Requests Delay in Response to IE Insp Rept 50-423/81-02 Until 810701
ML20005A479
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/12/1981
From: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20005A476 List:
References
B10210, NUDOCS 8106300377
Download: ML20005A479 (1)


Text

( -

- NORTHEAST UTILITIES J l E UEU7eUET bNFoA CONNECTICUT 06101 g "';O,",*J,"g" ""*' (2an omee11 L L ia =n't".l "O=~

May 12, 1981 Docket No. 50-423 B10210 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas T. Martin, Acting Director Divi' ion of Engineering and Technical Inspection Region I 631 Park Avenue King of Prussia, PA 19406

Reference:

Letter, Thomas T. Martin to W. G. Counsil, dated ' April 23, 1981, transmitting Inspection Report 50-423/81-02.

Dear Mr. Martin:

This letter documents the May 8, 1981 telephone conversation between you and Mr. J. R. Himmelwright of my staff concerning the above referenced Inspection Report. _

The Inspection Report lists seven (7). Apparent Items of Noncompliance (Appendix A) and five (5) Significant Cbservations (Appendix B) . The due date in the Report for the Appendix A response is May 18, 1981 (twenty five days from date of the Notice), and for Appendix B, May 27, 1981 (thirty days from date of receipt of the letter). It was noted by Mr. Himmelwright that the magnitude of the total corporate effort required in addressing the findings wonld make it very difficult to develope a complete response by the May 18 and 27,1981 due dates. A July 1, 1981 due date was therefore requested and concurred with by the NRC for responses to both Appendix A and Appendix B.

I trust this agrees with your understanding of the matter.

Very truly yours, NCRTHEAST NUCI. EAR ENERGY CCMPANY l (010 W. G. 'Counsil Senior Vice President cc See Next Page l

l i

sne soo377 g

(.

,, a cc: Mr. R. T. Carlson, Chief Reactor Construction and Engineering Support Branch Region.I-Office of Inspection and Enforcement U. S.' Nuclear Regulatory Commission.

631 Park Avenue King of Pru=sia, PA 19406 Mr. Boyce H. Grier, Director Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

-631 Park Avenue King of Prussia, PA 19406 Mr. Harold D. Thornburg, Director Division of Reactor Construction Inspection Office af Inspection and Enforcement U. S. Nuclear Regulatory Commission Washin.; ton, D.C. 20555

~

L l

. , , .