ML19250C000

From kanterella
Jump to navigation Jump to search
LER 79-097/03L-0:on 791004,steam & Feedwater Rupture Control Sys Channel Supply Failed,Resulting in Half Trip.Caused by Failure of Sorenson Power Supply Which Provides Volt in Channel 4.Power Supply Replaced
ML19250C000
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/30/1979
From: Eldred D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19250B996 List:
References
LER-79-097-03L, LER-79-97-3L, NUDOCS 7911060377
Download: ML19250C000 (2)


Text