MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
'
rh VERMONT YANKEE NL' CLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-03 FOR THE MONTH OF MARCH, 1981 i
l i 1
810.41gg979,
OPERATING DATA REPORT DOC'GT NO. 50-271 DATE 810409 COMPLETED 3Y D. Bernard TELEPHONE 617-872-8100 Ext. 2390 OPERATING STATUS
- 1. Uni: Name: Ver=ont Yankee
- 2. Reporting Period: March 1981
- 3. Licensed Thermal Power (Wt): 1593
- 6. Nameplate Rating (Gross We): 540
- 5. Design Electrical Rating (Net We):514(onen) 504 (close i)
- 6. Maxi =um Dependable Capacity (Gross We): 535
- 7. Maxi =um Dependable Capacity (Net We): 504
- 3. If Changes occur in capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. Power Level to 'ihich Restricted.If Any(Net We):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 2,160.00
'2. Number Of Hours Reactor Was Critical ?ti.no 2.160.00 59.695.78
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.0n.
- 14. Hours Generator On-Line 744.00 2.110.60 57.712.18
. 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Ther=al Energy Generated (WR) 1,115.000.00 3.169.359.00 81,773,376.00 l
l 17. Gross Elec:rical Energy Generated (WR) 378.875.00 1.073,713.00 27,186.560.00;
- 13. Ne: Electrical Energy Generated (MTd) 1r,1_747.00 1.030.500.00 25.778.079.00 L9. Unit Service Factor 100.00 97.71 77.22.
- 20. Uni: Availability Factor 100.00 97.71 77.22
- 21. Uni: Capacity Factor (Using MDC Net) 97.01 94.66 68.43
- 22. Uni: Capacity Factor (Using DER Net) os.12 92.82 67.1C
- 23. Unic Forced Outage Rate 0.00 2.29 7.14-
- 24. Shutdowns Scheduled Over Next 6 Montus(Type, Date, and Duration of Each):
- 25. If Shu: Ocun A End Of Report Period, Estimated Date of Startup:
- 26. Uni:s In Tes: Status (Prior :o Co==ercial Operatien): Forecast Achieved INITIAL CRI!!CALIT?
INIT!AL ELECTRICITf i
CCMMERCIAL CPERATION l
l
_~ __ . . _ . . _ _ . _- . _ . _ . _ _ _ _ _ _ _ _ _ , _ . _ . _ _ . _ _ _ _ .
e A". TQ. =-7 asu 9 e * .* */ '.M.s' * . 3. se'a mT.1 .! .P. a'?.'
.C C:.e_. . ,.e.
. .. v .c, 3 3.,_ . _
t'
.'.,*.. e - e = r .ree a
DATE 810!.09
-li C2.v?I,I T 3Y F.J. Surger i-z:,?gcNE 302-257-7711 Ex:. 137 i i.
v..C. . :. v..a .-..n i,
Da'.f e
A*s*73.Au_7 4
9sa e .' T *.7 $. C*a"71 . - ?- ***s*T? DAY A'e'T3 E*
Du**_*.p a
.a ,
(.
(L'e-Ne t) (L'e 'ie:)
2,,
-.- 3<. .,,__
2, , 3.
- . .e . 3_ . ._
- ,, 3..
2.
.r :s s2 .3s, ,.,
,0.
. .e.
c s , ,.
t
-~-
=, ,
... 32 3.3s ,3.
- - ,. s
.s.
3, ,, .e .s ,.
523 . .e . ---
l
.c.. ,
.6.
3,,,
.0.
- .,. .>. s.. ,
0 ., -
___,, 23.
L
..7
- ,, . 9. .
.'.'. _.' .O.
' c ~
.: 12 so- -i .t . 522
. A. . . 3
. .. .sm. .., C . ,%.i .q ..
<- v'a'e-N e: f:: each day in 2: ::is f:::a , lis: :he average dr.ily uni pcver ..
'_eva' e ,g a..a.
m ... .
..e
... ...C
..y ...4._.. , .. . .
c _. 7.. .,.e ..
.. . ..e .ea.65 . . ...w._
.. .. - - . _ . . . . . , , _ _ _ . - _ . ~ . , . - . . . - _ _ . . _ . - _ _ . . . . - . . . . . __ . _ , _ . , _ _ _ . _ . . , - . . . _ _ . . . _ - - . . _ . _ . . - = - - -
l IltilT SilllTDOWNS AND POWER REDilCTIONS DOCKET 110 50-271 IINIT NAHK Vermont Yankee DATE 810409 REPHIrl. HONTil Ma rc h ~ ~ ~ ~ ~
COMP ED itY F.J. Burger
- TEl.EPHONE 802-257-7711 Ext. 137 - ~
4 m
l ri am oa se a s< u e ca oao n Cause & CurrectIve lb s .
- Date 'O v4 64 a vi o I.icense go m.n a U ** n o 'u e s o ee ae Action to e O. 80 o e o as as Event o .o o .o
$ N O$b M
$ N .c (N em Report # $.0 TO U""" "'""""C"
! m b U
i.
N o
l _... . _ . _ _ A. .-
81-06 810314 S O B 4 N/A Rit CONROD Power reduction for control rod pattern (Power RB PllHPXX exchange and special testing, reduc- SP VESSEL.
d tlon)
Hi-0/ H10317 S O is 4 N/A RB PuriPXX Power reduction for special testing I (Power reduc-tion) 4 l,
81-08
- 810322 S 0 11 4 f*M Cl1 CENERA Power reduction for mafutenance of the (Power EA ZZZZZZ reactor rectre. pump MG sets. Maintenance
. reduc- of the of f-site higli voltage distribution tion) system was also completed.
1 l 1 2 3 4 j F: Fo ced Reason: Method: Exhihit G- Instructions S: Sc heilu t ed A-Equipment Failure (Explain) l- Manual for Preparation of Data j ll-Haint enance o r Test 2- Manual Scram Entry Sheets'for I.icensee l C-Refuellug 3- Aut omat ic Scram Event Report (I.ER) File 1
D-Regulatory Restriction 4- Other (Explain) (NilREC 0161)
E-Operator Training & l.icense Examination l 5 F-Administrative Exhibit 1 - Same Source U-Operational Error (Explain) i Il-Other (Explain) o I leDat
150CKtJ f40. ?>O-/ / I UNIT Vermont Yankee _
DATE 810409 CollPl.ETED BY F . .I . liurger
'l El.EPIlONE 802-25/-7711 Ext. I37 SAFETY REI.ATED MAINTENANCE NATURE OF MAI. FUNCTION 1.ER OR OU'l' AGE EI!Ili PMENT MAINTENANCE NLIMi!ER CAUSE RESill.T CORRECT 1VE ACT10ll Reactor Water Cleanup Pump, Corrective N/A Normal Wear Seal f.eakage Replaced Pump P-49-IA MR 81-101 Pressure Switch PS 2-3-52h Corrective N/A Normal Wear Seat f.eakage Replaceu Valve Isolation Valve MR 81-226 RilR Valve V10-16A Corre: Live N/A Frilled Auxillary Valve Would Not Replaced cont.act, MR 01-279 Conteset, Open ilPCI Valve V23-14 Corrective N/A Worn Packing I.eakage Adjusted Packing MR 81-282 "B" SliGT Train Preventive N/A N/A N/A Change Charcoal In Test MR 81-286 Cell "li" SliGT Train Charcoal Corrective N/A Tests Indicitate Charcoal Contam- Replaced Charcoal Filter Filter MR 81-303 Charcoal Near End inated But Serv-Of 1.ife icable PCIS Relay 16 AK-2ti Corrective N/A Worn Parts Failed Relay Replaced Parts As MR 81-319 Necessary w
a
3 DOCKET NO. 50-271 g77 Vermont Yankee DATE C 0409 COMPLETED 3Y F.J. Burger TELEPHONE 802-257-7711 Ext. 137 -
REPORT MONTH March SLT ARY OF OPERATING EXPERIENCES High11thes 7erson: Yankee operated at 94.07% of rated ther=al power for the nonth.
Gross electrical generation was 378,375 MWH e or94.3% of design electrical capact:7 Ocerating Su=mari The following is a chronological description of plant operations including other pertinent items of interest for the sonth:
3/1/81 At the beginning of the reporting period the plant was operating at 39% of rated thermal power. Turbine generator surveillance was in progress.
3/14/81 At 0015 hrs. a power reduction was initiated for stability testing, torus testing, and a control rod pattern exchange.
3/15/81 At 0700 hrs. a power ascension was started to return to full power, torus testing was still in progress.
3/17/81 At 2334 hrs, a power reduction was initiated for additional stability t e s t ing.
3/19/S1 At 0305 hrs. the testing program was completed. At 1230 hrs. a return to full power was initiated.
3/22/81 At 0645 hrs. a power reduction was initiated for maintenance on the reactor recire. pump MG sets. Maintenance was also performed on the off-site high voltage distribution system. At 1157 hrs. a return to full power was initiated.
3/31/81 At the end of the reporting period the pInnt was operating at 99.8%
of rated thermal power.