Forwards Final Technical Rept, Edwin I Hatch Nuclear Plant Unit 2 Reactor Containment Bldg 1989 Integrated Leakage Rate Test for Fall 1989 Maint/Refueling Outage,Per IE Notice 85-071
ML20006D748
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/06/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006D751 List:
References
HL-941, IEIN-85-071, IEIN-85-71, NUDOCS 9002150020
Download: ML20006D748 (2)


Text

- _

. ., Gsma e hw Cmommy 333 Pp1~ug Acue . .+ .

,e Awn. Gemaa 39339

    • bepW* 434 f 26 3195 Maa og Ax90%

43tavt m: 3.s Cenw Psh,w )

Ns: Owe 03,1?95 ,

B enny.am Akcea 35?O1 J in ep % ne POLfu e $561 i

, , s vm j W. G. HMrston, til sm va e m u." HL-941 l oxuoma" 000163 February 6, 1990 i U.S. Nuclear Regulatory Commission  ;

ATTN: Document Control Desk Washington, D.C. 20555 -

NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I HATCH NUCLEAR PLANT UNIT 2  :

REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST REPORT - HATCH UNIT 2 i FALL 1989 MAINTENANCE / REFUELING OUTAGE i Gentlemen:

Pursuant to the requirements of 10 CFR 50, Appendix J, Section V.B.1, Georgia Power Company hereby submits a summary technical report entitled

" Reactor Containment Building 1989 Integrated Leak Rate Test" for the "as left" integrated leak rate test which was conducted at Plant Hatch Unit 2 during the Fall 1989 maintenance / refueling ouiage. Section 2 of the i enclosed report provides a summary of the test results. The as-left

' leakage rate (95% upper confidence level) was 0.8 weight percent per day, .

which is below the acceptance criteria of 0.9 weight percent per day (75%  ;

of the allowable leakage limit).

Included in Section 2 of the report is information on the reactor containment building "as found" condition, as requested in NRC I&E Notice 85-71, " Containment Integrated Leak Rate Tests", issued on August 22, 1985.

The upper confidence level as-found condition was less than the allowable leakage limit.

Five copies of the report are enclosed for your convenience.

If you have any questions in this regard, please contact this office at any time.

Sincerely, gy.}h W. G. Hairston, III GKM/eb 1 Enclosure i ,

c:- (See next page.)

//0/7 i8N'*R88ER8888%

qg

.. . 0  :

(3colgial\)n'er J kJ ,

U.S. Nuclear Regulatory Commission

, February 6, 1990 Page Two t

c: Georaia Power Comoany Mr. H. C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch GO-NORMS U.S. Nuclear Reaulatory Commission. Washinoton. D.C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion II Mr. S. D. Ebneter, Regional Administrator Mr. J. E. Menning, Senior Resident Inspector - Hatch 1