Requests Exemption from Requirements of 10CFR45.(b)(2)(iii), to Allow for Submittal of NRC Form 474, Simulation Facility Certification, After 910326 Deadline
ML19332C453
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/21/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-1072, NUDOCS 8911280144
Download: ML19332C453 (2)


Text

, , . -

P

{

, s.

THE CLEVELAND ELECTRIC ILLUMINATING-COMPANY P P.O. DOX 97 8 PERRY. OHIO 44081 S TELEPHONE (216) 9694'37 3 ADDRES$ 10 CENTER ROAD FROM CLfVELAND: 471 kip 90 S TELEX: P41699 ANSWERsACK: CEIPRYO Al Kaplan Serving The Best location in the Nation 3

PERRY NUCLEAR POWER PLANT NUCLi Ah n8tOU6' November 21, 1989 PY-CEI/NRR-1072 L U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Request for Exemption from 10CFR55.45(b)(2)(iii) Filing Deadline Centlement The Cleveland Electric 111uminating Company (CEI) pursuant to 10CFR 55.11, hereby requests an exemption from the filing requirements of 10CFR 55.45(b)(2)(iii) to allow for the submittal of NRC Form-474, " Simulation Facility Certificution" after the March 26, 1991 deadline provided in the rule. Pursuant to 10 CFR 55.11, the Commission may, upon application, grant such exemptions from the requirements of the Regulations as it determines are authorized by law and will not endanger life or property and are otherwise in the public interest.

CEI intends to comply with 10CFR 55.45(b) by certification of a plar.t referenced si;nulation facility in accordance with 10CFR 55.45(b)(5)(1).

Initial plans to upgrade our existing simulator were determined not to be feasible, leading to award of a contract on June 1, 1989 to Singer Link-Miles ,

l Simulator Corporation for the purchase of a certifiable plant referenced L simulator. This exemption is necessary becaut.e under our current accelerated production schedule, our replacement simulator will not be in a certifiable state of completion by the March 26, 1991 deadline. As stated in our August 30,.1989 response to Generic Letter 89-12, CEI expects to file certification Form 474 on or about May 17, 1991 following completion of vendor and CEI ,

acceptance testing but prior to shipment of the simulator from the vendor l facility.

l J$h12ggggg gg[o0,gc, 2

O d P \ 0

4 y* % NRC N:vember 21, 1989 f PY-CE1/NRR-1072 L  ;

l Granting of this requested extension for filing of Forn-474 will not endanger life or property and will not create any new safety concerns. The Commission has itself recognised in the Supplementary Information published along with the Final Rule to 10CFR $5.45 [52 FR 9458), that unique circumstances may arise on a plant specific basis that causes some deviation from the time requirements established in the rule. Where, as here, the licensee (CEI) has made reasonable efforts to comply with the filing requirement and otherwise intends to fully comply with 10CFR 55.45(b), such exemption should be granted.

If you have any questions, please feel free to call.

Very truly yo s,

G-Al Kaplan Vice President Nuclear Group AKinjc ces. K. Perkins T. Colburn P. Hiland U.S. NRC Region 111 M.. Jordan N. Hunemuller