Forwards Revised Pages for Tech Spec 7220-C-88(Q),imposed Upon Subcontractor for Installing Backup Interceptor Wells. QC Instructions & over-insp Plan Encl.Info Updates 810323 & 0424 Request to Proceed W/Subj Installation
ML20004C262
Person / Time
Site: Midland
Issue date: 05/28/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20004C263 List:
References
12225, NUDOCS 8106020446
Download: ML20004C262 (2)


Text

l

,. .s THIS DOCUMENT CONTAINS POOR QUALITY PAGES James W Cook Vice PressJent - Projects, Engsneenng ned Constructnan i Generas offices: 1945 West Pernail Road. Jackson. MI 49201 * (517) 788-o453 May 23, 1981 p y^/%,'\. %f t s Y . T, $ -

c 7v IO I

Mr Harold R Denton, Director g p ' go ,;

Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission

]tT3 A *"'p[ y 4//j Washington, DC 20555 Q MIDLAND PROJECT

$'t blt/

& J.O \/

l DOCKET NO 50-329, 50-330 1

PERMANENT PLANT DEWATERING FILE: 0485.16 UFI: 71*01, 00234(S) SERIAL: 12225 ENCLOSURES: A) REVISED PAGES FOR SPECIFICATION C-88 B) BECHTEL QUALITY CONTROL INSTRUCTIONS FOR GRAVEL-PACKED WELLS C) CONSUMERS POWER MIDLAND PROJECT QUALITY ASSURANCE DEPARTMENT -

PROJECT INSPECTION PLAN AND REPORT on April 24, 1981 I sent a copy of Specification C-88 to you which specified the technical requirements imposed upon the subcontractor for installing the 20 backup interceptor wells. Since that time we have had discussions with the Staff, and as indicated in these discussions, we have decided to change to the cable tool well drilling process instead of jetting. Also discussed with the Staff and Region III were the quality assurance requirements to be placed upon the activities for installing the wells and for monitoring of the wells l after their installation. Based upon these discussions, we believe we have ,

l resolved all comments and are enclosing for the Staff's information; (1) an  !

I updated portion of the specification, 2) the quality control instructions for l l QC activities, and (3) an over-inspection plan which sill be implemented by the Consumers Power Midland Proj'ect Quality Assurance Department.

l l We believe that the previous information supplied to you on April 24 and March l

23, 1981 combined with the additional information attached to this letter, resulting from our recent discussions with the Staff and Region III personnel, i should be sufficient so that you can concur with our request tc proceed with

! the installation of the backup interceptor wells.

./ .

JWC/GSK/ re }o0[

/ ,

I(

l oc0581-0366a102 1 j

8168020446

~

e. .

l-CC RJCook, Midland Resident Inspector Atomic Safety.and Licensing Appeal Board -

Atomic Safety and Licensing Board Panel Charles Bechhoefer,-Esq James E Brunner, Esq -

Myron M Cherry, Esq Dr Frederick P Cowan Sceve Gadler D F Judd, Sr. Project Manager Frank J Kelley, Esq Ralph S Decker .

Wendell H Marshall Michael Miller, Esq William D Paton, Esq Mary Sinclair Barbara Stamiris C R Stephens

Docketing and Service Section I

}

a oc0581-0366a102

. - , _ _ . . _ _ . , _ _ _ , _ . ._ - ~ ..,.__..._,._...,___T,..- ,