ML20006A341

From kanterella
Jump to navigation Jump to search
Forwards Rev 16 to EPIP 9.2, Radiological Dose Evaluation to Be Inserted in EPIP Manual
ML20006A341
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/16/1990
From: Gleason H
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19310C635 List:
References
NUDOCS 9001260143
Download: ML20006A341 (7)


Text

m- - . - . - - . . . . . . . . . . . . . , , . . . . . . . . . - . .

q J:nuary- 16, 1990

'U.S. Nuclear' Regulatory Commission

. Document Control Desk Washington, DC 20555 POINT BEACH NUCLEAR PLANT-EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIPs)

The following revised procedure is attached and should be inserted into your l EP1P manual according to instructions provided. -Please-destroy the revision removed from your manual.

EPIP 9.2:- " Radiological Dose Evaluation," Revision'16, dated 01-16-90.

( The following forms are attached and should be inserted into your EPIP manual, y according to instructions provided. Please~ destroy the revisions removed-from i your manual.

1. EPIP-6.6c: " Assembly Area Designation," dated 01-90.

(Insert behind EPIP 6.6.)

2. EPIP-14: " Event Notification Worksheet,". dated 01-90.

(Insert behind EPIP 2.2.)

l

3. EPIP-23: "Offsite Agency Emergency Call List," dated 01-90. I (Insert behind Call List Tab.)
4. EPIP-26: "011 and Hazardous Material Spill Call List," dated 01-90.

(Insert behind Call List Tab.) -j Also attached is a revised listing of the Table of Contents.and Table of EPIP' forms to be inserted in your manual. Please destroy-the old revisions.

-I

/s/ . . Gleason  !

i dms l

}

Attachments l

t 1 FOR INFORMATION ONLY 9001260143 90011e POR

.F ADOCK 03000266 PDC

-. ,~ .- .

l' q 4 I 01-16-90

,<~~  ;

f  !

\

EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS Revision 'Date ,,

1.0 INITIAL RESPONSE, CLASSIFICATION AND IMMEDIATE ,

ACTIONS

{

1.1 Plant Operations Manager Initial Response . . . . . 10 10-31-89 1.1.1 Plant Operations Manager - Radiological .

Release Evaluation . . . . . . .. . .. 1- 10-31-89' 1.1.2 Plant Operations Manager - General Emergency - Protective Actions . . . . . 0 04-14-89 1.2 Event Classification . . . ... . . . . .. . . 19 .04-28-88 1.3 . Emergency Event - Immediate Actions . . . ... . 16 .09-15-89 2.0 OFFSITE NOTIFICATIONS 2.1 State & County Agency Notification . . .. . .. . 5 09-15-89; 2.2 NRC Notification ....... . . . . . . .. .. li 04-28-88 3.0 PLANT AND COMPANY PERSONNEL NOTIFICATIONS 3.1 Emergency Event - Plant & Company Personnel .

l t Notification . . . . . . . . . . . . . . . . .. =7- 09-15-89 3.2 Paging System Operation . . . . . . . .

. .. . . 10 07-29 '

3.3 Notification & Respons for Headquarters . . .

Support Personnel . . . . . . . . . . . . . . .

11 02-03-88 i 3.4 Public Information - Notification & Immediate-Fesponse ..... . . .... ... . . . . .. 8 09-15-89 4.0 EMERGENCY RESPONSE FACILITY ACTIVATION' 4.1 Technical Support Center Activation . . ... . . . 14. 10-31-89 4.2 Operations Support Center-Activation and Operation . . . . . . . . . . . . . . . . . . . . . 4 10-31-89 4.3 Emergency Operations Facility Activation . . . . .

9 10-31-89 ,

5.0 EXPOSURE GUIDELINES AND RADI0 IODINE BLOCKING c l

l 5.1 . Personnel Exposure Guidelines . . . . . .. . . . . 5- 02-03-88 5.2 Radioiodine Blocking & Thyroid Erposure-  !

l Accounting ...... .. . . .. . .. . . . . 4 02-03-88 l

i s  ;

l b .

I

- e-  !

Pag 2 2 of 4 Revision Date  !

}

N 6.0 EVACUATION AND ACCOUNTABILITY l-6.1 Limited Plant Evacuation ............. 6 10-31-89 6.2 Plant Evacuation To Onsite Assembly Areas ... . . . 10 10-31-89 ,

6.3 Plant &. Exclusion Area Evacuation To Offsite Assembly Areas .-,

....... . . . . . . . 7 09-15-89 6.4 EVACUATION OF EMERGENCY RESPONSE FACILITIES 6.4.3 Emergency. Operations Facility Evacuation . 4 09-15-89 6.4.4 Offsite Health Physics Facility (OSHPF)

Evacuation . . . . ........... 1 02-03-88

6.5 Energy Information Center Evacuation ....... 5 02-03-88 6.6 Personnel Assembly & Accountability . . . . . . . . 9 02-03-88 6.7 Post-Emergency Release of Personnel from the Plant Site. .. ................. 0 02-17-89 7.0 HEALTH PHYSICS RESPONSE  ;

7.1 Health Physics Notification.and Response . . . .. 0 09-15-89 l 7.1.1  : Chemistry and Health Physics On-Site

Notification and Response . . . . . . 10 (CANCELED)

Qj t 7.1.2 (Contents moved to EPIP 7.1 & 8.1)

Chemistry and Health Physics offsite Notification and Response ....... 5 (CANCELED)  ?

(Contents moved to EPIP 7.1 & 8.1) 7.1.3 Health Physics Actions by on-Shift HP Technologist Prior to Arrival of Additional Health Physics Support . ........ 7 10-31-89 7.2 Health Physics Facility Activation 7.2.1 Activation of the Offsite Health Physics Facility at Site Boundary Control Center 10 10-31-89 7.2.2 Activation of. Health' Physics Facilities at Technical Support Center / Operations Support Center . . . . . . . .......... 10 10-31-89 7.2.4 Health Physics Communications . . . . . . 6 (CANCELED) s s

e v' l

,- < m- . - - me

-)

  • Page 3 of 4' -;

p Revision Date-

,7 .

[

7.3 Radiological Survey, Sampling & Analysis ]

l .

l l

L 7.3.1 Airborne Sampling & Direct Dose-Rate .

Survey Guidelines . . . . . ... . . . 11 08-15-88 7.3.2 Post-Accident Sampling & Analysis'of *

'Potentially High Level Reactor Coolant . 21 '(CANCELED)

(Renumbered to EPIP.8.4.1) j 7.3.3 Post-Accident Sampling of Containment. ..

Atmosphere . . . . . . . . .-. . . . . 20 '(CANCELED)

(Renumbered to EPIP 8.4.2)

Movement of Required Chemistry Equipment &

7. 3.4 - ~

Materials to the Technical Support Center.~ ..

Counting Room & Mini-Laboratory. . . . . 4 -(CANCELED)

(Renumbered to EPIP 8.3) 7.3.5 Post-Accident Sampling of the Auxiliary [

Building & Drumming. Area Vent Stacks Using .

the Isokinetic Stack Sampling System . . 4 02-03-88 l 7.3.6 Emergency Containment Sump "A" Sampling . 0 (CANCELED) l -

(Renumbered to EPIP 8.4.3) l l

7.4 Emergency Equipment l

7.4.3.1 Use of Canberra Model 3100 Series 30' Multichannel Analyzer to Determine Airborne Iodine Activities . . . . . . . (CANCELED)  ;

tO' 8.0 CHEMISTRY RESPONSE I

8.1 Chemistry Notification and Response . . .. .. . . 0 09-15-89 8.2 Activation of Chemistry Facilities at Technical Support Center / Operations Support Center. . . . . 0 .

10-31-89 8.3 Movement of Chemistry Equipment & Materials to the Technical Support Center Counting Room &

Mini-Laboratory . . . . . . . . . . . . . . . . . 0 09-15-89 I

l 8.4 Sampling & Analysis i

8.4.1 Post-Accident Sampling and Analysis of .

Potentially High Level Reactor Coolant . 'O 09-15-89' 8.4.2 Post-Accident Sampling of Containment .

s Atmosphere . . .. . . . . . .. .. . . 1 11-13-89 8.4.3 Emergency Containment Sump "A" Sampling. . 0 09-15-89 ,.

8.4.4 Estimating Radioiodine Air Concentrations. 0 09-15-89 ,

9.0 EVALUATION OF OFFSITE CONSEQUENCES 9.1 Emergency Off-Site Dose Estimations . . . . . . . . 11 (CANCELED) 9.2 Radiological Dose Evaluation . . . . .. .. . . 16 01-16-90: l 9.3 Protective Action Evaluation . . . . ... . . . . 13 02-03-88 ,

O i

,, , - - . - - . . +w- , . , , * #-

a .j s Paga 4 of 4 Revision Date

' fh 10.0 DAMAGE ASSESSMENT 10.1 Emergency Reentry . . . . . . . . . . . . . . . . . 9 02-17-89 10.2 Core Damage Estimation .............. 9 02-03-88 11.0 SEARCH AND RESCUE & MEDICAL ASSISTANCE ,

11.1 Search & Rescue . . . . .............10 02-17-89 e 11.2 Injured Person's.Immediate Care . . . .. . . , , . . 5 02-03-88 11.3 Off-site Medical Assistance . . .. . . . . .... 9~ 10-31-89 12.0 RECOVERY PLANNING 12.1 Event Termination & Recovery Classification . . . . 0 02-17-89

12.2 Recovery - Organization and Responsibility . ... 3 02-17-89 EPIP APPENDIX A Appendix A, Emergency Plan - Abbreviations & Acronyms . . 2 10-31-89 Appendix B, Radio Operation . . . . . . . . . . . ... . . 0 10-31-89:

^

Appendix C, Use of Emergency Plan Telephones. . . . . . . 0 10-31-89 j

rs g

[ s_/ ,

l-i r

?

l \

l

/'~'T l

\~ / 1 1

4 01-16-90 TABLE OF EPIP FORMS EPIP EPIP Forn Title

  • Procedure

-04 Status Report on Plant Systems & Controls for Affected Unit (09-89) 4.1

-4.la Technical Support Center Activation Checklist (10-89) 4.1

-4.2a Operations Support Center Activation Checklist (10-89) 4.2

-4.2b Team Status (02-88) 4.2

-4.3a Emergency Operations Facility Activation Checklist (10-89) 4.3

-05 Release Point Monitors (09-89) ~4.1

-06 RMS Status, Area Type Monitors (09-89) 4.1

-6.6a Accountability Short Form (02-88) 6.6

-6.6b Assembly Area Roster (02-88) 6.6

-6.6c Assembly Area' Designations (01-90) 6.6 l

-6.7a Event Involvement Sununary (02-89) 6.7

-6.7b Emergency Event Information Sheet (02-89) 6.7

-6.7c Personnel " Dismissal-From-Site" Briefing Checklist (02-89) 6.7

-07 For X/Q Determination (03-85) (CANCELED)

(now a worksheet in EPIP 9.2)

-07 RMS Status (Process Monitors) (09-89) 4.1

-7.la Health Physics' Emergency Plant Personnel Assignments (09-89) 7.1

-7.lb Emergency Plan Equipment Requiring Transport from the Health Physics Station (09-89) . . 7 .1 -

-7.2.la Radiation Control Team Equipment Inventory & Functional Test Checklist (09-89) 7.2.1

-7.2.lb Offsite Sampling Team Equipment Inventory & Functional Test checklist (02-89) 7.2.1

-7.2.1c Shuttle Team Equipment Inventory & Functional Test-Checklist (12-88).. -

7.2.1

-7.2.1d offsite Health Physics Facility, Offsite Health ~

Physics Director Checklist (09-89) . 7.2.1

-7.2.le Emergency Plan Dosimetry Device Issue Record and Esposure Log (10-89) 7.2.1

-7.3.la Emergency Plan Airborne Radiation Survey Record (08-88) 7.3.1

-7.3.lb Emergency Plan Survey Record (08-88) 7.3.1

-7.3.lc Dose Factor Calculations For Specific Noble Gas Analysis Results (08-88) 7.3.1

-08 Estimated Whole Body & Thyroid Projected Doses (03-85) '(CANCELED)

(now a worksheet in EPIP.9.2) 1

-8.4.la Reactor Coolant Post Accident Sampling Analysis Report (09-89) 8.4.1

-8.4.2a Containment Atmosphere Post-Accident Sampling Analysis Report (09-89) 8.4.2

Page 2 +

[ EPIP EPIP G/ Fgr_m Title Procedure

-09 Estimated Whole Body Dose calculation Worksheet for Specific Noble Gas Releases (03-85) (CANCELED)

(now a worksheet in EPIP 9.2)

-9.2a Estimated Population Dose (02-88) .

9.2

-9.2b Summary of Radiological Dose Evaluation Calculations 9.2 ,

(02-88) i

-10 Estimated Ground Deposition Calculation Worksheet for Particulate Radionuclide Releases (03-85) (CANCELED)

(now a worksheet in EPIP 9.2)

-10.la Search & Rescue / Emergency. Reentry Checklist (02-89) 10.1 1

-10.lb Search & Rescue / Emergency Reentry Team Dispatch  !

Checklist (02-89) 10.1 1

-11.la Search & Rescue / Emergency Reentry Checklist (02-89) 11.1

-11 lb Search & Rescue / Emergency Reentry Team Dispatch I checklist (02-89) 11.1

-11.3a Checklist,.Off-site Medical Assistance (09-89)- 11.3

-11.3b Checklist Ambulance Assistance, Health Physics. .

Response-(02-89) 11.3 l

- 11 ~. 3 c checklist NFAR - HP Response (09-89) 11.3 12 Incident Report Form (04-89) 2.1 13 Status Update Form (02-89) 2.1

..' 0

-14 NRC Event Notification Worksheet (01-90) 2.2 .l l

-22 Plant Personnel Emergency Call List (11-89) Call List Tab

-23 Offsite Agency Emergency Call List (01-90) Call List Tab l

-24 Emergency Response Facility Telephone Directory (09-89) Call' List Tab

-25 Wisconsin Electric Headquarters Support Personnel ,

Emergency Call List {09-89) Call List Tab

-26 j 011 and Hazardous Material Spill Call List (01-90) Call List Tab l

-30 Reactor Coolant Post Accident Sampling Analysis Report (02-89) (Renumbered to EPIP-8.4.la) (CANCELED)

-31 Containment Atmosphere Post-Accident Sampling Analysis Report (02-89).(Renumbered to EPIP-8.4.2a) (CANCELED)

-33 Estimate of Core Damage worksheet (08-87) (CANCELED)

-34 Calculation of XE-133 Equivalent Release Rates (08-87) (CANCELED)

-35 Dose calculations (09-85) (CANCELED) l l

l

(

t

\

i