License Amendment Request to Revise the Company Name
ML19214A046
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/30/2019
From: Mark D. Sartain
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
19-300
Download: ML19214A046 (33)


Text

Dominion Energy South Carolina, Inc.

5000 Dominion Boulevard. Glen Allen, VA 23060 Dominion Energy.com July 30, 2019 U.S. Nuclear Regulatory Commission SeJial No.19-300 Attention: Document Control Desk NRA/MAE R4 Washington, DC 20555 Docket No. 50-395 License No. NPF-12 SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 LICENSE AMENDMENT REQUEST TO REVISE THE COMPANY NAME In a letter dated April 15, 2019 (Serial No.19-168) South Carolina Electric & Gas Company (SCE&G) notified the NRC of a name change. Specifically with respect to this amendment request, the* 1etter provided notification that SCE&G would be changing its name to Dominion Energy South Carolina, Inc. (DESC) and that SCE&G would be requesting a license amendment to reflect this name change.

In accordance with the provisions of 10 CFR 50.90, SCE&G requests an amendment to Facility Operating License NPF-12 for Virgil C. Summer Nuclear Station (VCSNS) Unit 1 to reflect the change to SCE&G's name. An evaluation of the requested amendment is provided in Attachment 1. Attachment 2 provides a mark-up of the license pages showing the changes.

The proposed amendment does not involve a Significant Hazards Consideration under the standards set forth in 10 CFR 50.92. The proposed changes have been reviewed and approved by the VCSNS Plant Safety Review Committee.

In accordance with 10 CFR 50.91 (b), a copy of this license amendment request is being provided to the State of South Carolina.

Serial No: 19-300 Docket Nos. 50-395 Page 2 of 3 Should you have any questions in regard to this submittal, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Mark D. Sartain Vice President- Nuclear Engineering & Fleet Support Dominion Energy South Carolina, Inc.

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering & Fleet Support of Dominion Energy South Carolina, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document on behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this  :>O;.l...day of - \

~u ~ , 2019. J, (\ _

My Commission Expires: t1ttf'l6-t' ~I.7 2019 ~90""..,_~-..~--------..-*"""""'

/ Nota(y~ GARY DON MILLER Notary Public Commonwealth of Virginia Reg. # 7629412 Attachments: My Oommlulon Expires August 31, 20.CS

1. Evaluation of Proposed License Amendment
2. Marked-Up VCSNS Unit 1 Operating License Pages Commitments made in this letter: None

Serial No: 19-300 Docket Nos. 50-395 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave; NE Suite 1200 Atlanta, GA 30303-1257 Mr. Shawn A. Williams NRC Project Manager U.S. Nuclear Regulatory Commission, Mail Stop 08 81A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Virgil C. Summer Nuclear Station Ms. Anuradha Nair-Gimmi Bureau of Environmental Health Services South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 Mr. G. J. Lindamood Santee Cooper - Nuclear Coordinator 1 Riverwood Drive Moncks Corner, SC 29461

Serial No: 19-300 Docket Nos: 50-395 ATTACHMENT 1 EVALUATION OF PROPOSED LICENSE AMENDMENT SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1

Serial No.19-300 Docket Nos. 50-395

  • Attachment 1, Page 1 of 4 EVALUATION OF PROPOSED LICENSE AMENDMENT 1.0 Summary Description In accordance with the provisions of 10 CFR 50.90, South Carolina Electric & Gas Company (SCE&G) is submitting a license amendment request to amend Facility Operating License NPF-12 for Virgil C. Summer Nuclear Station (VCSNS) Unit 1. The amendment would revise the license to change the name of "South Carolina Electric &

Gas Company" to "D.ominion ErJergy South Carolina, Inc."

2.0 Description of the Proposed Change The proposed license amendments would replace "South Carolina Electric & Gas Company" with "Dominion Energy South Carolina, Inc." where appropriate in the license.

References to South Carolina Electric & Gas Company or to SCE&G in the Facility Operating License for V.C. Summer are marked with an asterisk to indicate that on April 29, 2019 the name "South Carolina Electric & Gas Company" was changed to "Dominion Energy South Carolina, Inc." . Other references to South Carolina Electric & Gas Company or SCE&G contained in the Renewed Facility Operating License, including to the Renewed Operating License No. NPF-12, Technical Specifications Section 5, "Design Features", the Environmental Protection Plan in Appendix B (VCSNS Unit 1), and Appendix C, "Additional Conditions Renewed Operating License No. NPF-12" have been changed to reflect the new name "Dominion Energy South Carolina, Inc."

or "DESC."

A mark-up of the proposed changes to the VCSNS Unit 1 license are provided in .

3.0 Background On January 25, 2018 SCE&G submitted a letter requesting transfer of control of Operating License No. NPF-12 for the Virgil C. Summer Nuclear Station which was owned oy South Carolina Electric & Gas Company (SCE&G), a subsidiary of SCANA Corporation. In a letter dated August 30, 2018 the Nuclear Regulatory Commission (NRC) approved the proposed indirect transfer of control of Renewed Facility Operating License and issued an Order to VCSNS Unit 1 and a Safety Evaluation 1. On January 1, 2019 Dominion Energy, Inc. purchased SCANA Corporation. Subsequently, on April 26, 2019 Dominion Energy filed with the State of South Carolina to change the name "South Carolina Electric & Gas Company" to "Dominion Energy South Carolina, Inc." effective April 29, 2019.

1 On September 6, 2018, the South Carolina Electric and Gas Company (SCE&G) informed the NRC of an error in the Safety Evaluation and Orders. On September 24, 2018 the NRC issued Virgil C. Summer Nuclear Station -

Correction to the Safety Evaluation and the Orders Approving Indirect Transfer of Licenses.

Serial No.19-300 Docket Nos. 50-395 Attachment 1, Page 2 of 4 This is a name change only. The corporate existence of SCE&G continues uninterrupted.

and all of their legal characteristics remain the same. The name change does not involve any change to the ownership, management (including officers and directors),

organization, operation, obligations, rights or liabilities of the companies; nor are there any changes in the function of this company, or the way it does business. Therefore, the name change does not constitute any transfer, either direct or indirect through a transfer of control, of the license that would require NRC consent under 10 C.F.R. 50.80.

The name change does not affect SCE&G's financial qualifications or decommissioning funding assurance, or otherwise impact SCE&G's ability to comply with any of its obligations or responsibilities under the Facility Operating License. The proposed amendments do not alter any technical content of the license or have any effect on the design, function, or operation of plant systems, structures or components or on the current licensing basis of the unit. Based on these considerations, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

4.0 No Significant Hazards Consideration The proposed license amendments would replace "South Carolina Electric & Gas Company" with "Dominion Energy South Carolina, Inc." where appropriate in the license.

References to South Carolina Electric & Gas Company or to SCE&G in the Facility Operating License are marked with an asterisk to indicate that on April 29, 2019 the name "South Carolina Electric & Gas Company" was changed to "Dominion Energy South Carolina, Inc." Other references to South Carolina Electric & Gas Company or SCE&G contained in the Renewed Facility Operating License, including Attachment 1 to the Renewed Operating License No. NPF-12, Technical Specifications Section 5, Design Features, the Environmental Protection Plan in Appendix B (VCSNS Unit 1), and Appendix C, Additional Conditions Renewed Operating License No. NPF-12 have been changed to reflect the new name "Dominion Energy South Carolina, Inc." or "DESC."

Where appropriate to preserve the historical context of activities in the license that SCE&G requested, completed, or was assigned, the term SCE&G has not changed.

According to 10 CFR 50.92(c), a proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:

1. Involve a significant increase in the probability or consequences of an accident previously evaluated; or
2. Create the possibility of a new or different kind of accident from any accident previously evaluated; or

Serial No.19-300 Docket Nos. 50-395 Attachment 1, Page 3 of 4

3. Involve a significant reduction in a margin of safety.

In support of this determination, an evaluation of each of the three criteria set forth in 10 CFR 50.92(c) is provided below with respect to the proposed license amendments.

Criterion 1 Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed amendment is administrative in nature. SCE&G, which has been renamed Dominion Energy South Carolina, Inc., will remain the licensee authorized to operate and possess VCSNS Unit 1, and its functions, powers, resources and management as described in the license will not change. The proposed changes do not adversely affect accident initiators or precursors, and do not alter the design assumptions, conditions, or configuration of the plant or the manner in which the plant is operated and maintained. The ability of structures, systems, and components to perform their intended safety functions is not altered or prevented by the proposed changes, and the assumptions used in determining the radiological consequences of previously evaluated accidents are not affected.

Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

Criterion 2 Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed amendment is purely administrative in nature. The functions of the licensee will not change. These changes do not involve any physical alteration of the plant (i.e., no new or different type of equipment will be installed), and installed equipment is not being operated in a new or different manner. Thus, no new failure modes are introduced. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

Criterion 3 Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No

Serial No.19-300 Docket Nos. 50-395 Attachment 1, Page 4 of 4 The proposed amendment is administrative in nature. SCE&G, which has been renamed Dominion Energy South Carolina, Inc., will remain the licensee authorized to operate and possess the units, and its functions as described in the license will not change. The proposed changes do not alter the manner in which safety limits, limiting safety system settings, or limiting conditions for operation are determined. There are no changes to setpoints at which protective actions are initiated, and the operability requirements for equipment assumed to operate for accident mitigation are not affected.

Therefore, the proposed changes do not involve a sig nificant reduction in a margin of safety.

Conclusion Based upon evaluation of these criteria, SCE&G concludes that the proposed amendment presents no significant hazards under the standards set forth in 10 C.F.R. 50.92(c) and, accordingly, a finding of "no significant hazards consideration" is justified.

5.0 Environmental Consideration The requested license amendments are administrative in nature and limited to changing the name of a licensee. Accordingly, the amendments meet the categorical exclusion in 10 C.F.R. 51.22(c)(10)(iii). Therefore, pursuant to 10 C.F.R. 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the requested amendments.

6.0 References None 7 .0 Precedence Dominion Nuclear Connecticut, Inc. Millstone Power Station Units 1, 2, and 3 License Amendment Request to Revise the Company Name dated June 15, 2017 (ML17171A232) (Approved on February 26, 2018, ML18038B200)

Serial No: 19-300 Docket Nos. 50-395 ATTACHMENT 2 MARKED-UP VCSNS UNIT 1 LICENSE PAGES SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1

. . . "UNITED STATES

. D9min.ion Energy*

.. *,""--" .NUCLEAR REGULATORY: COMMISSION-WASHING_TON, :DC 2035? . *. South Carolina,_ Inc.

SOUTH.CAROLINA ELECTRIC & GAS COMPANY :

.**soUTH CAROLINA "PUBLIC SERVICE AUTHORITY .*

. .: . DOCKET N0/.50-395.

. VIRGIL C. SUMMER NUCLEAR STATION. UNIT N0.-1: *

  • RENEWED FACILITY OPERATING LICENSE NO: NPF-12 **

1'. .. . The .u:s. Nucl~ar. Regula(oiy Commission (the Commission or the NRC) having: .

previoiJ$ly rriade*thefiridlngssetforthin License No;f\lf>F~12 lssuedAugust6, 1982~ * . . .

. has now found.that:. : *> .. : .*.*. * . * .:.. ** :* ** ***. * : * . :* . : * *!See.Note 2 f A.: :The ~pplication~ci renew License.No*.:NPF-12 fUedby South Garoliria Elect~ic & .*...*...**

  • .*: Gas Company2acting fo.r itself and South Carolina*Publlc:Seniic.eAutho.rity (the
  • .*ucensees) complies :with the standar~s and requirements _of. the Atomic* Energy .

.*Act.of 1954, *as amendeti (the Act), arid the Commission's regulations set fo~h in .. :

1o CFR Chapter I, arid all required notifications to other agencies or bodies have ** *
    • been doty*made; :*:.. . . . . . . . . . . . . . . . . . . .

. B. * .. Actions t)ave been identified and have ~een or will. ~e taken Yiith .respect to . .

.. *: (1) managing the E!ffects of aging during the period of extended operation on the_*_ ..

.functionality Qf ~tructures and con:,poilents that have beeri Identified to require * .

  • review.under 10 CFR 54~2t(a)(1), and-(.2) ti~e-limited aging analysestliat have.-

.. "-'--'  : been ldetjtified to require reviejw i.mder 10 CFR 54.21(c), :such that there is* * . . .

  • reasonable assurance -that the activities authoriz~ _by this renewed license will ***

. . *: continue to. be conducted :in accordance with the current licensing basis~ as * .. : ..

  • :.defined hi 10 CFR .54.3, for Virgil C. Summer Nuclear*Station :(V. C. Summer),*
      • µnit 1, _and tJ,atanY-~hanges made to the_planfscurrent licensing basis:1n order*-**

. to comply with.10 CFR 54.29(a) are:in:accord with*the Act and the Commission's

  • :.regulatio.ris; **

. C. The facility will ~perale in conformity ~ith the application, *as amended, the *.

..: provisions of the Act, andfhe. rules and regulations of. the Commission; ; * *

    • D. *** Tliere is rea.sonable as*surance: *(i) tliat th~ activities authorized* by this r~newed *.
operating license am be* conducted without endangering the health: and :safety of the public, and (ii) that such activities will be *conducted in compliance with the rules and regulations of the Com.mission; . . . .. . .

. . . . .. . . . . . Dominio_n Energy So_uth_ Carolina, Inc .

. E.* .South CaroliAa EleolliE) & Gas: Cemp"aay; .technically-qualified to e"ngage in the ...

. . _activities authorizeffby this renewed operating license in aqcordance with the *...

. rules*and regulati_ons:of.the commission; . . .

Domin.ion Energy*_South Carolina; Irie..

1.South *caroiina Elootrio & Gas*oo~paAy s ~t,ith9rized. to act as ~gerit for tlie South .. :

    • carolina Public .Service Authority*and*has exclusive responsibility arid control over the*

. physical construction; operation and maintenance of the facility. *. . * *

. :. . ReriewecJ .Fa~Uity Operating Liceris~. N_o*. NPF~12 ..*..

2 01'1 April 2°9, 2019 "Soµth Carolina .Electric*& .Gas Company (SCE&G} ¢hanged .*.

.it's nanie to: "Deni inion Energy Sou~h Carolina; Inc. (DESC) . . . .

.. ".'2.::

.. '---

  • F. . The licensees have satisfied the applicable provisions of1 OCFA Part 140~ .

. *Financial* Protection* Requirements ancf lnc;len:mity Agre~ments, ~ of. the. *:

  • . Commission's reguiations; .: : . . . . . . . . . . . . . . . .

~- ... *.. Tiie :is~u~nce ot. thi~: renE!Y,/ed. license Wm: not be* inimical to th~

    • . *and sec~rity or'to the health :and safety of the public; * * * **

common* defense * * *

.H.. . .After .weighing the *environrnental,,econo,:nic; tE!chnical; an~ otherber1ef1ts of. the

... facility against environmentaland othetr:costs and:considering available . . * *

.* . alternatives, the Commission:concludes that th.a issuance of .Renewed Facility ..

0:bp~rating License NPF,".12~ s~bje~ to the con~ations to.r.protfictlon.:of th~ . *, : . *.

in

  • environment set forth .herein-*is accordance with 10 CFR Part 51, of the* . .

. Commission's 'regulation$ ~hd ali .appiicable requireinerits :have been: satisfied; : .' .

.and* * ** ** * * * ** * ** **

  • I. . The :reqeipt, poss~ssion, and:use of ~ource, byproduct and:specl.al. nuclear

.. material as authorized .by this renewed license will. be. in. accordance with the . '.

  • .*Coin.mission's regulations In 10 CFRParls 30, 40~ . . . . . .
  • * * * ** * * * * * * * * **.Dominion Energy South Caroliila,*lnc.. *
2.
  • On .the basis of the foregoing findings regarding this fa ility, Facility Operating License*

No. NPF-'12, issued Augu$t 6, 19EJ2~ is superseded *b enewe~ Facility Operating :

License No; NPF-12, which is.hereby issued to the Sol:llhCarelina Elestrie & Gas

  • Company* and the. South* Carolina PLiblii:: 'Ser:vice .Authority (~e li~ensees) tq *read.as*.*. * * *
  • follows: * * * * * .-'--'---*-*---'--'----*----'---'----'--'----,

.Domin.ion. Energy South Carol.iria; Inc.

  • A. to This renewed liqense appl,ies the \iirgil. C . ummer Nuciear Staticni; Onit 1, a : :

pressurized water reactor and asse>ciate. quipment (the facjlity), o.wned by the

  • sol:llh CafeliAa Eleotrio & Gas CompciAy and South Carolina Public Service Authority. The faciiity is located in i=a:irtieid CountyI South Carolina, and is ..
    • .described.in . Final Safety Analysis .
  • Report, as amend~d thi'ougb No.* aa;* *an. e Environmental: Report; as .* .
  • a.mended througll.Amendment No.:s.*
  • the.

B. to

. :subject the conditions and requirements incorporated herein, the .Commission **

hereby licenses:.* . .  : !Dominion Energy South :Caronna,. :lnc.1.*.

,' . ~< . . .

  • (1) * . South CeFOlina Eleotrie:& Gas Gofflpa:AY (SGE&G~rsuant.to.Secticin. *. l(DESC}I * .'*

.103 of the Act and 1oCFR Part 50, to possess, use~ :and operate the .. . .

... .facU.ity at the designate~ location. ir, Fairfield. County; South* CaroJina, in *. **

  • accordance with the procedures and limitations set forth in .this renewect

. ' license; ' . ' . ' ' ' .. ' . . . .

'(2) . . .South Carolina Public Service Authority to pos5.e~s the fa~ility atthe . :

      • designated location in Fairfield County, South Carolina, .in accordance ***

With the procedures: and l1mitatiQhS set.forth in this renewed liceilse; Renewed Facility Operating license* No. N.PF;.12

  • ~*******

. (3) :.* : SGE8cG; pur~uanito the Act arid 10 C.FR Part 7Q, .to recei\(e:. possess and . *

. use at any time. special nu.clea(mate.rial as ret:1ctor fuel, *in accordan()e . . .

.* with the limitations for storage and amounts required for reactor. . ..

. . . : : : operation; as described* in the Final Safety Analysi*s Report, as amended ** .

i::' ~ : t h r ~ u g h ~rne~drnentNo., a3;
  • ( 4) * *. :* SGE&G, pursuantto the Act and 10 CFR Parts 30, 40 and 70, to receive, *

. . possess and. u~e atany tirtie any byproduct, source and special nuclear

. . . . . . . . . .. *.. . m_aterial as seal.ed neutron *sources forreactot startup, sealed neutron- .

. . . . .... :. . . . * .. : :. sources for reactor instrumentation and radiation monitoring .equipment .. :

  • ~ : c a H b r a t i o n : and:*as fission d~tectors in:amount~_as requir~d-;: .**::*. , . : : *
  • . . . (5) **. sce*&G;*pursuant.to the Ad and 10 CFRParts :30, 40 and70; to receive, .. *

... . . .. .  : .possess and use in aniounts as required any byproduqt, source or sp.ecial ...

.*.* ,.. * *_*_. ,. : *

  • nucJear n:iaterial.witl:iout restriction to chemical. or physical form; for, * *.. * * . :

.: . .. . . ... .. .. : ..* sample analysis cir ihstrument-c~libration *or associated with radioactive : . .

  • ~ appar:alus_or components; and:*.* ._* : :* .. *  :** .*... * .* ...* : *.. *.*  : ... * .*.

. . '(6) .. : SGE&G, pursuant to the 'Act arid 1<l CFR Parts 30, 40 and. 70, to .*. .. ..

  • . possess, but*not separate; such byprocfuct and special nuclei:lrniaterials :*

as may be ptodLiced by the operation Of the facility. * . . . . . .

C .. *. This renewed license ~han'be deeme:d to.contain; and is subje~t to, the

. conditions specified in the Commission's regulations set forth in 1OCF:R .* .

Chapter !"and is subject to all app:licable proyisioris oftt,e Act and to the rule~ *

.. regulations, :and. orders of the Commission now. or hereafter in* effect;* and is ..

  • subject to the additi.onal conditions i;pecJfied or incorporated. below: * *
: ~ Maximum Power Level .. *.* . . _ .* . . .. _ . . . *.**

.SGE&G is authorized to operate. the. facility at rea"ctor core. power levels

hot in excess of2900 megawatts thermal in accordance with the .* . . . .

. co*nditi6ns specified* herein and in .Attachment 1 to. this renewed llcense. :.. *

. *The preoperational tests, startup tests anct other.items 1dentifiedin ..

. Attachment 1 to.this: renewed license shall be completed as*-specified.

  • Attachment 1 is hereby incorporated into this license. *

.(2) *. Technical Specifications and Envirorimerital Protection Plan.

  • * . : The Technical Specifications contained in Appendix A, as revised. through ....
  • ... : * .Amendment No.. 215, and :the Environmental Protection Plan contained in. ;f' ,

. *: Appendix B, are hereby. incorporated *iri .the license.*: SeuU~ GaFOlina * . **: **

. *. Eleetrie & Gas Company shall operat~ the facility 1n accord.ance with tt:ie * .

Technic ... pecifications ,and the* En\/ironniental Protection .Plan> . .

_*Dominion.Energy Sou.th Carolin.a; Inc:*

. Renewed Facility Operating License No.-NPF~12

. . . . *Amendm~nt No. 215 *.

  • . ,-4::. .**.*

. ~ Cond~ctof 'Nor~ Activitie~ [)uring Fu~I Load arid:lnitial St~rtup : * ,. : *

: *_ . :*  :< . _._* :* : SGE&G shall r~vi~~*by ~~m~ittee ~II faciiify oon~tru~tio~. pr~operatio~~I

. .. ....*. testing *. and. system 'demonstration a~Mties p~rformed con.currently with .

. facility initial fuel loading or with the facility startup tesf prog_ram to assure .: .*

.*that the activity will ni:>t affect the safe performance of the facility fuel : *

      • .*
  • IQading or tlJe .portion *of the facility .startup *program being per:tormed. *-

_. The r.eviewshalla~dress;.as.a minim~m. systern int~raction,.sp~il of:-.

..control;* staffing, security~ and health physics, -with respect to the. . -*

  • __ . performance of the actMty 6Qncurr~ntly.witl:l the *tetcility fuel loading or.the:.
  • portion of the facility startup program. being .performed; The committee : *

. for the review shall be composed of at least three members, * -* *.

-. knowledgeable inJhe above areas. and who meet the ql,lalifications for .. *

  • __ . . professi.onal:-techr1ical per~onnel :spe,cifiedby* Section 4.4 of AN$1 *. . .
- *. N18.7-197.1.
  • At lea.st one* of these three shall- be a senior member of the .
Plant Manager;s staff~ * * * * ** *

--* - ** * * *. - . :(4) *- lnitialTest Program : : . .- :_* -. *- *'* *- --- * * . -' * -- .* -: . -' * -__  : : . '* :_*-_. :..

  • ~ : S G ~ G shall condu~ the pos~fuel-loading inltiaJ'testprogram set forth ln **-

. - . '* Chapter 14 of the Fin_al Safety Analysis Report, as amended through :.

No. 33, without making any:major modifications to this program unless .- -

  • such modifications have been identified an~ have received prior.NRC staff approval. Major modifications are defined as: * * * *

. -_*.-a. -* .*Eiiminatio~ny. tes~*other than: tho~e idEmtifi~d as -no~~essential : -

in Chapter 14 of SGE&G's Final Safety Analysis Report; as*,.: *

amended through_ Amendment-No~ :33, - . .. .

!the

  • .* --*--b; ~ .M-odific~tion~ of test ~bj~ctives;. niethod~ or* accep~nbe c:rite~a for. -- .
  • _* ._ * ~Y test other than_ those identified a:s rion-"essential iri Chapter *14.

. . . . of S'CE&G's :Final Safety Analysis -Report, as amended through *. *-.

.Am~ndmerit No. 33, * * * * ** * * * *

-~; :Pertor~ance :of any test at a power level: diff~re~t from ,he po~er:.: *

  • _level indicated in the*describ.ed .

p'rogram; and.. . ...

.. d. * >Failure to:complete ~ny iests included in *ihe described ~rogratn

  • _.*

.(pliitnned or scheduled for power levels up to' the authorized power: ..

level). *. * * * * *

  • ___ . ._* For the performance of startup testing as dE3~cribed in Table ,14,1:-75 of

-, __

  • th_e Final 'Safety,Analysis Report~ as amendedthro*ugh Amendment,_*

-*_ No. 33;* cc;,mplianpe wJth items $ and 4 of Tabl'e .3;3.1 of _the.technical-_*

-*Specifications _is notrequired.. * * * * *

  • * * *
  • Ren~wed F,a~illty Op~rating Ucens~.N~.-N~~~12: * * *
  • . :.5-

. ' .. (S) .*. Stability of:ttie West Embankment and its:Effects on tlie Intake Structure'

'*: ~ ...(Seictior12.~5.4;SSE*R.~) .. ' :. . . * .. '>: : . '.: > .*** .*.. :_* ... '*

*  : * * * . _ SCE&G .shall conduct the monitoring program discussed irl Sedion * .

. . . . '* : .2.5.4.10~6.2 of tne*.Final Safety Analysis Report, as amended through Amendment No. 33, to specifically include the following:* . . .. .

.a. * *. . At .the vicinity: of the pumpJ,ou*se ElndihtakE3 ~tructure; four :

.. settlement poirits capable:of monitoring. both horizontal and ..

. ..

  • vertical. movement~ shall'b(:! establish.ad to monit9r the *

. :embankment movements.* ..

... b~ :. . . Ttle submerged* slope profile. of the we~t embankment. over .the :.

. . intake structure shall be established and monitored to detect any .

' . . . unusual movements ttiat may affect the intake strudure..:. . .

. c .. * .. The schedLiie and the reporting requirernents theabov.e .. of

  • ihsp¢ctioli shall be in accordaliqe w~h the rec,;,mmeiidations.. ** *
d. The condition of the intake structure .shall be monitored to detect .*

new cracks and changes to the old grouted or ungrouted cracks. . . .. . .

    • .DESC. . .****Observed ch$n* es* 1en th or width) in existing:pracks aria any . * .*.

,.new cracks shaU be*reporte * *SCE&.G to the NRC staff. The: .

ma>dmum inspection int.erval for this :monitoring of the intake .

. .

  • struct_ure is five (5) years'. _. * ..

.e.

  • The conditi.on of the iotak~ structu(e*shail aiso b~ ,:nonito(ed as* .
  • specified.in (d.)above followi.ng*Emy earthquake during Which the:

' ' . plant seismic instrumentation indicates that the operating basis '

earthquake has been. exceeded. . .. . . . . .. . . . ..

...*Design Verification. Program (Section 3.7.4,. SSER. #5}. **

... Prior t~ Oecemb~r 31, 1982. SCElffi shaH *provid~. a f{nal repo~ to the .

.

  • NRG ~taff. delineating the .final resolution of the actions taken to satisfy. -
    • : *.. the recommendations *of the independent design verification conducted - .

. by.Stone &'Nebster Engineering:Corporation*.. . . . . .

(7) Thermal Sleeves (Section 3.9.3, SSER #5)

. I*  :

.. *1* *.. . .

..  :... _.Prio:r io startup. after the first :refueling outage, SCE&t. sh~II provid~, fot .:*:*

  • .. : . NRC staff review. .and approval, justification for continued operation with

~~ tht3riTietl sleeves*rer'noved from seiept~d *nozzles*in:the reactor coolant .

. system. : *. '

  • .. *Rene~ed FacilltyOp1:m1ting Licemse No~ NPF-.12 .** *
  • On April 29, 2019 "South G~rolinaEl~Gtric.&Gas Cornpar:iy" (~C~BtG)'ct,ahg~d - * **

. : it'.s:name to,rDorninion Energy South Carolina, *1nc.: . . . . . . .

.' a. '. . ' SCE&G shall ci>mplete ali actions' related :to: ~nvironniental

  • . qual1fication.ofequipme11t 01') a:!:>ChedulEfspecifie<;t in Section 3;_11 :: -

of Supplemenf4 fo the Safety ~valuation Report. * : : : . _ : _

-. ---. b. : ---- *. Conipl~te and ~ s h a l l b ~ avaH~ble and maintained.:**:_ .-

at a central location by SCE&G. Such records. shall describe the .

  • environ.mental q1,1alifi~tion_methods used for*an safety-related .

.. electrical.equipment in sufficlerit_detail to do_curnei')t the degree of compliance with NUREG~05BB;"lnterim Staff Position ori _- - .

Environrnental Qualification of Safety-Related :Electricai .*

  • .. l:quiprrient," Revision 1, datecf July _1981_. Such records stiall l:>e*

updated and malntained current as equipment is' replaced~ further

tested, or otherwise further qualified to document compliance with. :. '

=~~~==fi~~:~J~~:=n:

NUREG-0588._ - . - - -. .. - .

'-* y .* I - ,_ _ _ _ _ _ _ _ _ _. . . . . . . . __ _ _ _ . , . ._ __

"""--'-""""---'---""'"' c; Outage <.**

    • provisio_ns of NUREG-0588 (or:safety-related electrical equipment:

expe>sed to a harsh environment. ' ' ' . ' ' ' '

' . . l*....-,-.;..;.,-,'"----,,,-:I: _ * (9) * * ._. Mechanical Performance (Section 4.2.3, SER) . -

  • * *-:.-- -  : Prior to suirtup atter the first refueling aut~ge. sc~c!& ~ha11 e~~in~ fue1 ..
.. : rods for baffle-jetting failure as specified in Section :4;2;3 of the Safety *
  • .Evaluation Report. Should damage be observed atthat time, a corrective :
  • _. actio_n pJan s~all bE3 subrnittedto the NRC staff for_ revietw and approval. : * *

-,.....,*-,-....,........,-.,...-,,* . _.: (10): _Ov'erpressuriZation Protection (Sectibn 5.2~2. SSER 4) ..

- - ~ - - - ' :i-1.""."". - __ . . . , . . . . - - , _ - _"".""_p'."""-rip-r"".""t-o,-S"".""ta_rt__ fu.,...:e-U-ng""."".-o-:tit-:-~-g-e-.*s_C_E__.:~....._-shall in.stall an -*-

u_p_a_ft_e_r...,.th.,...e-_fi-"r"".""st.,...r-e....
  • -.* NRC staff-approved low-temperature overpressu:rization .protection. ***

-*system; Toe preliminary design shall be provided for NRC staff.review -

not l~ter than June 30,. 19~;* . * * * * * * *

-_ >(11) lr1service Inspection -and Testing (Section 5.2A SSE.A 3) :

  • . I:.. *. :-S~E~ shaii: p.erfon11 the 'foll~wing acti~ns in conjunction with the fir.st ..

'.inservice'!:3xamination: ' . ' . ' . . . . ' '

a. * * . Demonstrate the ability of the. ultrasonic -examination procedure to -.-.

detect actual flaws' and/or artificial reflectors in the volume subject to examination to theacceptance standards of Paragraph _

. -.. IWB:-3509 in weldments representative o.f the design and: .

materials of construction.

. *R_enewed Facility . Operating . license No. NPE=~12

.-:_ :".On April.29, *201 ~ "South Carolina El_ectric & Gas Comp,;my" (SCE&G) changed

Ws .

name*:to***oominion Energy .South Carolina, *1nc_;,.

' -7~

  • b. * .* I~ the* event that one~thii.d thickri~ss semi-drcu*lat refe:rence .flaws .: ..

._cannot:be detected and discriminated from inherent.anomalies, ... *

.. : .the entir.e _v6h,nne 9f the weld shall be' e>eamin~d dµring the. .

.. inservice: inspection; . . ' . . ' . . .. .

c.
  • The reporting.*ofthe inservice inspection examination results shali
.. be.:do,curtiented* in'~. ma,nhertq define, q'ualitatively' whether,' the.'
weldment and the heat affected zone and adjacent base:*metal on.*. *
  • both sid~s *of the w~ld were .examined by ultrasonic angle bearri :
. techniques. . . . ' . . ' .
  • ~ 9 ) : ** (?esiqn.Descri.otion*~_control(Sectidn:4.3.2. SERL ... * * : *.. <..* :*:

. ~ :_ . ?:sce&Gjs prQhibite_dfrom~~ingpart-lengthJOd*s dLiri.ng'p~wer 6peraii6n*

.*(13)* . Deleited (14) .. Del$ted * :*

(15) Deleted (16)

  • Cable Tray Separatic)n (Section 8.3.3; SSER 4) *.. .

I.__*_ _ ___.r*

.*:Prior to*startupafter the first refueling:outage,.SCE~ sh~ll-im~l~~erit',

. : :the modifications tottie cable trays discussed in*f>ection. 8.3'.3 of . .*

Supplement No. 4 to the Safety Evaluation* Report or demonstrate to the

. . .*: NRC _staff that faults induced in :non-dass 1' E cable trays *will not result in

:ta_ilure of cable in the *adjacent: Class 1E ca:ble* .trays. . . . . . . . . . .
r. *.* *.

.*,,_1*_*....,..,.-.. . . . . *. . '(17)' :Alternate Shutdown Sys_ternSeciion'9.5.1, SSER4):

  • 'Prior to ~tartup after the first*retuelirig.outage, SCE~ shall ir'.,stall a . '

source range neutrdri-tluxm6nitor independent of. the control complex as ** :

part.of th.e:alternate shutdown system: . . . . . . .

. (18}.. *. Fire .Protedion. Program *

[)ominion Energy South a

. Seuth Caroll A Eleetrie & Gas CempaA{shall implement an_d maintain iri *.

  • Cc;irolina, Inc. * . effect all provisions of .the approved fire protection *program that comply
  • with'to CFR _50.48{a)and 10 CFR 5CL48(c),. as specified 1h.the,licensee

. * . amendment request dated :11/15/11 (and supplements dated 1~26/12, .* .. .

. 10/i 0/12 2/1/13 *4/1 /13 **10/14/13

  • 11 /26/13 1/9/14 2/25/14r 5/2/14, ' . *. * .. .

, , ' . ., I. . '. . I . I , .

5/11/14, 8/14/14, 10/9/14; and 12/11/14} and as*approved in.the safety ..

. evaluation .report dated 02/1.1)15. ~ *_ Except where NRG *approval for .

changes or deviations is req~ited.by 10:ci=R50.4~(c}, and provided rio .**.

  • other regulation, teclinical specification,. license condition. *or requirement
  • would. require .prior. NRG approv~I. *the licensee may make chcuiges to the... . .

changes s.~tisfy _the provisions set forth inJ.O CFR 'SOAB(a) and)O C.FR

. :50.48:{c), the change does not require*a: change to~ te.chnicf:i.l : *. . ..

  • . specification or a license .condition,. and the criteria. listed below :are .

. . satisfied. . ' . . . . . . .. . ' . . . . .. . ..

    • ** Oh April 2_9; 2019* 11 South c*aroHna Electric&* Gas Comp~ny". (SCE&G) chci'nged: *.

it's riame to "Dominion Eriergy :South Carolina, lnc}'i * . . . . . . . . .

. .. . . . .. . .. Renewed Fciclfity Operc1ting -~ic*er1se*No; :.NPF,~_12 . **

. The lic:e*nse~ mayUse.an ~ngineering evaluatibn.te> . * * *

. demonst.rate thatchanges to certain NFPA. 805,Ch.apter 3; .: ..

  • el1?ments are ~cceptable becf.luse. the alternative i~. !'adequate .

. .for the -hazard/' Ptior*NRC review and approval would not be

' requir$d foralt~fo~tives to four speciflc sections'ot'NFPAamt .

.

  • Chapter 3,' 'tor *which an eriginEiering* evalliaUon. demon~trates *..
  • .that the alterhativ.e to the Chaptei3 elenienfls adequate for..: .*

the hazard. A qµa]ified fire protectiorfengirieer shall approve .

.. the engineering evaluation 'and conclude that the change has '

  • nota~ected the functionality of the component; sysJern; . *. :*
  • :* procedwe, or physical arrangement, using a relevl;lnt technical

.*

  • requirement or standard~** The four specific _sections of *N_FPA* ... *.

. 805;- Chapter 3, .are as follows: . .

  • . :Fire Alarm:and Oetection Systems (Section ~ta);' . .

.* _**Automatic and' Manu'al Wat~r-Bas~d Fir~. Suppres.slori 5.ystems* (S!;!ction 3.9);: * * * : * . :. *.. * : * ...... *.. *. :* * .*.

  • .. *GaE;eous Fire. E,uppression Systems (Section .3.1 O); and;
    • .Pa~sive Fire Protection°-Features :(section. 3.11 ): .*

. This Ucense Condition does not apply"to _any demonstrat[on of equivalency.unde(Section 1.7 of NFPA *aos. *

2. *. Fire Protection Program Changes that Have No'More than:

Minimai Risk Impact ... . ... . . .

. Pri6r N RC re~ew arid approval are nofrequir~d *for changes :

' to the licensee's fire. ptot~ctro.n program' that tiav~ been . ' . '

' demonstrated to have .no more than a minimal risk impact. .

. . The lice.nsee r'n$y:µse its screeriingprocess as aoorovecl in :

_ths NRC safety evaluation dated_ f ~bruary 11; 2015 ~- * * * ...

The. licensee $hall ensure that fire' prote.ction aefensewin-:depth

  • . rmd saf$ty margins ~re maintained when changes.are made:

. to the fire prot~cfion program: . . ' .' '

.: c.. **

  • Transition License*Conditlons -: *.

. . * .1. .Before achieving full .compliance with 10. CFR50.48(c), as ...

. specified by C.2.anc;I C..3 belO""'., risk-informed changes to the .*

. *licensee's fire protection program may not be: mStde Withou.t ** *

  • prior NRC review and approval unless the change has been :

.*. demonstrateci to have no more th~fl a rnin1mStl risk'imp!:lct, as descii.bed in b.2 above. :. -'- . . . . . . ..

2. * . *Theflicensee sha .*
  • ptement the modific_ations to.its facility; ...*
  • as described i.ri.Attac
  • ent S, Tabl.e S-:-1; "Plant Modifications
  • *committed;'? of SQE&G letter RC-t4-0t96, *datedbecerr,ber.

-t1, 2014, by the end of the *calendar year 2015. *The licensee . *

  • shall.maintain appropriate. c6mpen${:)toiy mei:lsures in .place** *

. 'untll completion of.these{ modifications;*: . . . '

  • 'On April-29, 2019 South Carolina Electric.& (,as :Company (SCE&G) changed .

'it's name t~ "Dominion*Energy South Qa.rolina*, Inc." *

  • Henewed*Facility Operating License No. NPF~12.* *

. 3, .. -. Ttie licensee ~hall implement ite .... d in AttachmentS; table -*

  • . -8~2 * ."Implementation Items," of SCE&G letter:RC.;14-01~16, dated .

. *. : J)eceniber 11; 2014, .to complete the transition to full compliance with .10 CFR. 50.4B(c) by March 3(2016 as follows: . . ..

a: Items *3, 6, 7, a; 10, 13; 14, 17, 19, and 21 within 180" days* :

of NRC approvaL  : . . . . .. . . * * ... . .

  • b:: . Items 1, 2, 4, 11, and 12 by .December 31, 2015>

c: Items 5, 15, ta, 18; 20, 22, and 23 by March 3t; 20.16. * * * *

- (19) :. *:1nstru'mer1t and Control Vibration Tests for Emergency Diesel Engine>.

  • Auxiliary Support Systems (Section 9;5A, SER) -. . . . . . - . . . * ... *. * . ..
  • .. *I* .. r* .. . .::Prior to startu~ 'after :the first refueling outage, SCE~ shall either provide : ..
test results imp results of an~lyses to th~ NRC stafffor r~view and .

'approval which validat.e thatthe skid-mounted control panels arid ..

. mounted equipmenthave been :developed, tested, and qualified for**

      • *operation* under severe vi~ational stresses encountered d1,1ring diesei :*::

engine*operation; or SCE G shall floor mount the control panels .. *. _.* .. *

  • presently furnished with the diesel generators separate fror:n .the skid on. a. *.

vibration~free floor.area:*. . . . . . */

(20) . :Solid Radioactive WasteTreatment System (SecUon *11.2.3, SSER 4) .  : *.

.*.. ScEtG shaUnotship wet soUd wast.es from the fa~iliiy untffthe NR~ .* .

staff has reviewed *and approved the process control program foi'the .

cementsoltdificationsystem. . . .. . .. . .. . . ...
  • * (21)*. Process.and*EfflLientRadiological Monitoring and Sampling Systems_.*.*.*

(Section 11 ~3. SSER 4) . . . - : . : . . . *. . . . . - : . . .. . .:

. : * .__I~_ ____.I .... Pdor to startup afterthe first refueli.rig ou~age, scE?G shall instalLand ....

calibrate the condensate demineralizer. backwash effluent monitor . .

.RM-L11 .. _.* . . . . . . . . . .

(22) .

  • Core Reactivity Insertion Events (Section 15.2.4, SSER 4)
  • 1 **

.*. For operations above 90%~offull power, SCEiG sh~II cont;orthe rea6tor

  • manually orthe rods.shall be out greater than.215 steps.until written . .
    • * *
  • approval is received from the NRC staff authorizing _removal*of_this -** * *
      • . restriction; (23)
  • . * *....._I*----,-,-----'. I. SCE~ sh~II co~pl~te the following condition's to the satisfaction of the .. . .

Nl=1c staff, Each iten{references the related. subpart Section *22 of the ot'

  • .. :SER aric:Yor it$ supplements> ::_* . . * * * * * **

. a:* . Procedures for Transien.ts and Accidents*c1.c.1; SSER 4} *.

-.. - I.__**-----,-,-~=I*

  • . *Prior to ~tartup *after ~he.first r~fueling outage', scEt'G sh.all-*

.*. *iiilplenient.¢mergency operating procedure:s t;)ased Ori guidelines ..

. ,

  • approved by the NRCstaff.. : . . . - .

._ .. . .. . .. .**.. . . .. . . .. . . .. . .. _. . ._ Reill3wed FacUity Operating Ucense No~ NPF-12 *

.

  • On April 29i 2019 11South Carolina Electric*& ~as Company" (SGE&G) changed**

. it's name to "Dominion Energy-Southqarolina,: Inc;" . . . . . ..

..* -:9':"

  • b.: *.. Special Low Power Testing and Training (LG.1; SSER'4): . . . .

I** ..

  • I:
  • \l\lit~nths:tonowing co~p1e11on. of.the startu~ test' . * .
  • . program, SCE&G shall provide areport describing the* results of a
  • . coniparis9ri of actual plant data ta!(eh d~ring the natur~I: :* *

.. ........I;,* . I:.- . '.' . . circi.Jlatioretest program to the sirruJlator responses described in ... '

  • *.. the SCE& *letter, T'.*C. Nichols, Jr. to H~ R*Dentorfdated* . ** : .
  • March 31 1982. * * * * * * * * * * ** * *

. ,*, I . . .

  • *
  • c. * *. . DirecHndication of$afetyValve P~sition (11.0.3; SSER4) .

.

  • Priorto. exceeding 5 percent of full *power, the safety valve . . .

. po~ition indication system shall be. sei;miically qualified by SCE&(3 to

.*. consistent with t_hecomponent or system VoJhi_ch'it is attached;

  • and documentation of this. shall be provided to the NRC staff for . * *

.. _reviewancj Elppr(?val,.. . . . .. . ... . ...

  • . d; . . Inadequate Core Cooling instruments (11.F.2, SSER 4)

.* Prior to startup a ~ t major sh~tdown ~r refu~ling ou~ge *

  • after. June ao;.t983, SCl;&G shall:coniplete µp*gradirig qfthe

'. incore thermocouple wiring and qualification of isolators, ..... ' ..

    • reference junction bc>>c.es and. connectors: : *
    • e. *..
  • Plalit~Specific* *calculations. for Compliance with 1OCi=R *section **
  • 1-~_-.____*1.,......._--__,.....,..:*.....,.*so_*.~46nLK.3.31.SSER1):
  • Within .. * . ear aftefmodel revisions are approved by the.NRG- .

. staff, SCE G sti~II provjde a supplemental plant-specific analysis .

. ti:> verify compliance with 10. CFR 50:46, using the revised models . **.

developed under item 11.K;3:30 Qf_NUREG~Q737. * *

    • * **t. * *Upgrade.Emergency Supp6rt. Facilities (lil:A.1~2; SSER_ 4) *.. *

'.' SCEcffi' shall complete iis erriergency res~o~se fa~ilities. as '

ffjlfows: ' '.. . . . '

  • . (i) . *.
  • * (iii)
  • (24) : . Deleted .

. Renewed Facility Operc1ting Licemse No, NPF-12

  • On April 29, 2019 ".Scn-'t.hCarolin~. Ele¢tric:~ Gas Cor:npariyll (SCE&~) chang¢d
  • it's narrle to "Dominion Energy _South *camlina,* Inc: 11 . . ... ...

'."1.0-:

. * (25) *confirm~ton{Seismj~.Analy~is (ASLB Partial lnitialD~cisiori, *

  • July.20y* l982!.Section VL2): *

'.' *. During the first .year* *~f operati~n;* .SCEte shaU ~u~essfully 6ornplei.e the'.'.

  • conUrniatory program :on plant equipment. and components *within ~he *. *
  • guidelines estat;,lisheld in tt,e fi.ilding$ contained in the ASLB Partiallnitial: :* *
  • Decision* dated July 20; 1982~ to demonstrate to the NRC staff's.* * * . . .

. ,' ~atisfa~ionthat'e>eplicit:safefymargins*exi:stforeachcornpr;>nent . *'*'.

. .*necessary tor shutdov.m and coritinued heat removai 1n the :event of the .:

. : *maximum'poteritial shallow earthquake;:-*

  • (26) . f>.lume Exposure Emergency PlanninqZone (ASL.B.Supplemental Partial.*

. l~itial Decision. Aua.ust 4, 19a2;:sectionVlll.3) * :** .* . * * * * *

. : I*, .. *1*: . . . . . . . . . . . . .

. . .

  • Durin'g :th~ *fi~st y~~r ~f. op.~~~iion, see~ *shaH assur~ that th.e plum~
  • . expC>Sur~* emergen~y planning zone *ha~* been. expanded to include th~.
  • . Kelly Miller; GreenbriarHe.adstart and:Chapiri EIElmeniary,schools and.
  • . the emergency evacuation plans have *been adjustect accordingly'. . '.

(27).

  • Transportation Planning {ASLB Supplemental .Paitial .Initial Decision*...

.. . . ** August 4; 1982, Section Vlll.4):.

  • I..,.*_.-,----_J-1""'.' .. .....__---:--:'*.""""':~:D--u-r-in-:-g._,.J-h--~'"""ti""""rs-t-:-y..,.ea_r__

.. -.-  : o--:.f'-o-p-:-e--:ra-t--io"'"'n-;-S..,.C-E...:~::ii.:G shali assure that the defects* in .** ****.

  • .* franspo,rtat1on planning:diSCl,.ISSed in*Flnding ~4 of.th~ASLB .*. : *, '. .

.*~upplemental *Partial* Initial Decision dated August 4, :1982 havei been:

  • r~edied: * * ** * ** * ** ** * * *

(28). *.* Food Pathway Contamination tASLB Supplemental Partial .Initial

. : Decision,: Auoust4. 1982. Section Vlll.6) *

._I**__

.. *-*______ * :......:1-1-*--~.-._D_u_ri-ng-.-th..,.,e-f-ir-st..,..y-e-.a-,.r.-o-fo..,.p-.e-r-at'."".'io_n_**..,.s-c,.;...,E-*~.::i... ~haU ~ssur~'thafplansto* ** *

'... '*implement remedial and pre\lentlve measures for consumer. protec~ion... ':. '

. against food pathway contamination .have .been formulated and .' . '

.. 'communicated to:the agricultural community... . . . '*.. ' .

. * (29).

  • Siren Alerting System* CASLB Supplemental Partial *Initial .Decision; .

.** August .4. 1982. Section Vllt7l .. * . . .

' 'Prior tq exceedi.ng So/~ offu~r polA.ler; *scE&~ s.hall complete iristallati~ri . '

and

.satisfactory testing of. its siren alerting: system. . ' . .

.. :.. (30) Emergencj/Facilities and Staffinq.CASLB'Supplemental.Partial Initial.

. . Decision. Augusf4, 1982>Section Vlll.8) . . . . .

  • *.__I~_ ___.:rl~--.....;._*.;,._*~* * * * * * '

.' '. SCl;~*Sh~!I corilplete the foUriwing threeUe~s rel~ted io emerg~ncy* ..

  • .. : .* preparedness to. the satisfa~ion *of the f\JRC staff, consistent witf1 the ..

.* ... Supplement No. 2 to the Safety Evaluatie>ri. Report~ page. A.:.13: *:

. . Reriewed*F~~ility Operating Ucense No~ NPF~12 .*

    • ... *on.April 29, 201 ~. South c.arolina E.l~ctric & C3as Compc1nyll(SCE:&G) changed.*. *
  • it'.s name to *"Oominiori.Energy S0:UttiC~rol.ina;.:1n¢.. .. * * * * *

~-H- *..

(i) * * . .Minimum shift manning requirements :

. (iif . Em*ergency response.facilities .

.(iii).* * . Meteorological and_ do.se assessment capability .

(31) .Final NRC Approval of Emergency Preparedness (ASLB Supplemental Partial Initial Decision,.Auqust 4; 1982, SectionVlll:9) . *_.* *

  • Priorto exceeding 5% of full .power,* final NRc:sfaff approval ,Of the state* of ,.
  • emergency preparedness fqrthe Virgil

. required: . ', .. . . . .

c. suni1T1er NuclearStation site* shali be :*:. *..

(32). :*

  • Deleted . *

. (33) .. Emergency Preparedness Exercise: (Section t3.3,SSER #5) * *:

r-l*-.----.-,.1: Priorfo March.3t; 1983, scE?G shaHco~ductan emergericy:exercise.similarto .
    • -:that c.oriducted on May 5, 1982 but which.includes full participation of.the local*.

governments and partial State participation. .*

. IDESC

_.**. J (_34_) _~-

  • . Mitig_ a_tion- Strate.av_. License* Condition .

SGE&G shall develop and maintain' strategies for addressing large fires and *

  • .. explosions and that includ_e the.fol_l_owing key areas:: ' . . .
a. .. Fire fig.hting response:strateg~/witti the following elements: . *.* . .
    • i. * . *. . Pre~detined coordiDated fire response strategy arid guidance _
  • .
  • ii. .. :Assessrrierit of mutual aid fire fighting assets . . .. . . . . .
  • -rn. *Designated staging areas for equipment and materials .* :* .
  • *.. iv: Command and control**
v. Training* of response personnel * .

-b *.

  • Operat_ions to mitigate fuel damage considering* the following:

L * ** Protection and: Lise of personnel assets .*

.. ii. '  :*communications . . . .

  • iii. Minimizing fire-spread iv.. . , : Procedures for implementing integrated fire response.strategy : .

. v. :identification c:if readily~available pre~staged ~quiphleht .

  • vi. Training on integrated fire response.strategy
  • vii: * , Spent fuel poolmitigation measL,Jres .
c.  ::Actions.to minimize *release to include consideration of:
  • . i. * -Water spray scrubqing ii.* :Dose to onsite:responders

.' Renewed Facility"Operating Licerise-NPF:.12 *.*

Revised by l_etter,dated August 23, 2007 .*
    • -
  • On April 29, 2pt9 "South Carolina Electric & Gas Companyll(SCE&G} changed

. *it's name to ;'Oominion Er1ergy South Carolina, Inc.'; . . . . .. . .. .

-11a:-:: :

.* D. < *.. An exerilption*totherequiremerits of Paragraph lil.R4 of Appendix G.to 10 CPR:.

. Part 50 i's described 1n $ectk,n 5.3.fof Suppiem~ht No: t to the Office of Nu~lear .

  • Reactor Regulation's Safety Evaluation Report A limited *exemption to the. .

. *..

  • requirements of Sec:tior:, IV,F.1(b) ofAppendixE.fo 10 CFRPart SO*is.described.:.

in:a l~tterfrom l;LJ. Youngblooq, N~C:to Q. w;*:Dixon, Jr.;:dated Nov.ember 2, :*:

  • *
  • 1982. :These exemptions- are author1zect by law and will not endanger iife or .. * .

. .. .. property or:the common. defense and security and' are otherylii~e 'iri the: pubiic '..

. . interest.* The facility will operate, to the extent authorized herein, in conformity*** .

. . *

  • wi.th:the application, as amended, the provisions of the Act, and.the rules and f _. ~ re:gulation_s ofthe: commiss1ort -'* *... *. . . _*_ * * * . .*. *
IDESC
  • E.
  • SGE&G shall'fully. implement and _maintain in effect- all provisions of -the ..

Comrriission:-approved physical sec1,.1rity; training and qualification, and :

. safeguards contingency plans includirig amendments niade pursuant.to provisions Of the Miscellaneous Amendmentsan*d Search Requireme*nts .*.

revisions fo 10 CFR 73;55 (5-1 FR:27817 and 27822) arid to the authority of.: .

10 CFR 50.90 and 10 CFR~0.54(p) .... The combined set of.plans, which contain :

.... Safegu~rds Information .p,rote~ed under .1 o CF.R 7:3.21,* is entitled: ."Virgil c. . * * ...

. Sunimer Nuclear $tatio*n Security Plan," as_ Updated through May 15; 2006, This .. *

.documentincludes the Security Training and Qualification Plan as Appendix B .. *.

. and the. ~afeguards Contingency Plan as Appendix C.

  • JPESC.

L, . ~ SGE&G .shal.l fully implement and maintain in effect all provisions of the

  • pursuant to the authority of 10 CFR 50.90 and 10 CFR 50~54(p);. The SCE&C *

. CSP was approved by' Llcerise.Amei'ldnient t-.fo. 184, as supplemented by ... . .. . . *]/: . . .

  • changes app~ovec1 by Uc:enseAmeridment N9s:-198 an~ 208. * * * * /]

Renewed Facility Operati'ng. License No. NPF-12.

. . * . . * .* Lic:ense Amencfrnerit No.. 208 .

-12.:

  • F.. Thia r e ~ flee~ ~ ~bJect to Jh~ followJrig additional condition. for the ..

' ' prc,f.ectlon of the environment ' ' ' ' ' '

.Before engagfng In acttviUes that may result fn slgnfflcant adverse *.: * * . * . . a

.. *envlroi'lmei'ltal Impact .that was not evaluated or th~is signlflcanUy g~ter than **

.. that evaluated In the Flnar l:nvlr'o'1mBl)tal. Statem"~SCE&G. shall provlqe a . .

  • written notification of such activtttes to the NRC Office of Nuclear Reactor * *
Regu1at1~ arid receive :wiit'ten approval from th~ office b~fore p~ding with : :* *
  • **such acUvlUes. * ** * * ** * * * * * ** *
    • G~ *Reporting to the *commission:

. DELETl:D* I/ ..

./f.*'

DESG

. SCE&G shail notify the Coninilssion, as Soon as poiSlble but not later: . .

.

  • than one hour, of any accident at this faclllty which COUid result lri an

. *' unplanned release of quantities of fission products Iii excess of allowable

  • Hmlts for normal operation 8$bllshed by the Commission.

H.. . . The licensees $tall have and ma!ntair, tlnanclal protectlqn of such type and In ..

.

  • Juch ~unts as.the Commission ~aH ~ulre irl aQCOrdance with Sectlcm ~70 *. .

... :Qf the At<>mlc Energy .Act: of 1954, as amen<led; to cover public llabillty claims. .. : * *

  • L ** * * .*In accordance with the Commission*s direction in its Statement.of policy,

. *Licensing and Requfatort Polley and Procedures for Environmental Protection; ** ..

      • . *uranjum *EY@I Cycl! Impacts. October 29, 1~2. this license 1s subJec;t to the final *

. . .resoMlon. of the pending. lltlgi,tlon involving nible: s.:;3*. Sae, Natural Resources .

. patense Council v. ~ No. 74-1586.(Aprtl 27, 1982); . . . .

.. Additionai .

Ucense. Conditions . . .

. The Addltlorial Conditions contained In Appendix C, as revised through: .

....D----.--.-.-.-.E-----.- --th---.. * .*Amendment No.1:as. are hereby Incorporated Into this renewed license. Seutfl ..

  • ommion
  • nergy 5 0 ~ * *
  • Gaf91i!!1a EleGiris "Gas Campany shall ope~te the fadllly In aci::orcl~ncewlth the Carolina; Inc: . *.Additlonf!l~nditiolis. . . . . . .

'.I<. *

  • Updated Final Safety Analysis RePQrt.
  • The South GarellAa Elestfls & Gas CempaAy Updated Flnai Safely Analysis

.*Report supplement, submitted pursuaot.to 1Q CFR 54.21.(d), dasaibes certain .. ** .

.future activities to. be corl'.iplet~ prior to the period of extended operation.. The .

  • Renew~d Facility Operating License No. NPF'-12 *.
  • Amendment No. 185 * * .. . .. .

.* Domin_ion Energy South. -*

-:. Carolina_._ .* ,. *Inc:: *. ..,..13-

_S9uth *ca~oUna Ele~i=is & Gas ¢9mpany ~'1all cx:,rnpiete. these activitieS no later .

.than AUgu:st 6, 2022, and shall.riotify:the NRC ihwp_ting when.jtnplemen_tation'of * .: *.

""o,_o..,..:m-,..i_,ri-io...;..n-E-_;...,.rie""""r_g,_y...,.:__,, these activities is complete a_nd can be verified by*NRCinSpE3ction~

__ S0_1:jfh <;:;c1roli~c(*lpc:*-

The-Updated Final SafetyAnaiysisRepo:. supp_lement, asrevised;'shall be_

.*.. included* iri the riext scheduled update to . e Updated Final Safety Analysis .

  • *. *Rep*ort *required by 10 CFR q(). 71 (e)(4) fa wing .iss~ance of this reneWed . *

. license~. Until -that update i_s. complete, _the South GaFOliAa: Eleetris. & :Gas: .*

.* Compafly may rriake changes to.the programs and*activities described.in.the

._ ....D_o_m_i-ni_o_n--E--*n-e-rg_y__-__...... _* ** ~upplement without priqr Commis;sion approval;. provjq_ed th~t tt:ie.. South Ci;uolina * -* *

  • South *carolina Inc.-. . . .: . . . : . ev~duates eac;h such .change pursuant to the criteria set:
  • * * * * ' * *forth in 10 CFR 50.59 and*otherwise complies with-the requireinentS:*in that** * *

. : se~tion.: . .. . .. . .. . .. .. . .. .

  • .L. :-*- .-All capsules in. the* reactor :vessel that *a:re rem'oved. and tested:must meet the

.. :. test procedures ~nd reporting requirements of ASTM *e. _1 as.:a2 to the extent _

_practicable for the configuration.of .the specimens io the capsule*. -- Ariy changes*

.to the: .capiaulf3 Withdrawai $chedule~ *including* 'spar~ capsules, must pe approved -*

by the NRC prior to_.implemer1tation. :All capsules placed in storage must be*_ _

maintained for future insertion.* Any change~ to storage requirements -must be. -**

  • approved:by the.NAO. . - . . . . ..

. . . . .M.*-- . _. This renewed licertse.is-effectave.as of.the.date or issuance.and shail expire-at.* .. _-.

midnight, August 6, 2042. : __ * * * * *

  • . :-FORTHENUCLEAR REG.UL.ATORYCOMMI.SSION *
_- /RA/. :..

. J, E:- Dyer, Director._

  • . Office:of Nuclear"Fieacitor

, . . .Regulation: . :- -

' Enclosure~:

. :1; Appendix A(Technlcal Specif1c~tions) *. .

a

    • 2. Appendix (Environmental:Protection Plan) _-** -
  • 3. A.ppendix*().(Additional Cc>nditions) *_ * *

.*. pate oflssuance:_ 'April 23~ 2'004 *

.. : Attachment 1tb Renewed Operatin'g License No. NPF-12 his attachment identifies certain preoperational tests; system de .

  • ration~ and. oth{;lr items-* *

. which:m*ust.be conipleted:to the.satisfaction of NRC Region Ii. SCE G shall not proceed : . . . .

. .*.wjthoufwritten'confirr'natiori from .NRC Region *11 tti'atttie following itrarns have been completed .*: .

l*.........._ .........__..._l,n* c:tccordance with-the condition~ and*~chedules ~et forth below: .. *. <: ** ... *.* *.. ' *. ** .

--~-----.~.1.: . . ;Prior to initi~i'criii~al;t~'stiall Compl~te to'th~'satisfaction.of N.RGRegion th~* * . : .*

foll6Wihg 1o: CFR Part *2t iden~1fiecJ item: . . . . . . . . . . . . . . . . . . . . . . .

u Corr{;lGt ~he qie~el*gen$ratpr'sloW.sta.rttir:ne$'att.ributedto f~el .oil heaq_er qrain dtjwn .

..... ._ _.__.l

  • - 1~_** (81-~29~0t).:.. .* . . -~ .. . . *. " . . . . . . . . *. .* '.

2: . Prior to initicil criticality;_SCE&CJshall complete fo the satisfaction: of NRC_ RE}gion *ii the

.. following open*items: . . . . . . . . . . . . . ..

a_. . Compiete t_he replacement of ~II damaged pi"efilters e>cternal to the coritainmerit-building (82-07-03). * * * * * * * * * * * * * * * *

.t :b.

Complete th~. repair a~d testing*

of diesei gen~rator

8. before entering. M.ode X .

. 3. *Prlor~o e~ceedi.ng5o/o.offu:II power,:scE~_shaU c9mplet~'tothe_.s~~isfaqtio.r, ofNRC *.*. : :

. * ,Region Ii t~e. requirements ofthe follo.whig_ bulletir1s: * . . . . . .. . ...

. a ... : Failure of gate~ty.pe_valves to close against differential presslJte :(81-BU~02)..

h.. ** .Seismic-analysis :for as:.built safety"'.related piping .systems* required to support .. *.

.I~ .*. *. operations :above 5% :of fi.JILpower (79~BLJ-14).*

-.. . .---*L. 'Pri~r to e~c~eding 5% Ott~1i:~ower, .S.CE~: shaU ~omp;ete toihe satisfacti~:n of ~RC :

Regicm II the foilow,ng 10 GFR 21 identified:items: . .. . . .. . . .. . .

a. Westinghouse 3~i_nch g*atevalve closureJailure.(80,-37-10). :_
b. Westinghouse 4,,;inch *gate valve: closure failµre (81-05"'.09). .. . . . . .. . . .

.. *5. ;Prior-to ex~eeding.5o/o:of f u U p o ~ sha:11 corn:plete to~he saHsfaction ofNRC: .*

R~gion II thefollowing*qpen items: *

  • a: * .Correct the hydrogen recombiner highhydrc:.igen alarm set at6% versus*proposed *
.Teciin'i~a[ SpeGification 'limit pf2o/~ (80~06~07)._* . . . . . . . . . . . . . .
  • b .. ** . S~tisfactorily complete the. cap~bHity test f~r Fe~55 analyses. of liquid' wast~ samples .* * .:

Renewed Facility Operating:License Np~ NPF-12 *.

. '!' Qri Apri_l 29, 2019."South Carol_ioa*Electric& Gas _ConipanY'.' (SCE&G)_ changed :_ .

ifs name t<:>: Oo_min~911 Energy_ $c>u~h*ca.rolim(fnG.". * ...

. *.*. -15~

6. Prior tofull power operatlon,:SCE shall compl~te*to the satisfaction of NRG Re*gion:11 .

.*. the.r~quirerrients ofthe following bulletin:. : . . .. . . . ** ... *: . . .

, .*.. L .

  • Audibiiity problems enco.untered during evacu'atio*n alarm in'high ho1searea (79~BU-1.8). *.. *

. 7. .*.. Prior:to full pow~r o p e ~ shail compiete tothe ~aUsfacUon of NRc:~eg;~ffll .*. *: ..

Jhefollowin.g open item:. *. .. . .. . . ... . ... .. ..

  • . Resolve the problem of.tli'e *reactor building temperature being greater.. than ~xpectect

. during hot functional testing (80:-25:.Q9). .. .. . .. . . .

Renewed i=a.cility;Operiitting License.No: NPF-12 ..

  • . *~*on.April 29;2019 "So.uth Carolina*El~ctric& Gas Company"'(SCE&G)*changed *.*. *:: ..

. *. it's :mime tol'Dominic>,n :E:nergy*south Carolina; inc.If. *. . . . . . .* . *. .

( **r

. en*

I

  • m

,a

, I MONTICEU.0. RESERVOIR*

'N I

l r

I I I*

HIU*nrt'..

.I

.... .*t

,., 01

f' '**

n.,_ ,.a.;.a *

  • Sita An.-: ._;
  • ..n*11 *ffl-a i--s *.fn-.1a*io.ia ae ...i,
  • r.r*,-,.

I z*

  • = I

. A!! .

  • w IL

. U)

.. *.) )

I

  • ..... -.-.111' * *.

. lllllllS

. t .: .

..._. au.11.11111

- - -..f.*-*- - -

.;..":'.1. :

  • uet*

J:

  • I

.,...._....._,_"""""_;.;.;..;.,._......,..,........,_...,..,......,.._;...,_..;.;.--1_: ..fn - . *..., 1f~ .-==r- o

  • }:'.=:.*

liUIL .*

    • .a

..... 11111i*: .

o* 1***~~****r llftllllll&11_ 1Ulll115 8 U**

~-*

.. *-~7- .

. *s-::- -.

/.*_***- _ ..

      • _ ~ . . . *.

.tl*

fit--_'**._... .
f. .f- j ..
  • +.

~

.' **. Pocat:lally *1act1oacu-.. 'eue~ *'

NOTE: _See Figure 5.1-4 f~r site : * *

  • W.Ut:e :lleleue: toutt,

--~.*

  • b~u.ndary for gaseous effJ uents *

.

  • FIGURE 5. -1"'.'.3
  • St TE ~EA* 2 00 AClt S

_MONTICEL LO RESERVOIR .

AUX tL. IARY .

  • 11u1LQ1NG_ ,.

I I o* .c*

0 SC..U.I IN ll'ECT * *

... ~~-*.

, ,:iooo, .*

g

. 01

°'J II .0

'a1

~

  • Dominion Energy ..

.

S81JTH 6AR8.LINA ELEETRIG & GAS.GO.

©

  • FAIRFIELD PUMPED STORAGE FACILITY 'PENSTOCKS (At .LIQUID WASTE' PROCESSING -SYSTiM . ' VIRGIL C. SUMMER NUCLEAR STATION IB) PROCESSED STEAM GENERATOR. Bt.OWDOWN

@ c1Ficut.ATrNG *wAT£R 01scHARGE CANAL Loc~tion of Liquid

. IAJ UNPRO.CESSEO STEAM GENERA-TOR SLOWDOWN

. IB) _TURBINE BUILDING *FLOOR DRAINS .

  • Release. Points

' GASEOUS AEL:EASES: '

  • : ,@ SITE -BOUNQARY FOA GAseou;; RELEASES * .IL........_...:........._FIGURE

___ S. 1-4 s-.s

. \.. . .

  • .
  • APflE:NDIX B : : *

... TO . RENEWED.FACILITYUCl;NSE

' . . . . . . . . NO.. :NPF-12 FOR, ..

  • *.* * * .. VIRGIL C. SUMMER-NUCLEAR STATION~* UNIT NO~ 1 **
  • Dominion. Energy:South Carolin~; . .

l_nc:

  • .**SOUT_H CAROllNA ELECTRIC &GAS COMPANY*.:**

.. SOUTH CAROLINA-PUBLIC SERVICE A~THORITY***

. \;._..,,- .

  • .: DOCKET:NQ*.$>*395
  • E~VIFlONMENTAL PROTl:CTION: PLAN
  • 3"'.2

-~ evaluation which provides bases for the cfetermlnatlon that the change, test, or experiment _does

-not Involve an unreviewed envlronrilental question*. -

s.2 Reporting Related to the .

NPDES . .

Permits and State .Certifications.

the Clean ..

--.Violations oi the NPDES pem,it Qr State certification (ptirEiUSnt to Section 401* of

.Water Ac:t). shall be reported to the. NRC by submittai of coplC:JS of the reports required by the .

NPDES.pE!rmit or certification.: South Carolina ~leotno&-Gas ~mpanyshall also provide the NRC *with aoo.py of the results of the foDowlng studies at the same time they are submitted to.* -

.the permitting agency:

(1) Thermal Effects Study Plan (2) *. Section 316(b) Demonstration Study . *

  • Changes and ~dditlons to the NPDES permtt or the State certificatlcm shall be r:eported tQ the. -

--~- -NRC within 30 days following the date the change Is approved. *,, a permit or certification, In :.

. . :part or In its entirety, fs appealed and stayed, the NRC shall be notified within 30 days following

.the date the stay Is granted.

  • The NRC shall be notified of changes to the ~ffectlve NPDES permit proposed by the licensees by providing NRC with a copy of the proposed change.at the same time ft Is submftted to the *
  • pettnittin9 agency. S_* e\dR-G~~~--ie* &-Gas-Gempa-Ay shall provide the NRC with a copy

.. *of the application for renewal .of th NPDES permit at the same time the application Is -

.submitted to the permitting agency.

[)omirlicm_Energy South (;arolina, Inc.

s~s Changes Required for C:ompliance with Other Environmental Regulations

. Changes In facility design or opetatlon and performance of tests or experiments which are*

required to achieve compliance with other Federal~ State or local environmental regulations a.re

~, not subject to ihe requfrements of Section 3.1.

,~*:

  • Dorninfon.Energy South CaroU~a.; Inc. * . APPENOIX:C ADDITIONAL COND.ITIONS.
  • REN~WED .OPERATING LICENSE .NO .. NPF.:.1.2 Sc;,µth:CaFOlif)a Eieetrie & Gas Qofflpany (the term liGens~ in Appendix C refers to
  • ~oi;ith. CaFOlina Eleotrio & *Gas C()mpany). s~aff comply, w.ith the foUowing co11ditions on. *

. 'the schedules noted below: . .. . .. . . . .. . . .

.Amendment Additional Condition . Implementation .

.* Number ** .Date ..

137 > The licensee is :authorized to reloca.te certain :Technical :.:. The

$pe¢ification r~quiremerits to license~cohtroiled. documents ... amendment Implementation of this. amendment shall include the relocation*** shall be._**.*

pf those te~hn/c:al specifi~tion requ1ienients to the appropriate irnplemented:

  • documents; as descriped in the licensee's application .dated ...
  • within .180 days**.

November: 14, 1995; as supplemented by letters dated July :11,

  • from August *13, 1996, and ju1y 24, 1997; and evaluated in the staff's Safety ..
  • 1.997: * .

Evaluation. attached to thi's amendment.. * . .. . . .

Upon.implementation of Amendment.No. 180. adopting TSTF-.. . As stated in the

~. Revislon 3, the det~nnination c;,foontrol rc;>om envek>P'3 *. . Additional .

(CRE) unfiltered.air*inleakage as.required bySurveillance * . . . Condition Req1,1jrem~r:itSR 4.7.6.e. in accordance with TS 6.8.4;m.3.(i),

  • the assessm*ent of-CRE hab.itability as required by.Specification *.

6.8Am.3.(ii), arid the measurement of CRE. pressure as *

  • required l;>y Specification 6.8.4.ni.4, shall pe considered met .

Following implementation: . .. * . .. . . . . .-. . . .

(a) . *The first perfomiance_of SR4.7:6, in accordance\Yith *

. Specification 6.8A.m.3.(i),:shall be within.the specified ** *

  • frequenGY of 6 year~. plus the: 18;.month allowance of SR
  • . 4.0.2, as measured from March 25, 2005, the date of.the * *

.: most recent successful tracer gas test,. as stated in the .

. . *:. November 18, 2005*1etter response to Genetic Letter *.

  • 2003-01; or within the .next.18 months if the. time period

. . . .since the mo$t recent:successful tr'~cer:gas test is greater:

<. than :e *y~~rs~. * * * * * * * *: * * * *

(b) *The first performance of the periodic assessment *of.CRE

... 'habitability; specification *e~8.4:m.3.(ii), shall be within 3 .

  • years, plus the 9-month aliowance *of SR 4.0.2, as:: ...

measured from Marctr 25, 200S;. the date of the .most

. : *recent successful. tracer gas test, as stated in the . : * .

  • November 18, 2005 letter response to Generic Letter -

. 2003-01, or within: the next 9 fr1onttis if the time pedod * .

since the most recent successful tracer.gas test is greater:

.

  • than :3 years. - . . . . . . .

. _ . The first perform~nce:of the. periodi.c measurement of ...

. . :. CRE.pressure, sp~cificatioh*~.8.4.m.4, *shall be within 18

months, plus the 138 days allowance of SR 4.0.2, as rrie~s~red from Septernber 28,. 2006., the date .of the mos~ *

. . . . recentsuccessful pressure measurement:test; or\vithin .

  • 138 days if not performed previously.  ::