MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 9805301998-03-0606 March 1998 Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 9804041998-02-17017 February 1998 Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 U-602932, Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment1998-02-13013 February 1998 Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment U-602925, Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor1998-02-0606 February 1998 Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor U-602920, Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 9802171998-01-28028 January 1998 Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 980217 U-602910, Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution1998-01-16016 January 1998 Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution U-602894, Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept1997-12-18018 December 1997 Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept U-602876, Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 9801291997-12-0303 December 1997 Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 980129 U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 9712181997-10-29029 October 1997 Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 U-602823, Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes1997-08-28028 August 1997 Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes ML20149F6031997-07-18018 July 1997 Part 21 Rept Re R47 Incorrectly Installed on Electric Power Assembly.Recommends Evaluation of Timing Delay Requirements Applicable to Reactor Protective Sys ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20136D5641997-03-0707 March 1997 Part 21 Rept Re Transformer Not Being Stable in No Load Condition & Tripping When Lightly Loaded U-602704, Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys1997-02-27027 February 1997 Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause U-602677, Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker1996-12-20020 December 1996 Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker U-602634, Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul1996-09-20020 September 1996 Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul ML20116B9251996-07-25025 July 1996 Part 21 Rept Re Failure Analysis Concerning Pump Assembly NS109761EQX07 ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs U-602580, Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly1996-05-0808 May 1996 Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly U-602579, Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept1996-05-0202 May 1996 Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept ML20108D1441996-05-0101 May 1996 Part 21 Rept Re Failure of Pump Assembly for Itt Barton Series NH95 Hydramotor Actuator.Did Not Develop Pressure Because Was Not Fitted Properly.Pump Assembly Has Been Returned to Itt Barton for Insp U-602564, Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia1996-03-13013 March 1996 Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia U-602532, Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers1995-12-20020 December 1995 Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers ML20094P5671995-11-20020 November 1995 Part 21 Rept Re Abb Power Shield Trip Units (Pstu),Type SS-13.On 951006,util Reported to NRC That Two Pstus,Type SS-13 Tripped VC & Vx Sys Circuit Breakers.Recommends Insp of Power Shield SS Trip Units Prior to Serial 80,000,in Svc U-602502, Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker1995-10-0606 October 1995 Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker U-602497, Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity1995-09-26026 September 1995 Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity U-602466, Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 9509271995-07-12012 July 1995 Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 950927 ML20084B0071995-05-22022 May 1995 Part 21 Rept Re Failure of Elgar Inverter Pwm Drive Logic Card on 950324.Cause of Failure Unknown.Subsequent Replacement Logic Card Identified as Deficient.Both Logic Cards Returned to Mfg for Analysis ML20072S0051994-08-18018 August 1994 Part 21 Rept Re Failure of Motor Operated Potentiometer Mfg by Basler Electric.Qualification Testing of Units Revised & Mkw Power Sys Will Perform Site Visit at Basler Electric to Verify Adequacy of Basler Electric C/A U-602305, Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay1994-06-27027 June 1994 Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram1994-06-0606 June 1994 Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data U-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for Jul 1999 for CPS Unit 1.With ML20211C9621999-07-26026 July 1999 ISI Summary Rept U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999 Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603233, Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Clinton Power Station.With ML20210K8391999-05-11011 May 1999 British Energy Annual Rept & Accounts 1998-99 ML20206H1231999-05-0505 May 1999 Illinois Power Co CPS Main CR Simulator Certification Rept U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603210, Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603176, Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With ML20207F2031999-02-10010 February 1999 Rev 1 to CPS COLR for Reload 6 Cycle 7 ML20202J0181999-02-0303 February 1999 SER Accepting Changes in Quality Assurance Program,Which Continues to Meet Requirements of App B to 10CFR50 U-603223, Illinova Corp 1998 Annual Rept. with1998-12-31031 December 1998 Illinova Corp 1998 Annual Rept. with U-603144, Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603124, Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603103, Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves U-603091, Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With ML20153F9871998-09-17017 September 1998 Safety Evaluation Accepting 980225 Proposed Rev 26 to Illinois Power Nuclear Program Qam ML20151U1391998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Clinton Power Station,Unit 1 ML20237E3991998-08-27027 August 1998 SER Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Clinton Power Station ML20237A1521998-08-0707 August 1998 SER Re Mgt Services Agreement at Clinton Power Station. Approval Under 10CFR50.80 Not Required ML20151Y6591998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Clinton Power Station,Unit 1 U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps U-603041, Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 ML20151U1501998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 U-603023, Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 1 U-603014, Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed1998-05-28028 May 1998 Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-603006, Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 1 U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation 1999-09-30
[Table view] |
Text
m -
ff Limiterque C@rpsratl@n h
- Automoted Volve Actuotors and Jotkl for industry- - l b %d; $114 Woodoll Rood P.O. Dox 11018 Lynchburg, VA 245061018 N k Te4 phone-804 528-4400
kp- ) I e Y $
L 4_
h September 29,'1989 t
/ \
U. S. Nuclear Regulatory Commission
[, Washington, D.' C. 20555. ;
t o :
Re: Limitorque Corporation j Part 21 Notification ,
Subject:
SMB-000 and SMB-00 Torque Switches Attention: Director, Nuclear Reactor Regulation Gentlemen:
Pursuant to the requirements of Title 10 of the Code .of Federal Regulations Part 21 herein provided is notification of potential common failure of SMB-000 and SMB-00 cam type torque switches supplied prior to 1981 and 1976 respectively, as detailed in the attached letter. In order to expedite the notification of the facilities affected, Limitorque has made simultaneous-written notice to both the commission and the attached list of
,s. nuclear utility customers.
Signed: .
f - - - -
I. E. Wilkinson Vice President of Engineering LIMITORQUE CORPORATION
[Ed 8910180201 890929 -
PDR PT21 ENVLMIT s 89 PNV
,c .
W..
j! .
O,,
(h:I '
Limit @rque C@rp@rati@n A'utornoted Volve Actuotors and Jacks for Industty i
5114 Woodoll Rood. - P,0, Dox 11318- Lynchburg, VA 24506 1318.
y V{.:?
Telephone-804 528-4400
-}
Y ' ,J eme - -
i
, ' September 29,1989 meml a
l, y j, ,
i ,
IP ' ..,
f
SUBJECT:
10 CFR Part 21 Notification s
L '
l - Gentlemen: .
L '
L: Please be advised Limitorque has concluded its evaluation of two SMB 000 torque switch ;
L failures, at Clinton Nuclear Power Station and Detroit Edison's Fermi Unit No. 2. We L - have determined that these failures.do represent a potential common mode failure and:
g ; are therefore a reportable defect in accordance with the Code of Federal Regulations Title
? '10, Part 21. .
[
~ p: ,
- Idantification~of Ranic Comoonent '
?The component of concern is the SMB 000 and SMB-00 cam type torque switch with fiber spacers under the contact bridge (see attachment #1).-
"a i'
Nature of the Defect u.
' A single 1SMB 000-torque switch failure occurred at _two plants as a result of the
- stationary contact screws loosening on the side of the torque switch which had fiber -
Jspacers. The fiber spacers were installed on one side of the torque switch to provide equal spring pack compression in each direction to balance the torque switch.
T g y =,*-,9w- >_. .-uy_-e 7w p_ y p,,.s,. ..p,,,, ,.a, . , , ,,. . , , _ _ , _ . . . , _ . ,
,; .L .
1 - )
- 2 Page 2 . j September 29,1989
]
. Part 21 Notification-- 1 Two types of failure modes have been reported. In one case only one screw came loose eliminating electrical continuity with the contact bridge resulting in a premature trip i point _ on the torque switch. The second et se occurred when both stationary contact screws loosened and the contact fingers were raised while continuity was maintained.
This resulted in a condition where greater spring pack compression was required before i the electrical contacts would open, in this case the electric motor went to locked rotor
_ before the actuator could produce sufficient output torque to break the torque switch contacts. In both cases, the stationary contact screws that loosened were on the contacts which had the fiber spacers. .
A simikar torque switch failure had occurred in 1980 at the Susquehanna Plant. At that time, it was hypothesized that the cause of the loosening of the contact screws was a result of the fiber spacen taking a set and releasing pre load from the contact screws, thus allowing the screws to loosen. At this time a Part 21 detennination concluded that this was not a reportable incident as it was a single failure of a component which had a large population in use in the industry. In response to this concern Limitorque' ;
!. modified the torque switch design to replace the fiber spacers with additional metallic I
contact bridges to insure that no further difficulties would be encountered.
Eauinment Effeqtgd _
All EMB 000 and SMB-00 actuaton with cam type torque switches using the fiber spacer ;
could potentially experience this type of failure. SMB-000 actuators with serial number l less than 326670 and SMB-00's with serial numbers less than 233218 were originally i l
manufactured with cam-type torque switches, using fiber. spacers. Any replacement
! torque switches which may have been purchase for SMB-000's after 1980 or for i' .SMB 00's after 1976 would not have included the fiber spacers and therefore do not '
l contain a reportable defect.
Licensee Corrective Action L Limitorque recommends that those SMB-000 and SMB-00 actuators with the cam-type L torque switch with fiber spacer be replaced. To date, we have received reports of three failures of this torque witch configuration which represents less than one tenth of one percent of the total population of these switches. Consequently, we are recommending that these switches be replaced during the next available maintenance period.
~ ~
q ,
-?
6 ;, . ,
, = '
c h Pagk 3 .
i September 29,1989 Part 21 Notification
~
The f.imitoraue Corrective Action L Limitorque modified the SMB-000 torque switch in 1980 and the SMB-00 torque switch ,
in 1976, therefore all new tortine switches manufactured after this period are not subject ;
p to this problem.
n
@ -In the event that you should have any questions concerning this report, please contact f either Rob Laird or Mike Bailey in our Nuclear Support Deputment at our Lynchburg
} facility. j l-Very truly yours,
~ .
/
l I. E. Wilkinson l Vice President of Engineering LIMITORQUE CORPORATION Attachment L.
L cc: T. Mignogna
[ R. Kornsey 10 CFR 21 - 16 file i
l
. . . - - _ . . . . _ . . . - . . . . - _ _ _ , . . _ . - _ ~ . . _ _ . . - _ _ _ , , ~ . _ _ .
- o ' * '
Attachment 01 l
,0 '.-- -
September 29.~1989 Part 21 Notification
+
1 I
4 6
l
's DOUBLE TORGUE SWITCE SnEB OO/SMB-OOO 27 73 21 3 *! JT I9 eaan&'.'"
W A ETmIB
, se i e 5
l \ ,,
[ -f}{ci.sAnAnce n ,,,,7 y , (/
M..,59 d l ng\-
t- '
P.gi.- - 1 ,
',7<
f bl ..
- f. .- T ,,,,-:g,. p.
a gj y --
g -
X e 9 4 - ,,: -
, f ,
7.
h 1
s M M #
N., 4
=== ,
. v Ab 8 "
32 38 h IT 13 1 16 It h e - ee .
l
, 'P '
g .1 ,
_- n. .
w g.f w
' t- m._
? -
so ner.
)y
- 4.\ 3 i
e m AfD Cais mannassessar
- 01.A74 001w sk OEscetPfleet a000. DEgemerfles 9840. 089000PT1000 l i TRAII6NAL SLOCK 13 4 LOCItWASIIER 38tAREPROOF 29 I M SWAN NUT l 2 2 COIITACT 080008 16 1 T000gE &N. MTE BAACRET 30 2 g
3 4 COIITACT SC8tP' 17 I "O" ttate 18 2 LOCRWA$lett SNANtPA00f 4 4 FMISER IIOLa(R II 1 "tr' fl818 32 2 FLATWASNER 5% l.0. x % 0.0. .032 TNIL 5 4 FisISER 19 2 SOC MS. CAP SCR. M.20 s % LG. 33 I arm 4 4 Segusef 20 l CAas 34 i ROLLER 7 4 Steulef WASNit 4 0.0. W l.0. W THK. 21 1 T00580N SMHee 35 l 40LLIA PIN 8 4 RtWET 22 i SMINS IIANONL 38 1 GROOYE PIN W OlA. I %
9 4 FiletES SMlles STUS 23 I OIAL 37 AAC BAtattR 10 4 C000P98338000 SMefe8 24 3 SalAff 38 I PAN NO. SCt. M 40 m %
11 8 SMHIS CUP WASNES 25 2 $f9tsER 39 i LOCnWASNER. EXT!aseAL TOOTN 12 4 COTTER PtN (W s %) 28 1 700 gut ListTIfes PLAft 40 4 WASMER 84. 0 0. s.8% 10. a W TMN.
13 4 WEX. NO. MACN. SCR. st0 32 % 27 i STeimit MUS 42 2 #0. No uAces. Sca. %.la a %
- 1 A T TU P TAIL
q ; .. : .
p ,e .- , , t i
i Alabama Power Company'- Farley. . Boston Edison Company
-Nuclear Plant R. G.' Bird
'J. Woodward V ., P. Nuclear ,
,. Plant Manager 800 Boylston Street
- l. . Boston, MA 02199 1;. . Columbia,7AL 363191 -
l
' Boston Edison-Company Alabama. Power Company Hawley F. Brannan
.J. W. McGowen Manager. Quality Assurance Mgr. Safety Audit & Engr. Department 1 Review 25 Braintree Hill Park P. O. Box 2641- Braintree, MA 02184 Birmingham, AL 35291 Carolina Power & Light
- American Electric Power Service R. E. Lumsden L. Company Manager Quality Assurance P. O. Box 1551 Section Mgr. Audits- & Raleigh, NC 27602 Procurement '
P. 0. Box 16631 Columbus, OH 43216 Cleveland Electric Illuminating Company '
E. Riley Arizona Nuclear Power Project Director Quality Assurance L. G. Papworth P. O. Box 97 Director QA/QC .
Perry, OH 44081 l
-P. O. Box 52034 - Mail Station i 4072-Phoenix, AZ 85072 Commonwealth Edison Walter J. Shewski Manager Quality Assurance Arkansas' Power & Light Company P. O. Box 767
- Arkensas Nuclear one Station Chicago, IL 60690 Purchasing '
P. O. Box 551 - Connecticut Yankee Atomic Power Little Rock, AR 72203 Company - Haddem Neck Plant D. B. Miller Station Superintendent
~ Baltimore Gas & Electric - Fort P. O. Box 127E Smallwood Road Complex East Hampton, CT 06424 J.-A.-Tierman
'V. P.-Nuclear Energy Quality Assurance Consolidated Edison Company -
Indian Point #2 P.-O. Box 1475
(' Baltimore,-MD J. A. Basile General Manager Nuclear Power Generation Buchanan, NY 10511
j p 3. . .
i i
Consumers Power Company Florida-Power & Light - Turkey F. W. Buckman Point Station i .Vice President,. Nuclear C. J." Baker j 212 West Michigan Avenue Plant Manager '
i
^
Jackson, MI 48201 P. O. Box 4332 Princeton, FL 33032-Detroit Edison .
2 S; E. Kremer _
Florida Power & Light -
S t. . i Nuclear Procurement Supv. Lucie Station 6400 North ~ Dixie Highway G. J.-Boissy Newport, MI 48166 Plant Manager P. O. Box 128 l Fort Pierce, FL 34954 b Duke Power Company M. S. Tuckman Station Manager Florida Power & Light 3i J. W. Dickey l Seneca, SC 29679 V. P. Nuclear Operations P. O. Box 14000 Juno Beach, FL 33408 Duke Power Company E.-M. Geddle-
? . Manager Nuclear Operations Florida Power Corporation u P. O. Box 33189 G. R. Westafer Charlotte,;NC 28242 Director Quality Programs P. O. Box 14042 St. Petersburg, FL 33733 Duke. Power Company -
Catawba L Nuclear Station J. W. Hampton GPU Nuclear Corporation -
Station Manager. Oyster Creek Nuclear Generating P. O. Box 256 Station Clover, SC 29710 P. B. Fiedler Vice President P. O. Box 388 Duke Power Company -
McGuire Forked River, NJ 08731 Station T. L. McConnell Station Manager GPU Nuclear Corporation - Three
- P. O. Box 488 Mile Island Unit #1 l Cornelius, NC 28013 H. D. Hukill, Jr.
Vice President 1 I
P. O. Box 480 Duquesne Light Company - Beaver Middlett1wn, PA 17057 Valley Power Station C..E. Ewing Manager Quality Assurance GPU Nuclear Corporation - Three P. O. Box 321, SEB3 Mile Island Unit #2 Shippingport, PA 15077 F. R. Standerfer L Vice President P. O. Box 480 Middletown, PA 17057 1
gyp :.
- . o t .w
^)
-I i
Georgia' Power Company Illinois Power Company -
I. Otis Berkham Clinton Power Station Vice President Procurement & R. E. Campbell i Materials .
Manager Quality Assurance !
P. O. Box 4545 P. O. Box 678 Atlanta, GA 30302 Clinton, IL 61727 -
Georgia Power Company - Vogtle' Indiana / Michigan Power Company Plant - Donald C. Cook-Nuclear Plant G. Bockhold W. G. Smith, Jr.
General' Manager Plant Manager Old River Road P. O. Box 458 Waynesboro, GA 30830 Bridgman, MI 49105 .
i Georgia Power Company'- Edwin Iowa Electric Light & Power
,I. Hatch Plant #2 Company - General Office J. T. Bockham, Jr. E. G. Matthews Vice' President Manager Quality Assurance P. O. Box-439
-Baxley, GA 31513 Cedar Rapids,_ IA 51406 Gulf States Utilities Long Island Lighting Company -
T. F. Plunkett Shoremam Plant Manager. W. E. Steiger -
P. O. Box 220 Plant Manager
'St."Francisville, LA 70775 P. O. Box 618 Wading River, NY 11792 Houston Lighting & Power i
Company -
Document Control Louisiana-Power & Light Company l_ Center - Waterford Nuclear Station ,
l N. S. Cams '
Plant Manager P. O. Box 1103 P. O. Box B, Highway 18 Houston, TX 77251 Killona, LA 70066 Houston Lighting & Power Maine Yankee Atomic Power Company - South Texas Project Company
! W. Kinsey C. D. Fritzle i Plant Manager Vice President Manager of
-P.,0. Box 308 Operations Bay City, TX 77414 Edison Drive Augusta, Me 04336
~ .; ,
i' .
.5 q t _
L Nebraska Public Power Distiict -NoEtheast Utilities
G. R.-Horn . Supervisor, Procurement QA Division- ' Manager Nuclear P. O. Box 270 Operations Hartford, CT 06140-0270 :
P. O. Box 98 i Brownville, NB 68321 ;
Northern States Power -
Monticello Nuclear Plant New Hampshire Yankee W. Shamla T. Feigenbaum Plant Manager V. P. . of - Engineering and Quality Programs P. O. Box 600 P. O. Box 700 Monticello, MN 55362 Seabrook, NH 03874
, Northern States Power - Prarie L New York Power Authority -
Island Nuclear Station James'A..Fitzpatrick Plant E. Watzi -
Richard Patch Plant Manager Guperintendent Quality 1717 Wakouada Drive, East Assurance. Welch, 104 55089 P. O.-Box 41 Lyccming, NY 13093 J. E. Bentzinger
.New YorP Power Authority -
Supv. Procurement Quality Indian Point Unit #2 Assurance C. Mackay .1623 Harney Street Operations Superintendent Omaha, NB 68102 P. O. Box.215 Buchanan, NY 10511 f
Omaha Public Power District -
L Ft. Calhoun Nuclear Station L Niagara Mohawk Power L.-T. Kusek Corporation Supervisor Operation A. E. Winegard P. O. Box 399 Q.A. Building C-1 Ft. Calhoun, NB 68023 3001 Erie Boulevard West Syracuse, NY. 13202 Pacific Gas & Electric S. M. Skidmore Niagara Mohawk Power '
Corporation - Nine Mile Point 77 Beale Street - Room F 1800 T. J.-Perkins San Francisco, CA 94106-General Superintendent Nuclear Generation P. O. Box 32 Lycoming, NY 13093 l-'
+ - -
- Tr w -eye -- - - - r- y- me w w-
' *~
F': . s s.
i -f* e i
,l Pennsylvania Power & Light - Public Service Electric & Gas )
NQA-Procurement A2-2 -Company-A. R. Sabel Charles Johnson 4 Manager . Nuclear Quality General Manager Nuclear Quality j Assurance Assurance- i Two_ North' Ninth Street 80 Parks Plaza J Allentown, PA 18101 Newark, NJ 07101 Philadelphia Electric -~ Rochester Gas & Electric
. Limerick Station Corporation - Robert E. Ginna ,
' Brian Curry Plant J. C. Bodine <
P. O. Box A, Sanatoga Branch Manager Nuclear Assurance ,
Pottstown, PA 19464 1503 ' Lake Road-
- Ontario, NY 14519 L
i: Philadelphia Electric Sacramento Municipal Utility '
Director Quality Assurance District - Rancho Seco Nuclear 2301-Market Street Plant Philadelphia, PA 19103 .
Director of Quality Assurance 14440 Twin Cities Road Portland General Electric -
Herald, CA 95638-9799 Trojan Nuclear Plant C. A. Olmsted l Plant Manager Southern California Edison. ,
L Route 2,-Box 439 R. M. Rosenblum l- Rainer, OR 97048 Manager Nuclear Quality l Assurance L P. O. Box 800 l
Public Service Company of Rosemead, CA 91770 colorado -
Ft. St. Vrain Generating Station C. H. Fullers System Energy Resources, Inc. -
. Plant' Manager Grand Gulf 1 & 2 16805 Weld County Road - 19 1/2 W. E. Edge Platteville, CO 80651 Manager Programs Quality n Assurance i
P. O. Box 756 Public Service Company of Port Gibson, MS 39150 Colorado n R.'O. Williams Vice President Nuclear Tennessee Valley Authority lo Operations Daryl Cox l P. O. Box 840 WT7D197P-K Denver, CO 80201 400 W. Summit Hill Drive - 143 LB Knoxville, TN 37902 1
I
w s 3 9 * ~ , y l *P' f;'" '
c I
1
- J Texas Utilities -Electric Wisconsin Public Service company. corporation
- J.'F. Streeter A. J. Ruege Director Quality Assurance Supervisor Quality Assurance P. ' O. Box 2300 P. O. Box'19002 Glen Rose, TX 76043 Green Bay, WI 54307 Toledo Edison Company Wolf Creek Nuclear Operating L. Ramsett Corporation .
Director Quality Assurance .R. Grant 5501 N. State Rt. 2 Vice President, Quality Oak Harbor, OH 43449- P. O. Box 411 Burlington, KS 66839
' Union-Electric Company A. P.'Neuhalfen Yankee Atomic Electric Company Manager Quality Assurance A. Shephard P. O.. Box 149 Director Quality Assurance-St. Louis, MO -63166 1671 Worcester Road Framingham, MA 01701 Vermont . Yankee Nuclear Power Corporation Arkansas Power & Light Company W. P. Murphy Vice President Manager of Operations Assessment' Operations. Superintendent ,
Route 5, Box 169 Route 3, Box 137G Brattleboro, VT 05301 Russellville, AK 72801 Virginia Power Company Arkansas Power & Light Company
- W. L.' Stewart
,_ Vice President Nuclear Engineering Support Supervisor L Operations Route 3, Box 137G l
P. O. Box 26666 Russellville, AK 72801 p Richmond, VA 23261
( Public Service Company of <
l Washington-Public Power Supply Colorado System D. S. Feldman _
Nuclear Licensing Department Manager Plant Qa/QC 16805 Weld County Raod 19 1/2 P. O. Box 968 Platteville, CO 80651 Richland, WA 99352' Florida Power & Light Wisconsin Electric Power Ken Harris Company Site Vice President i C. W. Fay P. O. Box 128 Vice President - Nuclear Ft. Pierce, FL 34954 P. O. Box 2046 1 Milwaukee, WI 53201 l