ML19276D668
ML19276D668 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 10/03/2019 |
From: | Robert Orlikowski Operations Branch III |
To: | Pry J FirstEnergy Nuclear Operating Co |
Orlikowski, R J | |
References | |
Download: ML19276D668 (2) | |
Similar Documents at Perry | |
---|---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024
[Table view]Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report 2024-01-30 Category:License-Operator MONTHYEARL-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023
[Table view]Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000440/20223012023-01-24024 January 2023 05000440/2022301 ML23038A1092023-01-12012 January 2023 Form 2.1-1 Examination Prep Checklist ML23038A1142023-01-12012 January 2023 NRC Exam Security Agreement ML23038A1452023-01-12012 January 2023 3.4-1 Events and Evolutions Checklist L-22-282, NRC 2022 Post Exam Submittal Cover Letter2023-01-0404 January 2023 NRC 2022 Post Exam Submittal Cover Letter ML22333A7902022-12-0606 December 2022 Operator Licensing Examination Approval - Perry Nuclear Power Plant December 2022 ML23038A1432022-12-0101 December 2022 2.3-1 Examination Outline Quality Checklist ML23038A1572022-12-0101 December 2022 2.3-2 Operating Test Quality Checklist ML23038A1582022-12-0101 December 2022 2.3-4 Written Examination Quality Checklist L-22-184, Proposed Exam Cover Letter 2022 Signed2022-09-14014 September 2022 Proposed Exam Cover Letter 2022 Signed ML23038A1482022-07-29029 July 2022 Day Letter Signed ML22130A7972022-05-11011 May 2022 Confirmation of Initial License Examination L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000440/20213012021-04-0808 April 2021 NRC Initial License Examination Report 05000440/2021301 ML22165A3202021-03-22022 March 2021 2021 Perry Ile ES-401-4 ML22165A3182021-03-22022 March 2021 2021 Per Ile ES-301-7 Operating Test Comments-Final ML22165A3212021-03-22022 March 2021 2021 Perry Ile ES-401-9-Final Combined ML22165A3072021-03-22022 March 2021 2021 Perry Ile ES-201-1 Exam Prep Checklist ML22165A3082021-03-22022 March 2021 2021 Perry Ile Es 201-3 Security Agreement-Final ML22165A3112021-03-22022 March 2021 2021 Perry Ile Es 403-1-Final L-21-087, 2021 Perry Ile Post-Exam Submittal Letter2021-03-0202 March 2021 2021 Perry Ile Post-Exam Submittal Letter ML22165A3252021-02-19019 February 2021 2021 Perry Ile Administered Walkthrough JPMs-Final ML22165A3262021-02-19019 February 2021 2021 Perry Ile Administered Scenarios-Final ML22165A3272021-02-19019 February 2021 2021 Perry Ile Administered Written Exam with Reference Handouts-Final ML21032A0822021-02-0101 February 2021 Operator Licensing Examination Approval ML22166A0252021-01-29029 January 2021 2021 Perry Ile Proposed Walkthrough JPMs-Final ML22166A0322021-01-29029 January 2021 2021 Perry Ile Proposed Scenarios-Final ML22166A0352021-01-29029 January 2021 2021 Perry Ile Proposed Written Exam ML22165A3332021-01-29029 January 2021 2021 Perry Ile ES-301-3 - Signed ML22165A3342021-01-29029 January 2021 2021 Perry Ile ES-301-4 - Completed ML22165A3352021-01-29029 January 2021 2021 Perry Ile ES-301-6 Competencies Checklist Pg-1 Rev 0 ML22165A3372021-01-29029 January 2021 2021 Perry Ile ES-401-6 - Signed L-20-292, 75-Day Exam Submittal Cover Letter2020-11-0404 November 2020 75-Day Exam Submittal Cover Letter ML22166A4322020-10-15015 October 2020 2021 Perry Ile ES-301-1s-Final ML22166A4332020-10-15015 October 2020 2021 Perry Ile ES-301-2s-Final ML22166A4342020-10-15015 October 2020 2021 Perry Ile ES-401-1 and 401-3 Outlines-Final ML22166A4402020-10-15015 October 2020 2021 Perry Ile ES-D-1s Rev 11 Scenarios-Final ML22166A0482020-10-15015 October 2020 2021 Perry Ile ES-201-2 - Signed ML22166A4312020-10-15015 October 2020 2021 Perry Ile ES-301-5 Transient and Event Checklist Rev 0 ML20205L3692020-07-23023 July 2020 Confirmation of Initial License Examination ML19276D6682019-10-0303 October 2019 GFE Results, September 2019 IR 05000440/20193022019-09-27027 September 2019 NRC Initial License Reexamination Report 05000440/2019302 (Rdb) ML22144A3802019-09-12012 September 2019 2019 Perry Retake Written Re-exam Reference Handouts ML22144A3792019-09-12012 September 2019 2019 Perry Retake Administered Written Re-Exam ML22144A3832019-09-0505 September 2019 2019 Perry Retake Proposed Written Re-Exam ML22144A3822019-09-0505 September 2019 2019 Perry Retake ES-401-6 Written Exam Quality Checklist ML22144A3602019-09-0303 September 2019 2019 Perry Retake 401-9 Final ML22144A3612019-09-0303 September 2019 2019 Perry Retake Es 403-1 ML22144A3442019-09-0303 September 2019 2019 Perry Retake ES-401-4 Rejected KAs 2023-05-23 Category:Generic Fundamental Examination (GFE) MONTHYEARML19276D6682019-10-0303 October 2019
[Table view]GFE Results, September 2019 ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML17010A0562017-01-0909 January 2017 GFE Annual Registration Letter - 2017 Examinations - Region III 2019-10-03 |
Text
October 3, 2019 Mr. James Pry Manager, Site Training FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Reg Affairs - A210 10 Center Road, PO Box 97 Perry, OH 44081
Dear Mr. Pry:
On September 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees at your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A P in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an F indicates that the individual failed the exam.
If you have any questions concerning this examination, please contact Mr. Eric Cushing at 301-415-1064.
Sincerely, Robert J. Digitally signed by Robert J.
Orlikowski Orlikowski Date: 2019.10.03 07:59:25
-05'00' Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-440 Enclosures (Non-Public):
- 1. Examination Forms A and B with answers
- 2. Examination Results Summary for Perry Nuclear Power Plant
- 3. Individual Answer Sheets
J. Pry 2 DOCUMENT NAME:
Perry GFE results Sept 2019.docx TEMPLATE#: NRR -079 OFFICE RIII/DRS/OB:OLA RIII/DRS/OB:BC NAME CSchmidt CS ROrlikowski RJO DATE 10/02/19 10/ 3 /19 OFFICIAL RECORD COPY