232 - -
8.b Ex Bldg. Corner Rm NW 213 (RCIC) - -
1
(
Rx Bldg. Corner Rm NE 232 - -
1 f 8.e 8.d Rx Bldg. Corner Rm NE 213 - -
1 l
Rx Bldg. Corner Rin SE 232 - -
1 l 8.e 8.f Rx Bldg. Corner Rm SE 213 - -
1 l
8.g Rx Bldg. Corner Rm SW 232 1
I ~
8
- 9. HPC1 Roon l
187-j
5 Table 3.13. A.1, cont.
Minimum No. Sensors Required to be Operable ,
Sensor Location Heat Flame Smoke 10.- Torus area 12 -
16
- 11. - Rx Bldg. Cable Penetration Area - -
7
- 12. Refuel Floor - -
13
,13. Diesel Oil Day Tank Room (A) -
1* 1*
- 14. Diesel Oil Day Tank Room (B) -
1* 1*
l-i
- 15. Turbine Loading Bay (vehicles) -
3 -
4 l
l i
- NOTE: The Diesel Day Tank Rooms require only one detector operable (1 l flame cLr,1 smoke) .
i i 187-k l
l l
l I,
i
VYNPS Table 3.13.F.1 Sprinkler Systems
- 1. Reactor Building Penetration Arca Preaction System
- 2. Diesel Generator Room A System
- 3. Diesel Generator Room B System
- 4. Turbine Loading Bay System
- 5. Diesel-driven Fire Pump System i
f 9.
1 1.
i I
I 187-1
VYNPS .
4*
Bares:
3.13/4.13 Fire Protection Systems
- On May 11,1976, Vermont Yankee received a letter from the NRC requesting that an in-depth evaluation of the existing fire protection systems be performed using Branch Technical Position (BTP) APCSB 9.5-1 as a guide. Concurrent In an effort to clarify the BTP an eith this evaluation a fire hazards analysis of the entire plant complex was . required.
Appendix A was subsequently issued to specifically address operating plants. Enclosed with this Appendix the NRC
,' requested that proposed Technical Specifications on fire protection also be submitted. The subject section 3.13/4.13 and the following specific bases are those spcifications evolving from these efforts.
A. The smoke, heat and flame detectors provide the early warning fire detection capability necessary to detect problems in vital areas of the plant. Surveillance requirements assure these sensors and their associated instruments to be operable. When the equipmant protected by the detectors in not required to be operable, specifications covering the sensors and instruments do not apply.
B,C,D, The Vital Fire Suppression Water System, CO2 systems, sprinkler systems and foam system specifications are l
. F and G. provided to meet pre established levels of system operability in the event of a fire. These systems provide the necessary protection to assure safe reactor shutdown. Periodic surveillance testing provides assurance that vital fire suppression systems are operable.
E. Vital fire barrier penetration fire seals are provided to assure that the fire resistance rating of barriers is
- not reduced by a penetration. Surveillance inspections shall be performed to insure that the integrity of these seals are maintained.
The diesel fire pump has a design consumption rate of 18 gallons of fuel per hour; therefore,150 gallons i
provides for greater thcn 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of operation. Additional fuel can be delivered in a~oout one hour and additional fuel is on site. When the equipment protected by the fire protection systems is not required to be operable, the specifications governing the fire protection system do not apply.
187 m