Letter Sequence Withdrawal |
---|
|
|
|
Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] |
Text
August 14, 2019 Mr. Paul Fessler Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI 2 - WITHDRAWAL OF REQUESTED LICENSING ACTION RE:
SUBMITTAL OF VALVE RELIEF REQUESTS FOR THE INSERVICE TESTING PROGRAM FOURTH 10-YEAR INTERVAL (EPID L-2019-LLR-0056 AND L-2019-LLR-0058)
Dear Mr. Fessler:
By letter dated June 14, 2019, DTE Energy Company (DTE) submitted an application containing four relief requests (RRs) for Fermi 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19165A134). The requested RRs are:
VRR-004, Relief to Utilize Diagnostic Testing to Confirm Obturator Verification VRR-006, Alternative for Preservice Testing of Butterfly Valves VRR-007, Relief from Conducting Obturator Verification for Certain Power Operated Valves VRR-009, Alternative for Motor Operated Valve Preservice/Inservice Testing The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the U.S. Nuclear Regulatory Commission (NRC) staff to complete its detailed technical review. The purpose of this letter is to provide the results of the staffs acceptance review which is intended to identify whether the application has any clear information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
By email dated, July 16, 2019, NRC staff notified you by email (ADAMs Accession No. ML19197A348) that VRR-006 and VRR-009 contained sufficient information to start the technical review.
P. Fessler By letter dated August 7, 2019, you requested the withdrawal of RRs VRR-004 and VRR-009 (ADAMS Accession No. ML19219A104). The NRC staff acknowledges your request and the associated Cost Activity Code number has been closed; however, if you decide to re-submit the request, it should include the following information:
RR VRR-004 DTE requested relief from the requirement in ASME OM Code [American Society of Mechanical Engineers Operation and Maintenance Code], ISTC-3700, Position Verification Testing, and 10 CFR 50.55a(b)(3)(xi), OM Condition: Valve Position Indication, for the 23 valves listed in the RR. DTE requested to use diagnostic testing instead of local observation and other indications of obturator movement, and to perform obturator verification every 10 years or less rather than the 2-year position indication test frequency of ISTC-3700.
(a) The description of diagnostic testing to be performed and the methods used to complete the obturator verification requirement is not sufficiently described for the valves.
(b) The application states that the diagnostic interval can reach a maximum frequency of 10 years based on the currently recommended ASME OM Code 2017 Edition Appendix IV for high safety significant valves.
- i. It is not clear to the NRC staff if Fermi 2 will adopt the ASME OM Code 2017 Edition Mandatory Appendix IV requirements for the 23 valves listed. If so, Appendix IV still requires obturator verification per ISTC-3700 every 2 years.
Explanation of exceeding this interval and the reasons why it is acceptable is needed.
ii. The maximum diagnostic test interval frequency in Appendix IV is 10 years. The RR contains no discussion of how the interval is established (e.g., are there two successful tests at a reduced interval before extending?). There is also no discussion of how a valve test failure will affect the test interval. Does the test interval consider valve risk and margin?
iii. The alternative request mixes portions of mandatory Appendix III requirements with Appendix IV. The request needs to be more specific regarding which Appendix is being requested.
(c) The NRC staff considers the proposal to be an alternative to the ASME OM Code requirements. Please clarify if the request is an alternative request pursuant to 10 CFR 50.55a(z) or some other regulation.
RR VRR-007 DTE requested relief from 10 CFR 50.55a(b)(3)(xi) for obturator position verification for 63 valves listed in the RR. DTE proposed to supplement valve position indication with other indications to provide assurance of proper obturator position, except in those cases identified in the RR where obturator verification is not necessary or results in a hardship or unusual difficulty without a compensating increase in the level of quality and safety. In an attachment to the RR, DTE provided its description of the various bases for each valve to
P. Fessler exclude obturator position verification through other indications as required by 10 CFR 50.55a(b)(3)(xi).
The description of the alternative indications that will be used to provide assurance of proper obturator position and the methods used to complete the obturator verification requirement is not sufficiently described for the valves for the NRC staff to make complete its acceptance review.
If you have any questions, please contact the Project Manager, Sujata Goetz, at (301) 415-8004.
Sincerely,
/RA/
Sujata Goetz, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-341 cc: Listserv
ML19219A775 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME SGoetz SRohrer LRegner For Weibe SGoetz DATE 8/13/19 8/12/19 8/14/19 8/14/19