Ig; E,. '

n..

) 4 ' i Carolina Power & Light Company  ;

65 a g: N p- P. O. Box 10429 '

. Southport, NC 28461-0429

, , . January 30, 1990 1 t;

y ,

[; FILE: B09-13510A i i7 ' SERIAL: BSEP/90-0088 l

-Mr. S. D. Ebneter, Administrator  ;

U.S.. Nuclear Regulatory Commission i y Suite 2900 t

! 101 Marietta Street, NW

. Atlanta, GA 30323  ;

' BRUNSWICK STEAM ELECTRIC PLANT UNITS I & 2 I> DOCKET NOS ~50-324, 50-325 LICENSE NOS. DPR-62. DPR-71 INTEGRATED ACTION PLAN STATUS +

\

Dear Mr. Ebneter:

- 1 Enclosed is our monthly status report on the Brunswick Integrated Action -

' Plan.

Please give,me a call if you have any questions concerning this report.  !

Very truly yours,

[' 8/' i r., Vice President R. B. Starkey, __

Brunswick Nuclear Project 1 KMC/mcg

Enclosure cc
BSEP Resident Office  ;

Mr. J. L. Harness -

Mr. L. I. Loflin Mr. J. W. Moyer {

E t

9002260065 900130 kj DR ADOCK 05000,{ g ,

zea

gc '

.c W lc aq p.p ch .

yyg g.

j Ol N1'T WL M M1"C2:*1.RM l

Oaroam %wer a :.icht campany I i

Brunswick Nuclear Project I

January 30,1990 i

MEMORANDUM TO: Mr. R. A. Watson  ;

FROM: R. B. Starkey, Jr.

SUBJECT:

Integrated Action Plan

\

As of December 31,1989, twelve of the sixty-one I.evel 1 Action Items were complete; four of i them significantly ahead of schedule (B6, D2.1, D24, E6).

1 Three Level 1 Action Items that were originally scheduled to be completed by the end of December have been mscheduled: )

J

. D26 "Fonnalize plant work schedule adherence control." New forecast date: 02/28/90. l A procedum has been implemented to provide monthly reports on interrupted work, but  !

will be revised to provide for weekly reports.

l

. D27 " Improve tracking / disposition of temporary repairs / conditions to expedite elimination." New forecast date: 03/30/90. Activities associated with this item requim -

substantial input from other CP&L departments, which wasn't immediately available > t E5 " Analyze methods of independent assessments for performance evaluation." New ,

forecast date: 12/31/90. The scope of this action item was expanded to de'velopment of i

'~

a company wide pmgram to improve the quality of CP&L's nuclear oversight functions.

Attached are the Level 1 and Level 2 Integrated Action Plans, which are current through  :

December 31. Changes fmm last month's report are indicated by an asterisk. Also attached is ,

a graph which shows our Level 1 progress and forecast against the schedule.

1 ht ,

L' i

KMC/cj Attachment

/V /

l

!' cc: Mr. H. R. Banks Mr. J. M. Brown Mr. J. R. Holder Mr. L. I. Loflin l Ms. K. M. Core Mr. A. M. Lucas Mr. A. B. Cutter Ms. P. D. Morris l- Mr. C. R. Dietz Mr. J. W. Moyer Mr. R. E. Gurganus Mr. R. B. Richey Mr. J. L. Harness Mr. W. W. Simpson Mr. M. D. Hill Mr. M. S. Staton

  • IAPMEMo-

INTEGRATED ACTION PLAN-LEVEL I ..

SCHEDULED ii!!!!!! COMPLETE 70-~

l l PROJECTED 63-~ 60 59 $l 3

56--

c

~

46 46 47 47 45 45 41 41 42 42 42 42 o 42--

35-~ '

32  : '

' ~

28-- 26 27 3 .

24 -

. i ;

21-- 19 19 .

l

! l  :

13 12 13 M 14__ l ,

c 7

I! - ,'

~~

3 4 4 igij ll i 0 l ' I 1989 1990 or arl u ti an total f6 ac o .

I

. . . _ - __ _ . -__. _ _ . . . .. _. . _ - _. . .J

~  ? -

. , = .p

a. .r>

LBRUNSWICK' NUCLEAR PROJECTi .

, l' m.:

INTEGRATED ACTION PLAN STATUS:: December 31,1989.

ORIGINAL . CURRENT ~ .

~

IAP NO. ACTION ITEM TARGET DATE TARGET DATE COMMENTS Al Commumcaten Strategy for Goals, 12/31/90 12/31/90 Priorities, Expectatens A2 Improve External Relationships 01/31/90 01/31/90 l B1 Implement Technical Support 09/30/90 09/30/90 Move of Technical Support Improvements into protected' area may be.

. delayed.

B2 Implement NED Organizational 06/30/90 02/28/90 Improvements B3 Implement Nuclear Training 06/30/90 05/31/90 Organizational Impmvements B4 Implement Control & Admimstration 12/31/89 Complete' Organizational Impmvements B5 Implement Nuclear Plant Support 06/30/90 06/30/90 Organizational knprovements I

B6 Ise.pa..m.it Outage Marg..e.; & 12/31/89 Co.in:,. OA Modifications Organizational Imp.uvements C1 lit.p.,...a.t Corporate Nuclear

  • 06/30/90' 03/15/90 Prioritization Process C2 Establish NED Budget Item for 12/31/89 Complet#

Genenc Waik C3 Establish Budget & Release 12/31/89 Complete * *L V. WaSoner memo to Process for Non-IPBS Eif. ig R. E. Helme, dated 12/18/89.

  • Indicates change from previous month's report. IAPS
. 1

~

. - . __ _ . - . . . _ . ~ ,. . -. . _ . ~ . _ _ . .._,... . _ _ . . - _ . _ . . _ . _ . - . . . _ . _

E. -' ;.1 BRUNSWICK NUCLEAR PROJECT INTEGRATED ACTION PLAN STATUSi December 31/1989 s .

ORIGINAL CURRENT ,

IAF NO. ACTION ITEM TARGET DATE - TARGET DATE COMMENTS C4 Develop long Range Plannmg Budgets -12/31/90 12/31/90 for Emerging Issues / Regulations DI Resolve Surveillance Test Program Questions 03/31/90 03/31/90 D2.1 Improve Management of Maintenance Backlog 06/30/90 Compicte D2.2 Strengthen Maintenance Planning Functions 06/30/90 06/01/90 i

D3 Fine Tune MOV Maintenance Program 06/30/90 06/30/90 D4 Develop Post-Maintenance Testing 10/15/89 Complete * *ENP-16.12, rev. O, approved for ASME Code Repairs 10/04/89; PLP-08, rev. O, approved 11/21/89. Both preadures were drafted by original target date of l 10/15/89.

D5 Impko~4 Reu,.. .erJations of HPCI 12/31/90 02/28/91 Schedule slip due to delays Reliability-Centered Maintenance Study in herm6 a HPCI crg.-

D6 Address ServKe Water System Design 11/30/90 11/30/90 Tied to Unit 1 Refw:..g Issues Outage.

D7 Confirm Design Basis for Key Brunswick 12/31/91 12/31/91 Systems D8 Complete Update of Corporate and 03/31/90 03/31/90 Site Design Pmcedures D9 inupk..w.a Corrective Action Program 04/30/90 04/30/90 Improvements

  • Indicates change from previous month's report. IAPS 2

. . . -.a _ . . . . - - - . _ . , _ . - _ . . _ . _ . . - _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _

1 -

.~yy

  • ~ =; ~ '

C. J 'c _g

~~

12RUNSWICK NUCLEAR PROJECT .

INTEGRATED ACTION PLAN STATUS: December- 31,1989 ORIGINAL CURRENT .

IAP NO. ACTION ITEM TARGET DATE TARGET DATE COMMENTS D10 Develop and Institutionalize 12/31/90 12/31/90

! Corporate Corrective Action Pror ,. si D11 Develop Corporate Program for -02/15/90 06/15/90 " Target date was moved out by Consistent P6fm...ance of Safety . 4 months to include additional i

Reviews scopeof prowdure Aa'e ment, trammg, and imple.

mentation.

D12 Improve Business Planning Pro ss 06/30/90  %/30/90 D13 Review BNP Pro dures for Compliance 04/01/90 04/01/90 with PAM Intent D14 Improve Consistency of Procurement 10/01/90 10/01/9(P "Ihis target date had Processes by Nuclear Plants , ymk .'y been extended, but in Dm..A was restored to the original date. -

l D15 Require Nuclear Services Department 12/31/90 12/31/90 t Involvement in Regulatory Modifications D16.1 Increase Role of Nuclear Plant 12/31/90 05/31/90 Support in Development of Cei-n.cf among Nuclear Plants D16.2 Formalize Instsatives to Standardize 12/31/90 12/31/90 Processes and Procedures D17 Increase Use of ISD's D;.mem and 12/31/89' Complete

  • Resouras D18 Submst Simulator Certification 12/31/90 12/31/90
  • Indicates change from previous month's report. IAPS 3

'b a .

BRUNSWICII NUCLEAR PROJECT ..%

INTEGRATED ACTION PLAN STATUS: December 31,1989 ORIGINAL CURRENT ,

IAP NO. ACTION ITEM TARGET DATE TARGET DATE . COMMENTS D19.1 Implemer.t System for Respondmg to 05/31/90 05/31/90 Training Requests D19.2 Provide Coordinated Response to 05/31/90 05/31/90 Regulatory-related Training Requests D20 Revise Stauxiing Instructions Pro dure 10/27/89 Complete W1, rev.10, dated to Require Index Log 10/24/89.

D21 Review SWPCG Charter /Cuides for 07/31/90 07/31/90 Cmwnt Goals, Pnontees

- D22 Implement Tagging and Labeling 02/28/90 02/28/90 Improvement Program D23 Integrate PM Vibration Program with 12/31/90 09/01/90 t

ASME Sec. XI IST Program i

. D24 Implement Budgeting of Small 12/31/90 Co..gi;c Engineering Support Pmpects D25 Use Protect Ma. y..~..; Approach in 07/31/89 Complete Planning / Execution of Outages ,

, D26 Formalize Plant Work Schedule 12/31/89 02/28/90* ' SOP 2.41 meets the intent of Adherence Control D26 c. .p-, but is bemg revised regardeng fra,a.q and describution.

4

  • Indicates change from previous month's report. IAPS 4

IP"

.E * ,

7 -c ~fi

~

.~ , - ;.., .

r -

x . _ ._. _

']. ;%

BRUNSWICK NUCLEAR PROJECT rINTEGRATED ACTION PLAN STATUS: December 31,1989  :
ORIGINAL ' CURRENT c 4

' TARGET DATE TARGET DATE - COMMENTS IAP NO. ACTION Imi .

12/31/89 03/ OO

  • Activities involved with this - -

D27 Improve Tracking / Disposition of - item require substantial input'.

Temporary Repairs / Conditions to from other CP&L departments, Expedite Elimination which wasn't immediately avadable.

Revise EOP's to Simplify and Match 12/31/90 12/,31/90 ,

D28 BWROG Guidelines 06/30/90 06/05/90 D29 Implement NGG Gatideline Re: Structure of CP&L ISI Programs, and Establishment of 6-Month information Exchanges 06/30/90 06/30/90 D30 Implement Actions for Administrative Cost Containment Consolidate, Update, Simplify BNP 09/30/90 09/30/90 D31 Procedures 12/31/89 Complete

  • El Define, Track Operational and Manage-ment Performance; Document Goals to be Used to Manage Performan .

Ensure Irny. ova.a.: Programs Are 09/30/90. 02/28/90 E2 lisiyk,,wated/Morntored 01/31/90 03/30/90 Training schedule has been '

E3 Revise IJOR Pmgram, Emphasizing finalized, with LOR Phase I Effective Control Room lag Entnes from 02/19/90 to 03/30/90.

IssueIntegrated Audit /Surveillanm 12/31/90 '12/31/90 E4.1 Plan for BNP Engineering IAPS

  • Indicates change from previous month's report.

5

_______ E

p _.

s,. -_ . .

- BRUNSWICK NUCLEAR PROJECT . .

. Y.: .-

~

~

' INTEGRATED ACTION PLAN STATUS: . December 31,1989 ~ 2

.:_s ORIGINAL ' CURRENT ..

TARGET DATE TARGET DATE COMMENTS IAP NO.  ! ACTION ITEM Develop Corporate QA Performance- 12/U/90 12/31/90 E4.2 Based Overview Plan Adjust Audit Improvements in Pmgress 12/31/90 02/28/90 E4.3 to Address DET Conclusions 12/31/,89 12/31/90

  • Scope expanded to develop-E5 Analyze Methods of Independent . ment of a company-wide Assessments for Performanm
  • program to improve the Evaluation quality of CP&L's nuclear oversight functions.

04/28/90 Complete ' Revisions approved 11/24/89.

E6 Revise ITs for Proper Evaluation of Servxe Water Pump Performance -

Implement Career Development a'nd Job 06/30/90 06/30/90 F1 Rotation Pro ss Incorporate Quality, Safety and Cost .06/30/.90 06/30/90 F2 Effectiveness criteria in Performance Appraisal Program Review Awards and In ntives; Develop 12/31/90 12/31/90 F3 Plans for Enhancements Provide formal Training in Business 03/31/90 03/31/90 F4 Fundamentals Implement Actions to Resolve People 02/28/90 02/28/90 G1 Issues, Including Employee Suggestion System

  • Indicates change from. previous month's report. IAPS 6
... f
TV 2-

. BRUNSWICK NUCLEAR' PROJECT -

-INTEGRATED ACTION PLAN _ STATUS: December 31,1989 '

ORIGINAL L CURRENT' .

TARGET DATE TARGET DATE COMMENTS IAP NO. ACTION ITEM Reemphasize and Encourage Support of .03/31/90' 03/31/90-G2-TQ Process

~03/31/90 12/30/90 " Scope expanded to include G3 Improve Organizational and Individual - monitoring of io6.. A..taGwi, -

Ownership Commitments, including and an opinion survey of -

Procedural Adherence operators.

  • Indicates change fium previous month's report. IAPS 7- _

12/3he!*;.:.

BRUNSWICK NUCLEAR-PROJECT 1 LEVEL 2 IAP - -

.~

RESPONSIBILITY TARGET DATE COMMENTS IAP NO. REF. ACTION ITEM Communication Strategy for Goals, Starkey . 12/31/90 A1- CRC 1 BNP; CRC 5 - Priorities, Expectations:

CRC 11 . 01/26/90* "Ihe comenmucation strategy

- Develop and document strategy for Core *

a. was formulated prior to the Brunswick. C&A

. target date, but not Iw;.u",--

documented.

Track and document implementation Core

  • 12/31/90
b. -

of strategy components. C&A G

4 w

--_ l

-. w . . . , ,

~ . ..

- O - .

. w pv  ;;, -

~

3 "-l

~

BRUNSWICK: NUCLEAR PROJECT .

t_ 12/3Gs9J

- =

LEVEL 2~IAP '

. .. 1.;

RESPONSIBILITY - ' TARGET DATE ~ COMMENTS  :-

~

IAP NO.- - REF. ACTION ITEM X

. Watson . '01/31/90 ~

A2 Improve Extemal Relationships:

NGG _

Watson . Complete OA CRE 33 a. Centralize accountability for NRC/ '

INPO effectiveness. NGG^

Cutter . Complete * - "Ihe CP&L/NRC Interaction CRE 34 b. Finalize CP&L/NRC Interaction Plan. Plan described an '.. '4 NSD CRO 27 ' tation E,y which contained CRO 28 eighteen tasks. - AH eighteen tasks were u,. 3A ; by Dewmber,1969. ~

~

Cutter. 01/31/90 ,

CRO 29 c. Assign clear responsibilities, goals, '

and time frames for each polig and NSD CRO 30 program development action in the CP&L/NRC Interaction Plan.

\

l IAPS2

  • Indicates change from previous month's report.

2-

- . . . _ . _ . a

- g- ~ g _, y:

~. .

"- .+-. .;. .3g

~

~

112/31ye9 N

~

1 BRUNSWICK NDCLEAR-PROJECT? '

LLEVEL2 IAP: - -

,; -: ~.

RESPONSIBitJTY TARGET DATE - - COMMENTS, ..:->-

.- IAP NO. REF. ACTION ITEM Implement Technical Support Improvements: ' Helme 09/30/90 B1 '

- Tech Support

. Helme 01/31/90- Mission and functions CRE 10 a. Clearly define and communicate mission - completed;10 be contained!

and functions. Tech Support l in ENP-1.

Helme - Complete OA" CRE 11 b. Consolidate / streamline organization ,

structure. Tech Support Helme Co.i-6:c OA CRE 12 c. Determine long-range human resource ~.

,needs.

Tech Support -

d. Continue system engineering development Helme . 03/31/90 CRE 13 efforts. Tech Support

' Relocate Technical Support personnel to Simpson* To be CRE 14 e.

C&A Determmed within the plant protected area.

IAPS2 ,

o Indicates change fnnn previous month's report.

-.3' Vm-e____

.- s -- j _ g. wyn 7gg_

s ;  ;'-~-

+ ,,:. . g.g .

~

12/3r/89I y BRUNSWICK NUCLEAR YROJECT

~

J~~

~

LEVEL 2 IAP -

RESPONSIBILITY TARGET DATE COMMENTS -c ACTION ITEM IAP NO. REF.

-Lucas 02/28/90~

B2 Implement Nuclear Engineenng Department -

NED-

' Organizational Improvements:

'Lucas Complete ' '~OA CRE1 a. Complete organization and staffing CRE 6 of Brunswick site NED group.. .NED Lucas Comple:e .. OA CRE5 b. - Determine long-range human resource needs. NED CRE 7 CRE 8 .

Lucas/ 02/28/90'

  • Draft guide is in CRE 9 c. Establish a Brunswick-Raleigh .NED Brown . review process.

rotation program, by developing a policy to include appropriate tasks NED and skills, candidate performance, schedule and temporary assignments.

Simpson Complete

  • CRE 21 d. Develop detailed and plant specific implementation plans for standard- C&A _

ized site /NED procurement functions.

Lucas/ Complete CRE 27 e. Transfer Brunswick EDBS function and personnel to NED. Brown NED

  • Indicates change from previous month's report. .IAPS2 4'

~

% w - . . _ _ _.

. .- ,;  :: m

~

=

? f NY BRUNSWICK NUCLEAR PROJECT .

?12/31189? ' -f LEVEL 2 IAP g-;-..

TARGET DATE - - COMMENTS N ACTION ITEM - RESPONSIBILITY .

IAP NO. REF.

Martin 05/31/90 B3 Implement Nuclear Training Organizational NTS.

Improvements:

Complete .. OA-CRA 32 - a. Review activitier performed at the E&E Center and plants, to , identify work needing more emphasis and ^

tasks that are not being cost

- effectively performed.

Complete OA CRA 33 b. Whese appropriate, reallocate training responsibilities and pax,r-.d among nuclear program training units.

Redirect organizational focus of re- ' Martin 05/31/90 CRA 34 c.

sources remaining at the E&E Center. NIS O'Sullivan 05/31/90 CRA 35 d. Implement procedures and practices to improve instructor utilization. IIIU Transfer Real-Time Training fmm Complete CRA 39 e. ^

all plant organizations to the -

Brunswick Training Unit, except Operations R'IT.

Cou@;c CRA 40 f. Address IriU use of contractors.

Complete CRA 41 g. Clarify training mission, roles,'

and responsibilities between BTU and the E&E Center.

Resolve confheting objectives Coma;c CRA 42 h.

between BTU and Brunswick Plant '

and industry segulators.

IAPS2

  • Indiates change from previous month's report.

5

c;_ - -

~

1 &

~

~

e5 T1213r/894bf 3~ hBliUNSWICK NUCLEAR PROJECT -

~

LEVEL 2 IAP- -

.: 6 COMMENTS

~

' RESPONSIBILITY ' TARGET DATE I AP NO. REF. ACTION ITEM

[

i

. Simpson ~ Complete

  • B4  ; Implement Control & Administration f~

Organizational Improvements:

C&A- .

l Lewis ' Complete CRA 3 a. CIdrify roles and responsibilities for completing plans and budgets. . B&BP.

CRA 5 George Complete CRA 23 b. Evaluate'Information Services staffing needs and document in ' SISU Business Plan.

Simpson Complete CRE 23 c. - Transfer all site procunement engineering activities and personnel C&A to Control & Administration.

Jones * . Cm pk;c' ~

CRE 24 d. Develop Procurement Engineering mission statement, job descriptions, Proc Eng and performance goals. _

Simpson C6...yk;c' ~

CRE 25 e. Develop plan to limit Procurement Engineering design basis responsibility C&A ,

consistent with the CDO wou yt.

Cmeyk'c :

f. Develop long-range staffing plan Jones
  • CRE 26 for Procurement Engineering 'C&A .

l 1

IAPS2

  • Indicates change from previous month's report.

6- _

~

~

~

.w +

g m.g w, m .-

..,; ~,

. BRUNSWICK'NdCLEAR' PROJECT ~[' 32/3ihie$hh

^

1

. LEVEL 2 IAP: . _

. . y; -J IAP NO. REF. ACTION ITEM RESPONSIBILITY _ TARGET DATE / COMMENTS  ;..

B5 Implement Nuclear Plant Support Hill ~ 06/30/90 Organizational Improvements- ' NPS CRA 50 a. Undertake thorough review of ' Hill Complete .OA -

NPS .;

activities performed by NPSS cost -

reporting and administrative

  • services units.

CRA 51 b. Merge NPSS cost and administrative ' Hill ' Complete OA units and eliminate / downsize activities NPS_ _

and functions not a>re to Company's overall objectives.

CRO 24 c. Establish a stronger role for the Nuclear Hill Complete OA' l - Plant Support Section. NPS CRO 26 d. Staff the NPSS with individuals who Hill 06/30/90 Manager - Corp. N'uclear have plant expenence, using rotation . NPS Maintenance position -

program. filled by individual with :

l plant expenence- 11/04/89 l

i CRA 52 c. Standardize remaining corporate nuclear - Coats 06/30/90 support activities. EVP Staff 1

  • Indicates change from previous month's report. IAPS2 7

-. - - - - . = . - = . :- -

_. . = -- -

~

2^'

-'. ~

m =. : m - -

~

g w/

~ !:

l

~ ,

g

-j.

M,. ' -

"" ~~

'i12/31/Q9)'h

~

BRUNSWICK NUCLEAR PROJECT

~

.u

- (LEVEL 2:IAPl

  • f

~

.[ . n; . _ . .

n' a-

['

~

IAP NO. REF. -ACTION ITEM RESPONSIBILITY TARGET DATE ' ~-m COMMENTS - , . ,

B6 Implement Outage Management' & Holder Complete Modifications Organizatenal - 'OM&M -

  • Improvements:

- CRA 38 - - a. - Reassign and/or eliminate Kelly ' .. Complete training activities performed OM&M by BCU.

CRE 04 b. Continue efforts to evaluate Kelly . - Con W e-alternative methods for OM&M modification / outage support.

1 i

I l

l l

  • Indicates dange from previous month's report. IAPS2

.g

.@-y ges 'g

%_ .m,g. .w,. gi.m-.m..s-w "5 %5__ <--

+,weg +.y.A p

.e.. gp5,7 %v pg . cme y,ggy_'-,9 i .M p p.$  %, he_w% i . g, M, , pg-_wv*- , tiCg ,wwa _ g- ___g gv_-_-_ g., 2L_"__ -

_-_.-:we F .de JJ

, w ,--. . - .

~ -:~ ' -

Lg. , ..

, .4 - , ,.  ! k '* ^h'~ -"

m

~

~ ~

- ;. n

. BRUNSWICK NUCLEAR PROJECij ' '  :!12/3ds9;Oh 1 LEVEL?2 IAPe

~

, ,; . 7,-

- ~

IAP NO. REF. ACTION ITEM RESPONSIBILITY '-TARGET DATE COMMENTS  % -

- - ^ '

Cl CRA 6 ' Implement Corporate Nuclear Prioritization . Wagoner i 03/15/90 '

" Task Force i.a ...g scheduled ; -

OM&M Process: for 01/1_0/90 to assess sestus.

a. Develop guidelines /pmcedures for . IWagoner Complete '

' BSP-36 amo.ed 11/03/89.:

use of the pnoritization pmcess. OM&M L *ENP-20, rev.11, approved _

10/27/89.

b. Develop guidelines / procedures for - Wagoner - 03/15/90-linkage between pnority ranking .OM&M and budget inclusion.

CRE 15 c. Finalize TQ Team _ efforts to develop . . Wagoner Complete -

p

- corporate pnoritization. OM&M CRE 16 d. Adapt corporate process of . -Wagoner 01/30/90 prioritization of work to Brunswick. OM&M CRE 17 e. Apply prioritization ' process to 'new .

Wagoner 01/30/90 work and existing backlogs. OM&M-l l .

a

  • Indicates change from previous month's report. _

IAPS2

-9 _,

_ ._ _ . . _ ._ , , . , , _ _ .,_s..-.-. _m. , . _ . _ ._.._,2, - . __ _ _ , _.-. _ _ _ . . , , ._

- p

. ; ,77, -- .-- . y;; , -

,, 3, g,.

.y ,

+. .

.c -

~~

.e li2I3U$9Ejhf

- BRUNSWICKtNUCLEhR1PROJEC" .

~ ~

LLEVEL'2 IAPs

- ' ~ - ~

, me l: . a'.. .

I.

p.

IAP NO. REF. ' ACTION ITEM . .

. RESPONS!BILITY TARGET DATE .- COMMEN13 ..-

r-

. 'k ' .

(, ,

-C2 CRE 2 - E=tablish A Nuclear Engineering- Lucas. Complete * *Acannplished as part of s ' 4' L Department Budget Item for Genenc Work.

. .NED- ^ 1990 budgeting process.  ;

'i

. a

~

  • Indicates change hom prenous month's mport. LAPS 2

.:10 m ,M.,. .-wo .e m.s. _m--w .am -v s,.-.m.m e. eme_. .,4,e a s.anws inw.-4w-.w. ...-_. san,w.4g.r#--- e.e. -in m g.mi.e eAnni .--,asi a s w_.ewa-- -.aw - - . .- - - -.e.,.m-.

>:= :m

, c a.. -.

+

- 1273n g t f n_

J

-LBRUNSWICK NUCLEAR?PR'OJECT

~

~ _

LEVEL 2
IAPi= '

,.~': . .

' RESPONSIBILITY TARGET DATE COMMENTS ..:

IAP NO. REF. ACITON ITEM "

Complete * - *12/13/89 memo from L.V. ;

- Wagoner

~

C3 CRE 3 Establish Budget and Release Process for (Wagoner to R. E. Helme, Non-IPBS Engineering: - OM&M-re: Identifymg,Scopmg,and Scheduling Work through PCN-~

G0015A, Small Modifications?

Worth ' Complete

a. Develop criteria for this category of project (e.g; engineering Tech Support manhours, type of work, etc.)

Worth  : Complete

b. Estimate number of projects .

which will fit this ategory. ~ Tech Support Establish a budget item in 1990 Worth Comy,2 c.

Business Plan / budget. - Tech Support W orth . Complete *

d. Develop releasing mechanism and approval levels for funds for - Tech Support Wagoner such projects.

OM&M Establish a cost tracking - Worth CumA;,7

e. .

mechamsm.

Tech Support Wagoner

'OM&M .

lewis B&BP IAPS2

  • Indicates change from previous month's report.

11.

~

BRUNSWICKJ NUCLEAR'PROJ8CT '

(12/31-(89J, 5

= ~

. LEVEL 2 IAP..--

RESPONSIBILITY ' TARGET DATE - - COMMENTS .,

IAP NO. ~REF. ACTION ITEM

. Cutter ~ 12/31/90 C4 CRE 35 Develop long-range Planning Budgets for .

Emerging Issues / Regulations:

NSD loflin~ 12/31/90.

a. .- Annually,in support of long-range
planning process, coordinate develop- Ixensing ment / update of comprehensive cost and '

schedule forecast for emerging issues /;

regulations.

N IAPS2 o Indicates change from previous month _'s report. ,

12

r 1 y- - -- -,--

m_ . . .

' "' ~

'e-,^

s ,

di2/3f/8951m BRUNSWICK NUCLEAR' PROJECT -

~

~f

.c

LEVEL '2:IAP - 1=, -

.;w -

y - -.?.. -; " Q -

+-

- IAP NO. - REF. . ' ACTION ITEM . RESPONSIBILITY ' TARGET DATE COMMENTS .; .

Resolve Surveillance Test Program - Starkey; 03/31/90 D1 Qu'estions: . BNP

- a. Develop a plan to sample the > ,

Jones- ' 03/31/90L Tech Spec. data base to gauge ONS accuracy.

b. Re-evaluate the Brunswick. electrical' ,

Rothman 03/31/90 distribution system for compliance -

NED with CDC-17.~

c. Complete actions in response to LER . Starkey .~ Complete - LER submitted 11/1/89, ,

1-89-016 (stroke time testing for BNP . BSEP/89-0961.

certain containment isolation valves.) -

d. Improve sampling plan for QA.sur-: .

Dorman* 03/31/90 '* Plan approved 12/20/89; to be.

veillance of Technical Specification CQAD implemented 1st quarter,1990.

requirements. ,

w, a

g,. ,. . .s

  • Indicates change from previous month's report. IAPS2 13:

4d<- .-

,g, 4-g.awer-e-er.-.eam' -gw as mes,4, wk,ty me, ,-N-.q- <g1 ,- 1%% a, p pp sp. 3ps +d  %-Ja,,=% -f,a ,9-.n e. h.4 v- .me y- .a a.,s. t,%y #, 1Ast-, e + g- -yy-g .g-____-_____sm , u .y__-f.-'

. , + , _

~

j .:

    • ..O l ?g A' - '

~: _" y '_ ,,,

.g_ , .[ ^4 ._ '

BRUNSWICK NUCL. EAR = PROJECT; -

t su/31/1!9 @

LEVEL 2-IAPE

?"

- u

.c .

IAP NO. ' REF. ACTION ITEM RESPONSIBILITY -. ~ TARGET DATE 5 COMMENTS . - _

' D2.1 Improve Management of Maintenance ) Warden" .

Complete '

Backlogs: : ' Maintenance -

T

. a. - Apply the Nuclear Pnoritization . . Smith Complete ' On November 6,1989, the

- Pmcess to the maintenance backlog. Maintenance ~ new pnoritization system was % -.w..RJ.

' b. Improve utilization of,the Automated Warden . Complete

" Maintenance Management System. Maintenance -

c. Implement a new Maintenan Backlog- Warden Complete SOP 2.45, "Maintenanm -

Manageanent Procedure. J Maintenance Work Order Management" -

l-was issued in September, ~

1989.'

a-

  • Indicates change from previous mon' th's report. - IAPS2
14-(i  ; , _. .u . . . .
,_ - . .u - a . -. : , .. .- . ; ;u_ ~ - :::u ~ a ' -. _ ,,, . ,. , ,, . , ;. - . . a , u ,, , , , ~ , , , . _ .
a. - -:w- - = ;---

c._ ~ g- mn _m +:

m -; :p 3

=7 3

~

_ ._ .

u

~

~

sBRUNSWICK NUCLEAR: PROJECT . = a2/3i/89?fi.J:;f T

~

c' ~

! LEVEL 2 IAP. _- y 8

I IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE ' ' COMMEPTT$ .. [ '

. D2.2 CRO 19 - Strengthen Maintenance Planning Functions- Warden ~ 06/01/90 Maintenance

~

a. ' Finalize the charter / mission statement - Musser Complete

- of the Brunswick Maintenance Planning ' Maintenance .

Subunit.

^

b. Complete 'the position' description for lMusser 01/19/90 the Maintenance Planner / Analyst.~ Maintenance
c. Establish specific guidelines for Musser 03/02/90 Planner / Analyst. . Maintenance
d. Develop or acquire a formal Maintenance Musser 05/04/90 Planner / Analyst Training Program. Maintenance

-a

e. Implement Planner / Analyst Training Musser 06/01/90 _

Program at Brunswick for existing Maintenance and prospective Planner Analyst.

f. ~ Increase the amount and scope of Musser 03/02/90 Maintenance planning completed Maintenance

- before scheduled outages.1 J

~

!

  • Indicates change from previous month's report. - - IAPS2 .

.15. _

w+wwa,w-- ,,.y-, -e4-- -9**w.n w-4AL.y , .-~

. p- r ,wm.--.,,g"q y p- v ie earhig.q~ r=4 smg y.m =p sw., .

.p v e d., A

.w + >,.,evi. .

me+,,4 -i, sin w w 4,ygy g .h+ . , . ca w.r,, .k m a;wr., y,g w.gg,eh'.

j_

' x

~

.;;334g

  • ~
BRUNSWICK NdCLEARsPROJECT .

112/3#49Yk -u

- LEVEL 2-IAP -

~

IAP NO. REF. ACTION ITEM . RESPONSIBILnY

- TARGET DATE - COMMENTS . -

D3 -- Fine T$ne MOV Maintenance Program: Warden 06/30/90' Maintenance

a. . Revise OCM-M0500 (lubrication of ' < Warden Co.v.v.,.:,.

actuator gear boxes). - Maintenarce.' ,

b. Review and make necessary changes Musser - 06/30/90 to MOV testing procedures.-'  : Maintenance.' ,
c. Review adequacy of MOV preventive - Musser " 06/30/90 maintenance program and scheduling. Maintenance -
d. Review engineering procedures for To be 06/30/90 consistency. Determined - ,

i

?

  • Indicates change from previous month's report. IAPS2.

116.

- . - . _ _ _ . _ .m . _ . _ _ . - - _ _---m. - - _ . _ - - -

x -- ~. ., . .. _

n; y , 2 - - '- u -

~ ~

~

~

.BR'UNSWICK NUCLEAR' PROJECT . '

12/31/89i- T

~

' LEVEL 2 IAP -

~

~

~

_ s-1

'IAP NO. - REF. -- ACTION ITEM RESPONSIBILITY TARGET DATE . COMMENTS -

D4 Develop Post-Maintenance Testing for Helme i . Complete

  • ASME Code Repairs: Tech Support..

a.' Complete development of ENP-16.12. Helme  ! Complete ? ' ~

Tech Support Helme Complete -

~

b.' . Complete development of PLP-08. .

Tech Support -

l t

,. . =

l l

i .,

  • Indiates change from previous month's report. -IAPS2 17 -

_ _ . _ _ . . _ - ,u _ _ ,_. . . . _ . _ , _ _ . c., a_ , , , - , _ ~ . _ _ . , - . _ . . . . . . , - - - . . _ . . . . _ _. -

_ ;~

= ~ -

~

. q :m

~;.,

' 112/3r/p9PT.t IBRUNSWICK: NUCLEAR PROJECT

~

~ ~

- 2 LEVEL 2 IAP -

RESPONSIBILITY - TARGET DATE COMMENTS -.

IAP NO. REF. ACTION ITEM Helme ' .02/28/91- PHPCI engineer has been i ~

D5 CRO 13 Implement Reconunerdations of HPCI ~ selected,' and offer should :

Reliability-Centered Maintenance Study: Tech Support CRO 14 be extended mid-January,1990.

Review HPCI RCM and list , Helme .. 04/15/90

a. -

Tech Support -

recommendations evaluate and prioritize recommendations, ategorize .

recommendations, perform cost / benefit analysis of recommendations, and perform potential problem analysis.'

Obtain management direction on Helme 05/31/90-b.

recommendations. Tech Support

. Helme - 11/01/90

c. Implement changes requiring procedure revisions only. Tech Support Initiate PID's on items requiring Helme 09/01/90 d.

modifiations,if any. ' Tech Support Helme 11/01/90

e. Obtain vendor concurrence on recommendations affecting vendor Tech Support reu-m.wrd.tions.

Initiate diesel generator RCM in Helme 12/31/90-CRO 15 f.

cxmjunction with CNS SSH on Tech Support diesel generators, by performing actions in (a.) above for diesels.

Present results to management of HPCI . Helme 11/01/90 g.

work to date. Tech Support IAPS2 -

o Indicates change from previous month's report.

.18-

\

y,  :- - -

7 ppg 1~ ,. . . :n - se qe -

. .  ;.x vn

.BRDNSWICK NUCLEAR; PROJECT - ~

[12/31/6 i

~

! LEVEL' 2- IAP.-

.3 :x

. ACTION ITEM

^

RESPONSIBILITY ' - TARGET DATE COMMENTS i IA? NO. ~ REF. . .

L Helme . Beginning DS h. Establish pmgram to review impact.

- of HPCI RCM quarterly. ~ Tech Support 11/01/90

. Helme - 02/01/91 ~

2

CRO 16 i. Assess value of RCM for RCIC and..

. Tech Suppoit other safety systems.

Helme  : Beginning '.- ._

j. Repeat actions of HPCI RCM for .

diesel generatons, startmg with ' Tech Support 01/01/91 (b.) above.

Helme 02/28/91 CRO 17 k. Present results of RCIC and other .-

. safety systems' RCM review to. Tech Support management with recommendations.

4 o-*

- \

IAPS2

  • Indicates change from previous month's report.

19-  !

.._u

~~

f"{ 4, _ ^ ;}

m:;

~, ,

412/31/m 't :

i  : BRUNSWICK-NUCLEAR 1 PROJECT =

LEVEL 2 IAPJ i.r. .

~

RESPONSIBILITY- TARGETDATE COMMEN FS I c IAP NO. REF. " ACTION ITEM .

Address Service Water System Design; Brown 11/30/90 D6 '

'NED - _.

1ssues:

Bishop Complete * **lssued 12/28/89.' -

a. Issue final report documenting hydraulic bases for system and - NED-system compliance with the bases.

04/30/90 ~ Initial review completed Complete review of SW mods. to Bishop

b. 10/3/89.

ensure that they are enmmpassed NED by design analyses and test activities.

11/30/90 *Iled to Unit 1 Refueling.

Completeinstallation of upgraded Bishop

c. Outage cross-tie valves. NED Bishop Complete
d. Complete upgrade of fourth SW pump.

motor. NED Bashop Complete'

e. . Establish temp,erature monitoring program to track remaininglife NED

. for SW pump motors.

Bishop Complete

  • Issued 12/29/89.
f. Issue final SW project report.

NED Complete * "Ihe inspecten was (wo6'J

g. Perform a safety system functional Jones 12/20/89 and the report is inspection (SSFI) of the SW system. ONS scheduled to be issued 02/01/90.

^ IAPS2

  • Indicates change from previous month's report.

~

20 : .

m .

_ ua s

,? ' > ;3 ' b * .i nw

~

~~

~

BRUNSWICK NUCLEAR PROJECT: - w 1.i2/31/89; M

^ -

LEVEL'2 IAP 1 -u

~

. .=;u -

l- ' RESPONSIBILITY TARGET DATE . . COMMENTS

l. IAP NO. REF. ~ ACTION ITEM .u -<

! ' D7 Confirm Design Basis for Key Brunswick ' Brown 12/31/91 NED

~

~

l -Systems-

a. Complete the United Engineers & langlois 12/31/91 < *66. total packages: 41 Constructors (UE&C) and General . .NED' turned over to CPal,30 Electnc System Design Criteria

- have received CP&L -

' Turnover Pmject. Owner's Review,5 have..:

had a plant mod. review.
b. Complete the UE&C Piping Design . Langlois , 12/31/91 25A% completed.

! . Turnover Pmject. NED-l

c. Evaluate the results of the SW mod- Brown 06/30/90 SSFI in progress.

l ification review and SSFI findings" NED and the HPCI and SLC SSFI results, and Bishop

  • identify and document any further NED- -

necessary actions.

. .t N

  • Indiates change from previous month's report IAPS2 21.

m .

,#4.^- , ._ m g.m_a-4.es,,i-a n epi.auamn+-', q-.g-.-- w m e- 85 w we r'wh.p.w. m. M uW-p re, *'+.%438=Wy*rVdW'-2F N-4 "*"T'e V

&d--.f--r'***y -

44

    • b  % **49 N ra eyyIa . M H MW8' __m_ i *2"p

e -

s. .- 3 y.- .

--y , m m.=. ,

T G ~w; .. _y ["

f

~

' BRUNSWICK NUCLEAR PROJECT! -

12/31 89.h*

~

i

LEVEL 2.IAP ? -

q . . ; ;;

IAP NO. REF. ACTION ITEM RESPONSIBILITY ' TARGET DATE:. COMMENTS ,_.

D8 Complete Update of Corporate and  ; Brown ': 03/31/90 - *27 procedures, Site Design Procedures. .NED .9 revisions u,. 6;,./ ;

~

approved,5 revisions -

in development,9

' - ~ voided,2 combined,'

l 2 in review. _

l -

~

w

  • Indicates change from previous month's report. IAPS2
22

_ _ . _ . ._. - _ - - - - _ _ - .- __ _ _ . _. _ . _ = = . =-

. - x & 3 '

s-

.m- -

r+ - -.-

~

z-2'7*

~r-

., i'17 y

5. _._ a; _

i, BRUNSWICK NUCLEAR PROJET ~~

12/3r/89i ' 5

'~ ~

y -

LEVEL"2 IAP2 . . _

- ~ .;

IAP NO. REF. IACTION ITEM ' RESPONSIBILITY - TARGET DATE : _ COMMENTS c D9 Implement Corrective Action Pmgram. Harness '- '04/30/90. -

5.

Improvementsi :BSEP Mgr Complete' - *PGMM 90402, revision 1 CRO 3 a.- Develop a Brunswick nonconformance Harness - ~ ~ ~

policy statement. BSEP Mgr. -

. CRO 4 b. Establish incentives for self- . Harness Complete * 'PGMM 9(M102, revision 1.

CRO 5 identification of nonconformances. BSEP-

c. - Issue revisions to PLP-04 to lower Moyer 03/31/90 threshold levels and improve trending ~

BSEP-and training. .

CRO 6 d. Complete additional training on ~

Moyer 04/30/90 PLP-04. BSEP

e. Identify a Brunswick corrective - Harness C6mplete action program' coordinator. 'BSEP .
f. Identify a senior Human Performance Harness Complete W Evaluation System (HPES) coordinator BSEP at Brunswick.
g. Issue PLP-06, System Engineer Helme . Complete Program. Tech Support
  • Indicates change from previous month's report. IAPS2

?23 _ .

w

+s.,, 'nnein.,iw .an- en'-+-+mv w *% --- a*sme,... yy'i. .- up.-*-g eg '*T*, "l-F7 --*='t viy"e- g. y m*f"1 * *gN* '-pV-p. #6# g- ? g3 6-

._ '% W 'd-Tw"sf*'_ es

= ; . ,,

a .: gg ; g

~

r -

E.

I -BRONSWICK NUCLEAR PROJECT g -  :(12/31/89T's,

~"

L . LEVEL 2 IAP _ -

IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE COMMENTS ..

~

D10- - Develop and Institutionalize Corporate. ' Watson - 12/31/90 NGG Corrective Action Program: . .

. a. ' Establish a group task force to Watson Complete

' develop the corporate Corrective NGG Action Program. .

b. Complete task force assignment. _Burkhart 12/31/90 -

NPS

  • Indi6tes change from previous month's report. IAPS2 24

_.~. _, . . , . , ;- . ..  ;; .. . a. . - -,,x. , . , -a..-. , , , . . _

. a, , ,,a _

7

'=  ; g

_qq -

, 7 y- -

ge 7 m

-.. m .

s, . ~

x_ -

- ,m; me.a.;

- - > ~ , i:- -

~. :BRUNSWICKLNUCLEAR PROJECT =

W #2/568.R

^

LEVEL 2 IAP ~ G _'

IAP NO. REF. ACTION ITEM : . RESPONSIBILITY TARGET DATE .  : COMMENTS . .

~

' D11 . Develop Corporate Program for Consistent

~ Crawford : :06/15/90 Perfonnance of Safety Reviews: . . CNS ~-

a. Complete development of a corporate Crawford '02/15/90' ' Draft Policy and .:

program to ensure a . consistent method CNS - Procedure Manual for performing safety reviews (10CFR5059), ' in Management review.

incorporating the best features from'~.

CP&L's three nuclear sites and supporting

- organizations, and NUMARC guidance. ~

b. Procedure development, training, and . Crawford 06/15/90 "rask Force mee on 01/10/90 to :

implementation of the program. CNS kick off the implementation .

- phase. An action plan has.been ~

&.M. Training on the new program is tentatively scheduled to begin in late March,1990. -

i

  • Indicates change from previous nwnth's mport. IAPS2

-25

._ . . _ _ . .: _ . , _ . .x . _ _ , , - . - . _ , _ _ -- _ - . _ . _ . . , , .

m _ am '

' 'E

._ BRUNSWICK NUCLEAR PROJECT 12/31/s9 -

LEVEL 2 IAP IAP NO. REF. ACI1ON ITEM RESPONSIBILITY TARGET DATE COMMEWrS ,

D12. Improve Business Planning Process- Sunpson 06/30/90 C&A ,

CRA1 a. Ibrmalize the process for initiating tems 06/30/90 and finalizing budget and busmess B&BP plan targets.

CRA 2 b. Enhance the business planning process Simpson CuviS;s to clarify the " roll down" from the C&A long-range plan and " roll into" the budget.

CRA 10 c. Ensure that busmess plans and Simpson Complete budgets are receiving appropriate C&A attention.

d. Ensure contents of business plans Irwis 02/28/90 are appropnately corrmunicated. B&DP
c. Impro.ve consishmcy between the Simpson Cu..@:c l La.ss plan, the long-range plan. C&A

! and the baddog of modification j Profects.

f. Assign budget and cost control Simpson Complete T S. tewis memo to file, l .,

~,

responsibilities for corporate C&A dated 01/04/90.

l mi 6 to support departments. Re: OtESAP Km.. .._ i%

D12-F.

l l

  • Indicates change from previous month's report. IAPS2 26

, , .m-

12/3U w

~

ORUNSWICK'NUC5 EAR PROJECT ~

LEVEL 2 IAP -

IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE . COMMENTS .

D13 Review BNP Pro dures for Compliance IliH 04/01/90 with PAM Intent: NPS

a. Develop list of criteria to utilize Frazier/Daniels Complete in procedure review. NPS
b. Obtain copies of recently issued Daniels . C m ew A W
  • Report issued 12/28/89.

! pro dures (since 7/1/89) and NPS ,

gJwein review.

i

c. If deviatians of segraficance exist, To be 04/01/90 recommend corrective actions to brmg Determined Pmcedure W in comphan .

t i

l I

j

  • Indicates change from previous rnonth's report. IAPS2 l' 27 L

~

~ '

l TRUNSWICK NUCLEAR PROJECT 12/31/s9 .

. LEVEL 2 IAP IAF NO.' REF. ACHON ITEM RESPONSIBILITY TARGET DATE COMMENTS l- ,

l

} D14 CRE 20 Improve Consistency of Procurement Hill 10/01/90' *Itens h - p dropped from this -

CRE 22 Processes by Nuclear Plants: NPS action item, per direction from Det ..L 11,1989 Nuclear i

Semor Mana r ,' ud --- J--4

a. Assign Manager, Corporate Nuclear Hill Complete Assegned task Technical Support to manage tasks NPS 11/17/89.

a through h.

b. Identify all related and overlapping Waldorf 01/10/90 *CRESAP, DET and IAP recxwn-Cresap, DET, and IAP scu,.... ..dations NPS mendations se m -, .: and over- -

and other .t7,.L.any or Company lapsidentified. Identifica-activities. tion of other regulatory or coen-pony activities is in progress.

.a . c. Summarize results of 'b' and provide Waldorf 02/28/90 for management review. NPS

d. Interview individually affected NGG Waldorf 04/15/90 managers and Senior VP, NGG, to obtain NPS.

r;= ,_..wat expectations in view of their review of -.. .._dixd results in 'c".

c. Summanze interview results and Waldorf 05/15/90 transmrt to interviewees. NPS i

, f. Develop a definitive set of man o ..en; Waldorf 97/01/90 objectives based on the expectations NPS ,

FJ~cd during the i-;, m a

g. Present objectives to NGG dept. heads Waldorf 08/15/90 and Sr. VP, NGG, and obtain feedback NPS on needed changes and endo .~.~4 of agreede objectives.
  • Indicates change from previous month's report. IAPS2 28 a

, m- w ( e-*w ---w.--n,ep. yvJ. *y, 9a- *~6- d-y- J-w=,--,.-+%--, - -w, +-g-,v.-,=w-- my -- e'v-we'v==-,e2 e,,w, ->.e+,--gww.aw,,-- e-g we**-' . -pee-e_-em

m

. " ~

CRUNSWICK NUCLEAR PROJECT - 12/31/s9:-

LEVEL 2 IAP .

JAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE - COMMENTS .

^

D15 CRE 36 Require NSD Involvemerd in Regulatory- Cutter 12/31/90 Driven Modifications: NSD

- a. Develop NDS/NED interface d&-.sa Lefhn/L.icensmg 07/31/90 to ensure up-front, u,.a.. 4, and ' Lucas/NED closeert involvement of NSD.

b. Revise NSD and NED work flow, Infim/Ikensing 12/31/90 procedures, as necessary. Lucas/NED 4
  • Indicates change from previous month's report. LIAPS2 '

~ 29-we # - + - r-1'%Tr= e* --~ -rv Na-w = + '%~ ~ w w-+u- -*e- 3-w= v e v+' 7 'se*'w

  • N W - r "ww-* *s-- . . _e + --t- 2 Yw ----r - --vr=-= = --u---v--- - --- ---- " ' ' - - = - -

CRUNSWICK NUCLEAR PROJECT 12/3U m . 'w.

LEVEL 2 IAP IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DAT_E COMMENTS ,

D16.1 CRO 25 hwrease Role of NPS in Development of Cutter 05/31/90 Consistency among Nuclear Plants- NSD

a. Direct NPS to identify, cost Cutter Complete OA justify, and pursue opportunities NSD to achieve consistency among the

. nuclear projects, where warranted.

b. Direct NPS to provide focused Cutter Complete OA-directen to Operations, Maintenance, NSD -

4 Technical Support, and Outage

managers at the 3 nuclear sites.
c. Specify within the NPS business HiR 05/31/90

. plan those factors that will be NPS targeted for assenment or surveil-lanm during the year.

l l

  • Indiates change from previous month's report. IAPS2 '

30 L _ . _ _ . _ _ . _ _ - _ _ _

a - ..

BRUNSWICK'NUCLEA'R PROJECT - 12/31/89 ~i LEVEL 2 IAP- =

IAP NO.' REF. ACTION ITEM - RESPONSIBII.ITY TARGET DATE COMMENT 5 .

D16.2 CRE 38 Formalize initiatives to Standardize " Cutter 12/31/90 Pmcesses and Proculo.w NSD ,

~

a. Assign NPS the responsibility for Cutter Complete

~ for standardizing processes. NSD

b. Develop an acten plan that HiH 05/31/90 identifies major candidate processes, NPS ,

and schedules evaluahons.

c. Assemble teams to conduct evaluations HiR 12/31/90 and make recommendabons. NPS .

t

  • Indicates change from previous month's report. IAPS2

-31

.A BRUNSWICK NUCLEAR PROJECT .

n/31789: *.:

. LEVEL 2 IAP IAP NO. REF. Acr10N ITEM RESPONSIBILITY TARGET DATE COMMENTS .

~

D17 CRA 24 Increase use of ISD's Directives and Simpson Complet#

Resources:. C&A

a. Establish SISU as point of <nordin- George Cumykk ation for information system SISU resource justification.
b. Utilize ISD guidelines for hardware George
  • Complete ,

and software requisition / replacement S5U George Cou.yLZ

c. Establish SISU as point of coordination (or ISD-sponsored training. SISU t

I CRA 25 d. Formalize activites of site <nmputer - George Complete users forum. SISU Complete

  • l
e. Ensure that BNP personnel are aware George l of the resources available through SISU SISU.
  • Indicates change from gc ;uus month's report. - IAPS2 32 -

- . _ . .. . . ~ _ _ _ . _ ._ . . _ _ _ _. _ _ . . _

=. ..

w -Je y .

3_ , 3';

BRUNSWICK NUCLEAR PROJECT 12/3i/89I 5 --

u LEVEL 2 IAP -

IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE COMMENTS .

l D18 Subm;t Simulator Certification: Martin .12/31/90 NIS

a. . Integrate and complete he test . Geise 03/01/90 program for the upgraded boiler / core '. BTU
models.
b. Complete test program required for . Geise 09/01/90 certification. BTU
c. Complete document to support Geise .12/01/90 certification. BTU i d. Submit certifiation package to Geise 12/01/90 management for renew. BTU ,
e. Submit package to NRC. Geise 12/31/90 BTU i

i

  • Indicates change from prenous month's report. IAPS2 33

% F T- a 9 p--7'+n yg e 9,,e q, ., 9,..w , ,., _,. , , _ _ , , ,

. g.-

n BRUNSWICK NUCLEAR PROJECT n/31/sy E.

LEVEL 2 IAP IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE - COMMENTS .

D19.1 CRA 36 Implement System for Responding to Martin 05/31/90'

- Training Requests: NTS

a. Provide for coordination of requests Martin 05/31/90 through a single point of contact NIS develop criteria for screening, establish committee for review, and integrate reviews into penodic meetings.
b. Create mechanism for transfer of Martin 05/31/90 funds imm plant to training secten NIS for expanded training scope or requests i for new services. .

[ ..

l o

  • Ir.dicates change from previous month's report. IAPS2 34

- - , - - _ - _ . . , , . . ,_ -. . _ _ ._ _ _ _ . . . ._ . _. - . u .. . _ _ , . _ . . . . . . . - _ _ _ , _ -

y. . .

r  :... .g.

BRUNSWICK NUCLEAR' PROJECT 12/31/89 '..<

~

LEVEL 2 IAP.~ -

IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE COMMENTS .

l l

D19.2 CRA 37 Provide Coordinated Response to Martin 05/31/90 -

Regulatory-Related Training Requests: NIS

a. Develop regulatory commitment data Martin 05/31/90 base for training activmes: NIS match requesting agency with request and company response, update data base interactively to ensure it.contains a living history of responses. _
b. Establish mecharusms to screen new Martin 05/31/90 regulatory-related requests against NIS past initiatives: ensure that responses to regulamry agernes take into account histencal commitments.

Y

  • Indicates change from prevsous month's report. IAPS2 35-

~

. , . ~ . = . . ... . . . . - . . . . .- . _ _ _ - _ - _ . ____ .- _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ . _ _ .

.g-  ;- -- -- . .. .. - - .

~ #

~

: BRUNSWICK NUCLEAR PROJ5CT 12/31/s9f 's LEVEL 2 IAP ...

IAP NO. REF. ACTION ITEM - RESPONSIBILITY TARGET DATE - COMMENTS -.

4 D20 Revise Standing Instructions Procedure Blackmon Complete "OG01,revision 10, to Require Index log:- Operations dated 10/24/89.

a. Approve revised Standing Instructions. . Simon Co..@;c Operations Y

t

  • Indica.tes change from previous month's report. IAPS2 36

j.

1 BRUNSWICK NUCLEAR' PROJECT 12/31/qi +

LEVEL 2 IAP

' I %P NO. REF. - ACTION ITI'M RESPONSIBILITY TARGET DATE COMMENTS -y D21 Review SWFCG Charter / Guides for Current - Peeler 07/31/90 -

' Goals, Priorities- OM&M.

^

a. Review current SWKG Process. - Peeler Complete O M acM .
b. Compare with existing procedures. Peeler Complete
  • OM&M-
c. Draft new SWFCG procedures. Peeler 02/02/90 OMacM
d. SWICC review new procedure. Peeler 03/02/90 OM&M
e. AMMS process review (possible Peeler 01/26/90 changes to support SWICG, OM&M .

incorporate changes into SWPCG pro dures).

f. Revise SWFCG procedures as Peeler 04/06/90.

l necessary following review. OM&M l

g. Approve and implement procedure. Feeler 05/04/90 OM&M l
h. Verify adequacy of new procedure. Feeler 07/31/90 OM&M-
  • Indicates change from previous month's report. IAPS2 37.

L -

's .

BRUNSWICK NUCLEAR. PROJECT ~12/31/89 .:

LEVEL 2 IAP '

1.tP NO. 'REF. AcrION ITEM RESPONSIBILITY TARGEP UATE COMMENTS .

D22 Implement Tagging and Labeling Warden . 02/28/90 Improvement Program: Maintenance

a. Provide draft recommendations. Hagewood Complete Maintenance l Stnckland Operations
b. Management Review. Warden Complete Maintenance Blackmon
Operations
c. Appoint label coordinator and review. Harness Complete BSEP Warden l Maintenance
d. Centralize equipment and personnel. Hagewood Complete' ' Completed 12/12/89; Maintenance reference J. Hagewood memo Strickland - dated 01/09/90, Operations ~ Plant Labeling Program'
c. Draft procedure and interface Hagewood Co...yk:c q.e..e .t. Maintenance
f. Labeling procedure approved, and Hagewood 02/28/90 action plan for retagging. Mamtenance
  • Indicates change from previous month's report. IAPS2 38

c; .

12/31/ie b

-BRUNSWICK NUCLEAR PROJECT LEVEL 2.IAPf .- ..

IA P N O.- REF. ACTION ITEM -

RESPONSIBILITY TARGET DATE ' COMMEP(IS .

-D23 Integrate Preventative Maintenance Helme - -09/01/90

. Vibration Program with ASME Sec. XI IST Tech Support Program:

a. Approve and implement a Vibration ' Helme Complete ENP 2702.2 approved Monitoring Procedure. Tech Support 11/28/89.
b. Ensure all_ equipment is marked, Helme . 02/28/90-indicating points from which to Tech Support take readings.
c. Purchase data collector instrumentation Helme 02/28/90 to be used to collect the vibration Tech ".myyuni data.
d. Provide Real *Ilme Training to Auxiliary Helme 02/28/90
  • Training on 1st Shift l Operators on operation of data - Tech Support completed.

j a>llectors.

c. Develop u.'s.u..ce iralues and baselines Helme 05/31/90 l

to establish the initial points and Tech ".myymi determine the " alert" and " required acten" ranges. ,

I l f. After establishing mark points and Helme 08/31/90 ranges, revise ITs acrordingly. Tech Support l

l l

  • Indicates change from previous month's report. IAPS2

. 39 l

.- - ~ . , . . . . . ~ . _ < . . _ , ~ . . . . _ , . . _ .

- BRUNSWICK 1 NUCLEAR. PROJECT  :-- 112/31/s9,: ,' - - .

LEVEL 2 IAP .

. .=

IAP Ng REF. - ACTION ITEM RESPONSIBILITY TARGET DATE - COMMENTS .

D24 Impleraent Budgeting of Small ~ Helme Complete i . Engineering Prorcts. Tech S:spport i

l .

i

  • Indiates change from previous month's report. IAPS2 .

i 40 s

y ea T. g a  %  % 3ss . ,e-- p y e-_. 4 -sw-vyw- aug g--- w , fa-f m sy%-V WW & wa+bewm-v'rei-"e=M**e -WS--*WM*--W -YM'+N_'+4.-***H

BRUNSWICK NUCLEAR PROJECT 12/si/sst ; Y LEVEL 2 IAP l . -, ..

.a

. IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE COMMENTS .

i Harrell Complete i ' D25 Use Propect Management Approach in Planning / Execution of Outages. OMacM CRO 20 . a. Adoh a modified project management Harrell Complete approach to planning and executing OM&M ~

unit outages.

i

  • Indiates change from previous month's report. IAPS2 41

.Y

W .y ; -- ' ~ - =' - -m

-3 1

.CRUNSWICK NUCLEAR PROJECT n/31/C 4 LEVEL =2 IAP -

TAP NO. REF. ACTION ITEM RESPONSIBILITY - TARGET DATE COMMENTS .-

D26 CRO 18 Fonnalize Plant Work Schedule Adherence Harness - 02/28/9(P Contnt BSEP

a. Issue a pohcy statement that Harness , Complete * *Rs.b..w ICMM 896 estabhshes as a goal Maintenance BSEP . dated 12/14/89.

supervisors scheduling 80% of their .

manpower on the weekly schedule developed by the Site Work Force i

Control Group (SWFCG).

b. Establish a practice of holding Harness Cou.yL;J *Refetence PCMM 894103 -

accountable anyone who makes a BSEP dated 12/14/89.

decision to interrupt or postpone a

scheduled job.
c. Direct the SWICG to issue weekly to Hokier 02/28/9(P
  • SOP 2.41 meets the intent of Secten/ Unit Managers an annotated OM&M this action but is bemg revised copy of the previous week's schedule regarding fra,,.,..cy and destel-that shows for those scheduled jobs bution of reporting.

which were interrupted or not started:

reason for the decision, person who made decision, r_...:,a of manhours diverted to other work, and impact on i plant.

I i

! . l i

i

  • Indicates change from previous month's report. IAPS2

- 42

n .

=

.. = ..

l. 'BRUNSWICId NUCLEAR PROJECT 12/31/s9- --

L LEVEL 2 IAP-l '. .

IAP NO. REF. . ACTION TTEM RESPONSIBILITY TARGET DATE COMMENTS .

D27 CRO 10 Improve tracking / disposition of Helme 03/30/90 . PC has been CRO 11 temporary repairs / conditions to Tech Support obtained and software expedite elimination: is bemg ds.J@

a. Identify temporary conditxms that Heime Cou.yk;J "Ihe types of conditions which require tracking and disposition Tech Support are tenned as " temporary at BNP. conditions" have been identified.
b. Designate a unit manager to track each Harness Complete
  • type of temporary condition. BSEP
c. Establish a priority for closecut Helme 01/31/90 . "Ihe pnoritization of temporary .

conditions will be conducted

~

efforts through application of the Tech Support site. wide nuclear plant pnoritization through each Unit with system. Technical Support as the coordinator. Details will be supphed in BSP-37.

d. Assign responsibility for each item, Harness Complete' with completion dates assegned. BSEP
e. Track performance against targets: Helme 02/15/90 Pmgram development is report status raonthly to BNP Section/ Tech Lyycnt taking longer than anti-

' cipated, but will not Project ma s e,s..~.;, include assessment of schedule deviations / technical impact overall target date.

problems with corresponding corrective actums; assess the sagraficance of backlog quarterty;and adjust y knM accordingly.

f. Proceduralize program to track, Helme 03/30/90 ' 'BSP-37 is in draft form and is disposition and control temporary - Tech L yymt to be distributed through PNSC repairs. in January 1990 for revsew and comments.

'

  • Indicates change from previous month's report. LAPS 2 43

.-- .. . - -- , ,.-a. - . . - - . _ . - , --, . _ - . . . = - _ . = =_ _ - _- _ _ . - -- _ _ . -

4' - .'

BRUNSWICK NUCLEAR PROJECT . 12/31/ 4 $

1,.

~ -

LEVEL 2 IAP - '

. IAF NO. REF. . ACTION ITEM RESPONSIBILITY - TARGET DATE COMMENTS .

D27 g. Incorporate into apphcable BNP i . Helme 03/30/90 proadures: comerettee review / Tech Support approval of temporary conditions; prioritization of dose +uts; require-ment to develop detailed support for each extensum request requirement to develop detailed support for cach extension %4 and backlog _

. significance assessment.

t 4

i i

i

  • Indicates change from previous month's report. IAPS2 44 8

e - - - ~ , , - . ~ - ,+ws ,,e m --r s ,n -. ,e.r + ..-t .. .~~ ~,,r-s-, , + . , . , n.~,--. .w- , , ., , w-a ww--* .---m-..<..a v--w------e-. .

, BRUNSWICK NUCLEAR- PROJECT 12/31/89, i LEVEL 2 IAP '

,- .=

< IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE COMMENTS ..

l '- D28 Revise EOP's to Simplify and Match Blackmon - 12/31/90

( . BWROG Guidelines: Operations

a. Prepare PSTG. Sawtschenko Complete * *R ' .u.ce 08-37 (draft).

Operations

b. Prepare writer's guide. Sawtschenko Complete' ' Reference 01-28, rev.14, Operations dated 12/18/89.

.. c. Write procedures. Sawtschenko 04/30/90 Operations

~~

d. Preliminary verification. Sawtschenko 06/25/90 Operations
c. Preliminary validation Sawtschenko 06/25/90 Opera &ms
f. h w.pu .te changes. Sawtschenko 08/06/90 Operations
g. Final verification and validation. Se ; %,.ko 10/01/N Operations
h. Training. . Sawtschenko 10/22/90 l

D&mS

i. Follow-up training,if required. Su"C .ao 12/31/90 Operehis
j. Incorporate changes, approve. Sawtschenko 12/31/90 W
  • Indicates change from previous month's report. IAPS2
45. .

l

. . . . . -- .. , . - - . . , _ _ - - - . . _ , . . - , - . ~ . . . _ -__.-.._ ___ __m_ _ _ _ _ __ _ . . _ _ _ _ _ -

u  : BRUNSWICK NUCLEAR PROJECT 12/31/89L Y LEVEL 2 IAP .'  ;;

IAP NO. REF. - ACTION l'EM RESPONSIBILITY TARGET DATE COMMENTS -

D29 Implement NGG Guideline Re: Structure Hill 06/05/90 of CP&L ISI Programs, and Estabhshment NPS of 6-month information Exchanges:

a. Assign individual within Corporate Waldorf Complete

. Nuclear Technical Surycai Unit to NPS manage this task. -

b. Assign individual from designated Dept. Mgrs Complete
  • departments to partxipate and support BNP/HNP/RNP
  • his task: BNP, HNP, RNP, NED. NED
c. Assigned individuals meet to establish Assigned NPS 01/15/90 the desired ' basic rdiodor# Task Manager
of CP&L's ISI programs (responsibility I and organization structure).

i d. Summarize desned structure and identify Assigned NPS 02/30/90 l any inconsistenoes Ld_.., nuclear Task Manager

! project deper".ments with rep >mmendatens l as to final structure.

c. Obtain Senior Mag.e .; deosion on Hill, NPS 03/30/90 isu..e.ei.dations. Cutter, NSD Watson, NGG l
f. Draft NGGG and action steps for Assigned NPS 05/01/90 -

l implementation for each affected Task Manager and '

department. QW support p w a:

g. Transrmt Nuclear Generation Group Frazier 05/5/90-Guideline for approval. NPS
  • Indicates change from previous month's report. IAPS2 46 i-f .

., - . - -_ , _. a . , , _ _ . . - . . . -_. .. - . . . , , . , _ . _ _ . . , , . - - . _ - - _ . , - - . - _ . _ _

~ ~ ^ '

-u .

BRUNSWICK NUCLEAR PROJECT ~

12/31/ty;'Lc

- LEVEL 2 IAP -

- IAP NO. REF. ACTION ITEM RESPONSIBILITY TARGET DATE COMMENTS - -

D29 h. - Transmit action steps for approval. -11ill 05/05/90

, .- NPS

i. Approve Nuclear Generation Group D:signated 06/05/90 ~

Guideline. Dept. Mgrs &

Watson, NOG

j. Approve acten steps for implementing Desagnated .06/05/90 steps as. called for in Implementation Dept. Mgts &

guideline. Watson, NGG 2

  • Indicates change from prevous month's report. IAPS2

-47 w w. w g -+ *+~=.-am -

e -'yy w- e e e-% - - we- --en,y-g ,-

, e+ww--  : w g ee-.s - he. w or s' ,h es3 e as em e-- ww - -.-ww+ygi-=+- e -.

-++evi.e w w y,v-.g.

BRUNSWICK NUCL' EAR PROJEG 12/31/apf LEVEL 2 IAP

~

IAP NO. REF. ACTION ITEM RESPONSIBILTIY TARGET DATE COMMENTS -

D30 Implement Actions for Administrative Simpson 06/30/90 1 Cost Containment: C&A CRA 11 .a. Eliminate / consolidate financial .

Boyte 06/30/90 CRA 12 reports and improve accounting and CC&A CRA 15. financial reporting processea.

CRA 13 b. Evaluate and recommend cost Boyte M/30/90 containment methodologies. CC&A

, CRA 14 c. Eliminate / minimize performanm of finan- Sanpson Complete OA I ial functions within non-financial units. C&A i

. CRA 16 d. Identify and eliminate acmunting Boyte 06/30/90 process inefficenoes. CC&A CRA 26 e. Improve contracting practias. Gray 06/30/90.

CRA 27 M&G CRA 28 CRI29 CRA 31 CRA 17 f. Improve effectiveness of secretarial / Willetts 06/30/90 CRA 18 clerical support. Office Services CRA 19 g. Improve document amtrol yi.diws. Kesmodel 06/30/90 *A goal of reducmg distribution CRA 20 Records Mgmt of prowdures by 10% has been CRA 21 estabhshed.

CRA 22 CRE 28 h. Reevaluate the Equipment Database Jones

  • 03/31/90 CRE 29 System (EDBS) A.4e4 effort, C&A CRE 30 and modify direction as appropnate.

CRE 31

  • Indicates change from previous month's report. IAPS2 -

48

~

- . , _ .. . . . _ . _ . m._.._ .. _ .

.__- _ ___ _. . . ~

y m

+

f BRUNSWICK NUCLEAR PROJECT' 12/3i/89)'"

h L2 W~

'g, I.

IAP NO. REF. ACI1ON ITEM RESPONSIBHJTY TARGET DATE - COMMENTS -.

, D31 Consolidate, Update, Simplify BNP S:..p. 09/30/90 Procedures: CatA i

a. Identify and document all site Kesmodel 02/15/9(P procedures, including purpose, Records Mgmt
i. content, administrator, and distribution.
b. Identify and evaluate relevant Kesmodel 02/15/9(P administrative processes. Reands Mgmt
c. Identify regulatory bases for Kesmodel 03/31/90' pro dures. Records Mgmt
d. Develop evaluation schedule. Kesmodel 0

' 1/31/9(P ..

, Records Mgmt
e. . Conduct evaluations and update, Kesmodel 09/3'0/90 amsohdate, simphfy, and eliminate Records Mgmt

, Pnxedures.

i i

t

  • Indicates change inn previous month's report. IAPS2.

49-

. ,-__ _ __-__.____-___.__ .____=_ _ _ _ _ _ _ = _ _ _ - .__ _ _ _ _ . _ - _ _ _ _ - . - . _

BRUNSWICK NUCLEAR PROJECT 12/31/ e> b

- LEVEL- 2 IAP-IAP NO. REF. ACI1ON TrEM RESPONSIBILITY TARGET DATE COMMENTS .

El Define, Track Operational and Manugement Starkey Cou.pl6(

Performance; Document Goals to be Used BNP to Manage Performance:

a. Develop preliminary department goals Starkey Complete for 1990 - 1994. BNP-I b. Direct Sectum Managers to develop Starkey Complete Memo from R. B.

secten goals for 1990 - 1994 which BNP '

Starkey, Jr. dated support department goals. 11/29/89.

c. Direct Secten Managers to ensure Starkey Cou.4;c that goals are established for all BNP

. levels of den organizatens which support their section goals.

l j d. Review section goals. Starkey Complete * 'Section goals .maJ by -

1 BNP 12/31/89.

l c. Revise department, section, and Starkey Complete * "No revisions were deerwl i lower level goals as nemssary. BNP newssary.

i l

l l

I

  • Indicates change from prevous rnonth's report. IAPS2 50

- -_.-._..,_ u _. __..,___...c. . . _ _ ___ _ .__ _ _ _ _ _

'^

" ' .'T. ,_

z:

BRUNSWICK NUCLEAR PROIECT se ~ 12/3OB9 ,M LEVEL 2 IAP -

IAP NO. REF. ACTION ITEM RESPONSIBILITY . TARGET DATE COMMENTS -

E2 CRO 1 Ensure improvement Programs Are Starkey 02/28/90 CRO 2 Implemented / Monitored: BNP CRA 7 CRA 9 a. Identify programs / initiatives Starkey Co..,A;C Wtter dated 01/03/90 from _

BNP' W. W. Sanpson documented ~

~

CRA 48 requiring complet;on at Brunswick. .

CRE 18 -

that this activity was .

u,..,A J on 12/18/89.

CRE 19 b. Designate a propet manager for Starkey 01/15/90 CRO 12 mch project. - BNP CRO 21 CRO 22 c. Establish a completion plan for each Starkey 02/28/90 CRO 23 project. BNP

d. Establish a tracking mechanism Starkey 02/28/90 for each project. BNP I

h

  • Indicates change fmm previous month's report. 1APS2 51-1 i

g r ~.,5- --

., - e ,c, , , o.w . .....,._.,.__2_ *_.~,, _. , -,g,, _m__ ,,# , ,_ . _ . ,. ____ _, .u ._m s- - - _ _ _ . . _,,_ .c ..w._,m . , _ _ , _ _ , ______.#.s.. _._,_,.y._.%m_m..,._,.m.,

P

~*~

BRUNSWICK NUCLEAR PROJECT . n/31/e9 .

LEVEL 2 IAP IAP NO. REF. ACTION ITEM RESPONSIBILITY TARG'ET DATE COMMENTS .

E3 Revise IDR Program, Emphasizing Effective ' CTSullivan 03/30/90 Control Room Iog Entnes: NTU'

a. Revise LOR-SIM-GEN 01 to add emphasis Sosier Complete to log-keeping pm BTU
b. Deliver training during Phase I Sosier 03/30/90 Trammg schedule has LOR 1990. BTU been finalized with LOR Phase I from 02/19 - 3/30.~

i I

l l

l

~

l

  • Indicates change from prevous month's report. IAPS2 52 l

. - m- . . --. ,- _ _ , _ . . _ _ _ _

..; y BRUNSWICK NUCLEAR: PROJECT n/31189.'-s LEVEL 2 IAP -

1; TARGET DATE

~

IAP Ng REF. ACTION ITEM RESPONSIBILITY . COMMENT _S .

E4.1 Issue Integrated Audit / Surveillance L Banks 12/31/90 Plan: , CQAD

a. IdenOfy BNP engmeering activities. Whitehead / Jones Complete CQAD.

. b. ' Define QA Auditing Unit and BNP Whitehead / Jones Complete

  • QA/QC Unit audit / surveillance CQAD responsibilities for 1990.

^

c. Implement BNP engineering audit / Whitehead / Jones 01/31/90 sunreillance plan. CQAD
d. Evaluate results to determine if Whitehead / Jones 12/31/90 increased and more effective CQAD overview has been actneved.
  • Indkates change from previous month's report. IAPS2

-53

c _

. . , _ p m we

  • ' ~ -
-m x .
c. .- . . y- .

J12/31/q9[D

~

W .

- f BRUNSWICK NUCLEAR! PROJECT: ~

LEVEL 2 IAP -

1

,IAP NO.  : REF. ACTION ITEM l ' RESPONSIBILITY . TARGET DATE . COMMENTS  :.

~

' E4.2 Develop Corporate QA Performance . Bank- 12/31/90:

based Overview Plan:- _.CQAD

a. . First draft developed. Whitelead/ Rose / . Complete .

Dorman/Baur

.CQAD . .

b. Issue draft for comments.- - Whitehead / Rose / . Complete '

i_

-. Dorman/Baur..

CQAD l - c. Resolve comments and make Whitehead / Rose / 07/31/90-l .- presentation to CQAD management. Dorman/Baur CQAD' l

~ d. ' Resolve mmments and obtain .Whitchead/ Rose / 10/31/90 necessary approvals. Dorman/Baur CQAD

. e. Implement plan. Whitehead / Rose / 12/31/90 Dorman/Baur CQAD i

l

  • Indicates change from previous month's report. IAPS2 54 5___.______._____._____.________ ___:___________t._____.__ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . = _ _ _ _ - _ _

___a__..-.___-._...__2-_ ._ _ . _ ___ _ __m . _ _ . -__________1__.____:.2_1.1 m-- mo. _u_m.m _m.m.. . __ <._c . _. . ewb&

y

.m _- .,

x :p ,;

~

>y

g. _

12/31/s v,f ~., "

BRUNSWICK = NUCLEA.R. PROJECT!

~

LEVEL 2 IAP . ..

'- IAP NO. ~ REF. ACTION ITEM RESPONSIBILITY . TARGET DATE ' ~ COMMENTS  :<.

E43 Adjust Audit Improvement Plans in Banks 02/28/90.

Progress to Addmss DET

Conclusions:

i CQAD'

a. Identify adjustments required.' Whitehead Complete CQAD
b. Incorporate into ongoing improve- Whitehead 02/28/90-ment plans; create new improve- .CQAD' ment plans as necessary.

l '

l l

l i w

p.

l l .

  • Indicates change from previous month's report. IAPS2 55 ~ ~

t-- -.. ,.,;- ... ,.. =-.~.,.

, , , ~ = _ _ __ -_ . _ . _ _ . _ .a .

. . ~ . ,_ _ ~ _ . _ _ . . _ _ - _ _ _ _ _ . +

. ~.

!!L e f y

~

~

~ ~ -

12/3Dsp!We

~ BRUNSWICK NUCLEAR PROJECT LEVEL 2'IAP: -

RESPONSIBILITY . TARGET DATE - - COMMEhrTS ACTION ITEM

~

. I AP NO. ' REF.

-Banks 12/31/90 l ES ' Analyze Methods of Independent Assessments for Performance Evaluation: CQAD.

- Eury . Complete

a. Select members for Project Quality .

Team to analyze nuclear evaluation - .EVP and ovssight functions.

Ga't her data on industry evaluations . Bowles/PQT - 03/01/90'

b. ,

and programs to incorporate best CQAD practices into Company programs.

Identify desired changes in nuclear Bowles/PQT '06/01/90 c.

evaluation and oversight functions CQAD and attendant organizational g structures.

Eury. 12/31/90

d. Implement desired changes in nuclear evaluation and oversight functions EVP~

and attendant organizational structures.

IAPS2 .

  • Indiates change from previous month's report. .

56

  • ^ ' * '

- ___m_m_

y J.

=

12/31/a9Tia

~

- BRUNSWICK NUCLEAR PROJECTi .

y _ t -.LEVEU 2 IAPL w . #:

s... .:

IAP NO. REF. ACrlON ITEM -- RESPONSIBILITY .. TARGET DATE COMMEffrS -

E6 Revise ITs for Proper Evaluation'of Blackmon.- 1 Complete

Service Water Pump Performance: - Operations.

~

l a. Revise SW Pump ITs 11T-24.1-1 . Matny: Complete - ~ "Revisens approved 11/24/89.

. and 2PT-24.1-2, based on Technical Operadons ,

Support mark-up.

l q _, a l

l i

l t

v i

  • Indicates change from previous month's report. IAPS2 57 .

f I.... ., . _ ._s .,.....a . . . . . . . . . . . - . . . . . . . _ _ _ . . , . _ .. _ - .

m.. ~+-  ;--

.:. 4 w .

~

12/31/89 ??

BRUNSWICK NUCLEAR PROJECT

~

-z LEVEL'2 IAP -r

- u. 3 =:

COMMENTS -:

. RESPONSIBILITY TARGET DATE -

IAP NO. ~REF. . ACI1ON ITEM

- Watson 06/30/90 A Management Team is in -

F1 . CRA 43 Implement Career Development and Job -- place and has begun Rotation Process:

NGG CRA 44 - A i'+.. cat of this program.

CRA 45 ~

' Watson -06/30/90 CRA 46 : a. Modify commitments made to Auxiliary -

NGG CRC 4 Operators.

CRC 10 - 06/3b/90 Develop a job rotation and management Watson CRC 14 b.

devebpment program.D NGG CRC 26 CRC 29 06/30/90 Incorporate use of employee involve- ' Goodnight -

CRC 30 - c. y-ment techniques into supervisory .Emp. Relations

' CRC 31 and managerial skills training. Quarles CRO 8

. "IQ Mgmt CRO 9 Review nuclear supervisory. training - Watson 06/30/90 d.

programs to determine adequacy and NGG effectiveness in building management skills. '

Harness 06/30/90

e. Implement a senior operations (SOS and SF) personnel shift IEEP

~

rotation program at Brunswick.

4 LIAPS2 ~

- Indicates change from previous month's report. '

58

- - - - . _ _ _ Ilu

.m m se .

~ --

-- ,------- - = w .=-- . - - - 7- _ m._ _ m,g, 3~.

~~ x.,

-' ' < 'a ,4 r, - - -

7Ug: . .

cf^ ~' E12/31/q9T^6

~

BRUNSWICK NUCLEAR PROJECT! ,

. LEVEI; 2 IAP: w .~~'

4 .

.,u

_.. s .: ... _

IAP NO. REF. ACTION ITEM .

' RESPOFSIBILITY TARGET DATE ' COMMENTS .; . J F2 Incorporate Quality, Safety and Cost ^ Starkey ' - 06/30/90- ~

Effectiveness Criteria in Perfonnance~ BNP~

Appraisal Program:

a. EvaluaM the proposed CP&L Simpson 01/31/90*
  • Evaluation is underway.but ;

' not amp ;c.

performance appraisal program for C&A' ~

appliability to Brunswick. -

b. Develop criteria for appraisal Warden ' 02/28/90*' -* Draft' criteria are i.aryed -

of leadership skills. Maintenance but not finalized. ~

c. Identify other criteria for incor- ' Simpson -01/31/90

. poration into appraisal program. C&A

d. , Develop performance appraisal : Simpson 02/28/90 training program for Brunswick . .C&A
e. Conduct training of Brunswick -

Simpson 04/30/90 managers and supervisors. C&A ,

f. Revise position descriptions of . Simpson 06/30/90 all Brunswick pow. .cl. C&A w
  • Indicates change from previous month's report. IAPS2

. 59-

. . - - - ,-~ w _ - . - - -, . . . . . - . . . . , __ _ __

- _ _ . = .

y ;;- -

~m

?

.'.~' '

-2.
%:: ~ : ^; ,

2 a;r o

=. ^'

w _ .- ,

3 . ~. . .

z-  ! BRUNSWICK NUCLEAR PROJECT? _ c 112/31/g3 % ~

LEVEI?2 IAP; ,

Ly & lr RESPONSIBILITY - TARGET DATE : COMMENTS '*

F IAP NO. 'REE JACTION ITEM f

. F3 CRA 8 Review Awards and incentives Watson ' ~ 12/31/90 CRC 3 Possibilities and Develop Implementation . NGC -

CRC 8 Plan for Enhancements: '

CRC 9 .

CRC 16 ' a. Consider alternate rewards techniques ' '

~ Watson 12/31/90 CRC 19 that share cost savmgs with ,

NGG CRC 20 ' employees.

CRC 21 .

~ CRC 22 b. ' Consider recognition programs that - Watson 12/31/90 NGG CRC 23 focus on group innovations.

CRC 24 CRC 25' c. Ensure that the psfurmance Watson 12/31/90 CRC 27 appraisal system and the merit pay NGG -

I system are appropriately linked.

d. Consider methods for non-financial Watson 12/31/90 recognition. NGG .
e. - Identify training, as required, for Watson 12/31/90 ,

implementation of new rewards and . PK;G incentives programs.

e

  • Indicates change from previous month's report. -

.IAPS2 ~

60- ,

1

' e

.w _ . _ . _ . .. , . -, , . , . . _ , , _ , . _ . _ . . . _ - .

. -. _ _ = , _ _ , , _ . _ . .

= -g ., f.Y  ;. _ f '; #

s2/3us9l T

- BRUNSWICK.NUCLEARLPROJECT M tpygl 2-IAPT d

.. r ,

IAP NO. REF. - ACTION ITEM - RESPONSIBILITY - TARGET DATE COMMENTS  ; .-

F4 CRA 4 - Provide fonnal Training in Business ~ Simpson . 03/31/90-CRA 30 Fundamentals: C&A

a. 2 Develop budgeting and business planning ~

IE wis Complete *

. course objectives and curriculum. . B&BP

~

b. ' identify perso..r.d to be trained in - Lewis Complete
  • budgeting and business planning and ' BNP B&BP

. schedule classes. .

c. Conduct budgeting and business Iewis 1 03/31/90 planning classes. . B&BP
d. Develop contract administration Gray ' Complete *
  • Memo BSEP/89-1103,12/13/89, course objectives and curriculurr M&CS ' from C. H. Gray to Plant ~

Management Group.

e. Identify personnel to be trained Gray Cuii p.,..J in contract administration M&CS .

classes.

f. Conduct contract administration Gray. 03/31/90 training. ' M&CS
  • Indicates change from previous month's mport. IAPS2 ~* ~

. 61 J.sw _ m .a .-a , ,_eei _o A.n,.*inei -.-. .u4.A.-_-amma__._.Am w._m__i -..-r3 ---_s.,{.- _ndw

~-

n ~ .

> ; 9; ~g:yg

m. .

~

+ BRUNSWICK NUCLEAR PROJECT n/3Qs9 ^

Oys LEVEL 2 IAP-- 7

,, :y IAP NO. REF. . ACTION ITEM RESPONSIBILITY- - TARGET DATE COMMENTS  :* u G1 . CRC 2' Implement Actions to Resolve People Issues, . Simpson 02/28/90- -

. CRC 6 ' Including an Employee Suggestion Systent ' ~

C&A CRC 7 CRC 13 a. . Establish a system for employees to 'Simpson 02/28/90 make suggestions to management. C&A .

b. Provide for effective follow-up 0;..p - 02/28/90 - -

by management to suggestions." C&A

c. Ensure that cost-effectiveness is :Simpson - 02/28/90 the key focus of the suggesten C&AJ system.
  • Indicates change from previous month's report. .

IAPS2 g

n .-~

.~

_ _.+_ - . , -, - _ . , . _ . . . , , . . . . , . ,

, ,  ;,,_,, ___l_

i

v7 1

y , _

q-

=-

.s :gsg gg w ,.

. w- .

1 BRUNSWICK-NUCLEAR PROJECT i .

112/31/B9 h ,g

" LEVEL'2 IAP

. = _

r

-j 3 '- '.'s p IAP NO. REF. ACTION ITEM RESPONSIBILITY - TARGET DATE COMMENTS -.- .

8 G2 CRA 47 Re-emphasize and Encourage Support of '

' Simpson; i 03/31/.90, CRA 48 1Q Process- L C&A~

a. Evaluate status of management "IQ ' Core 01/31/90

- training and development needs. .C&A CRA 49 b. J Develop communication program for Cove 03/31/90' CRC 15 middle management, reemphasizing - C&A importance of the Total Quality program. ,

f 1

~

~

  • Indicates change from prenous month's report. . IAPS2 _

.g._

1.4f , . . . . . . - p-e-,s . i W6e u ,>w..y -ww.-. =,=emeg e-. ..geg, g g .yv-e -ap, ys r.. ,.,..yn, e .-w + =+9 = -3 yast ,*y_ mwwee y _ _ __ ,,,n _ ._ __ _ g

,~m

. w Q ;Q;

y 3
~ ,

-12/31/g9 h [of 1 BRUNSWICK NUCLEAR PROJECT

~

- P LEVEL 2 IAP- . x

,.. , w,

^

3 --

COMMENTS Y RESPONSIBILITY .TAl(GET DATE -

IAP NO. REF.-- ACTION ITEM Blackmon 12/30/90 _- '

C3 'CRO 7 - Improve' Organizational and Individual ._f

- Ownership Commitments, Including '  ; Operations

~

Procedural Adherence:

Stnckland ~ Cumpk:e a.- Survey operators' attitudes.

Operations Stnckland Complete

b. Initiate contract request for Operations pmcedure writers.

Blackmon Cornplete

c. Appove funds and contract for

' Operations - ,

procedure writers.

Strickland . 02/01/90

d. Organize review and schedule 01-28 backlog reduction. Operations Sinciland 06/30/90.
e. Monitor backlog reducten.

Operations Strickland 06/30/90

f. Perform second operator survey.

Operations Stnckland 07/30/90

g. Compare results of survey and Operations provide recommmdations.

Stnckland 12/30/90

h. Complete reduction of backlog.

Operatioris IAPS2

  • Indicates change from previous month's report.

64

__- ill