Letter Sequence Withdrawal |
---|
EPID:L-2018-LLA-0287, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition (Withdrawn, Closed) EPID:L-2019-LLA-0011, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition (Withdrawn, Closed) EPID:L-2019-LLA-0012, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition (Withdrawn, Closed) EPID:L-2019-LLE-0011, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition (Withdrawn, Closed) EPID:L-2019-LLQ-0000, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition (Withdrawn, Closed) |
|
MONTHYEARL-18-254, License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition2018-10-22022 October 2018 License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition Project stage: Request ML18320A1272018-11-16016 November 2018 NRR E-mail Capture - Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions Project stage: Acceptance Review L-18-271, License Amendment Request - Proposed Post-Shutdown Emergency Plan2019-02-0505 February 2019 License Amendment Request - Proposed Post-Shutdown Emergency Plan Project stage: Request L-18-242, License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition2019-02-0505 February 2019 License Amendment Request - Proposed License and Associated Technical Specification Changes for Permanently Defueled Condition Project stage: Request ML19043A6962019-02-0808 February 2019 NRR E-mail Capture - Davis-Besse License Amendment Request for the Post-Shutdown Emergency Plan Project stage: Acceptance Review L-19-062, Supplement to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1. Definitions, 5.0., Administrative Controls. for Permanently Defueled Condition2019-02-27027 February 2019 Supplement to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1. Definitions, 5.0., Administrative Controls. for Permanently Defueled Condition Project stage: Supplement ML19073A1112019-03-14014 March 2019 NRR E-mail Capture - Davis-Besse - Acceptance of License Amendment Request for Permanently Defueled License and Technical Specifications Project stage: Acceptance Review L-19-100, Supplemental Information for the Proposed Post-Shutdown Emergency Plan License Amendment2019-04-10010 April 2019 Supplemental Information for the Proposed Post-Shutdown Emergency Plan License Amendment Project stage: Supplement L-19-150, Supplemental Information Regarding License Amendment Request for Permanently Defueled License and Technical Specifications2019-05-16016 May 2019 Supplemental Information Regarding License Amendment Request for Permanently Defueled License and Technical Specifications Project stage: Supplement ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program Project stage: Acceptance Review ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications Project stage: RAI ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan Project stage: RAI L-19-160, Response to Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications2019-06-26026 June 2019 Response to Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications Project stage: Response to RAI ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program Project stage: RAI L-19-166, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request for Proposed Post-Shutdown Emergency Plan2019-07-0808 July 2019 Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request for Proposed Post-Shutdown Emergency Plan Project stage: Supplement L-19-178, Response to Request for Additional Information Regarding Request for Approval of Decommissioning Quality Assurance Program for the Davis-Besse Nuclear Power Station2019-07-16016 July 2019 Response to Request for Additional Information Regarding Request for Approval of Decommissioning Quality Assurance Program for the Davis-Besse Nuclear Power Station Project stage: Response to RAI ML19212A1392019-08-0606 August 2019 Withdrawal of Licensing Actions Associated with the Permanent Shut Down of the Plant (Epids L-2018-LLA-0287, L-2019-LLA-0011, L-2019-LLA-0012, L-2019-LLE-0011, and L-2019-LLQ-0000) Project stage: Withdrawal ML19212A1352019-08-0606 August 2019 Federal Register Notice for Withdrawal of February 5, 2019, License Amendment Application for Post-Shutdown Emergency Plan Project stage: Withdrawal ML19212A1362019-08-0606 August 2019 Federal Register Notice for Withdrawal of February 5, 2019, License Amendment Application for Permanently Defueled Technical Specifications Project stage: Withdrawal ML19212A1372019-08-0606 August 2019 Federal Register Notice for Withdrawal of October 22, 2018, License Amendment Application Project stage: Withdrawal 2019-05-16
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML22147A1252022-07-14014 July 2022 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact Regarding License Amendment Request to Revise the Emergency Plan for Davis-Besse Nuclear Power Station, Unit No. 1 ML22147A1242022-07-14014 July 2022 Environmental Assessment and Finding of No Significant Impact Regarding License Amendment Request to Revise the Emergency Plan ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML21123A0842021-05-19019 May 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in April 2021 ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20119B0682020-05-0808 May 2020 Exemption ML20119B0702020-05-0808 May 2020 Federal Register Notice ML19303A0672019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Federal Register Notice, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19212A1362019-08-0606 August 2019 Federal Register Notice for Withdrawal of February 5, 2019, License Amendment Application for Permanently Defueled Technical Specifications ML19212A1352019-08-0606 August 2019 Federal Register Notice for Withdrawal of February 5, 2019, License Amendment Application for Post-Shutdown Emergency Plan ML19212A1392019-08-0606 August 2019 Withdrawal of Licensing Actions Associated with the Permanent Shut Down of the Plant (Epids L-2018-LLA-0287, L-2019-LLA-0011, L-2019-LLA-0012, L-2019-LLE-0011, and L-2019-LLQ-0000) ML19212A1372019-08-0606 August 2019 Federal Register Notice for Withdrawal of October 22, 2018, License Amendment Application ML19162A1332019-07-31031 July 2019 Federal Register Notice: Firstenergy Nuclear Operating Company Davis-Besse ISFSI - Environmental Assessment and Finding of No Significant Impact; Issuance ML19151A4742019-06-24024 June 2019 Letter to FENOC - Individual FRN Regarding Application for Order Consenting to Transfer of Licenses and Conforming Amendments. Notice of Consideration of Approval of Transfers and Conforming Amendments and Opportunity for Comments and a Hea ML19151A4932019-06-24024 June 2019 Individual FRN Regarding Application for Transfer of Licenses and Conforming Amendments. Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for Comments and a Hearing ML19067A0232019-06-0404 June 2019 FENOC - Notice of Issuance of Exemption FRN (EPID-L-2018-LLE-0016) ML19067A0222019-06-0404 June 2019 FENOC - Exemption (EPID-L-2018-LLE-0016) ML19133A0722019-05-16016 May 2019 FENOC Fleet - Beaver Valley 1 & Davis Besse 1 Withdrawal of an Amendment Request Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement (CAC Nos. MF9714 & MF9715, EPID L-2017-LL ML19133A0492019-05-16016 May 2019 FENOC Fleet FRN Notice Withdrawal of the Application ML19052A0412019-04-0404 April 2019 OEDO-18-00160 - Notice of Issuance of Final Director'S Decision in FRN ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML19056A5352019-02-28028 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/2019 NRC-2019-0065, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/20192019-02-28028 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 03/12/2019 NRC-2018-0192, Firstenergy Nuclear Operating Company (Fenoc); Firstenergy Nuclear Generation, LLC; Environmental Assessment2018-09-0404 September 2018 Firstenergy Nuclear Operating Company (Fenoc); Firstenergy Nuclear Generation, LLC; Environmental Assessment ML18130A8492018-09-0404 September 2018 Firstenergy Nuclear Operating Company (Fenoc); Firstenergy Nuclear Generation, LLC; Environmental Assessment ML18130A8852018-08-29029 August 2018 FENOC Fleet - Beaver Valley; Davis-Besse; Perry - Environment Assessment and Finding of No Significant Impact Related to Exemption Request for a Physical Barrier Requirement (CAC Nos. MG0010, MG0011, MG0012, and MG0013; EPID L-2018-LLE-0019 ML18220B3172018-08-27027 August 2018 OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition ML18220B3142018-08-27027 August 2018 OEDO-18-00160 - Acknowledgement Letter 2.206 Petition for Citizen Complaint and Request for Enforcement Action Regarding Firstenergy Nuclear Facility Operations in Ohio and Pennsylvania NRC-2018-0174, OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition2018-08-27027 August 2018 OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition ML16336A0622017-01-0404 January 2017 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Technical Specification 5.5.3, Radioactive Effluents Controls Program ML16250A3132016-09-0707 September 2016 EA-16-022 Davis Besse FRN Notice NRC-2016-0191, EA-16-022 Davis Besse FRN Notice2016-09-0707 September 2016 EA-16-022 Davis Besse FRN Notice ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML15294A4112015-12-0808 December 2015 License Renewal FRN ML15070A4002015-04-29029 April 2015 FRN-Notice of Availability of the Final Plant-Specific Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Power Station, Unit 1 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 NRC-2014-0162, Federal Register Notice - Confirmatory Order Modifying License, Davis-Besse Nuclear Power Station, Unit 12014-06-30030 June 2014 Federal Register Notice - Confirmatory Order Modifying License, Davis-Besse Nuclear Power Station, Unit 1 ML14164A2102014-06-30030 June 2014 Federal Register Notice - Confirmatory Order Modifying License, Davis-Besse Nuclear Power Station, Unit 1 ML14050A0782014-02-24024 February 2014 Notice of Availability of Draft Plant-Specific Supplement 52 to Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Power Station, Unit 1 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13155A1132013-06-0404 June 2013 Federal Register Notice Published 6/4/2013, 78 Fr 33448-33449, Application for License to Export High-Enriched Uranium ML12237A1572012-08-28028 August 2012 Federal Register Notice Regarding the ACRS Plant License Renewal (Davis Besse)Subcommittee Meeting, September 19, 2012 ML1208002922012-03-20020 March 2012 Sunshine Federal Register Notice for Week of March 26, 2012 ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2011-0290, Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 20112011-12-15015 December 2011 Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 2023-09-29
[Table view] Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 6, 2019 Mr. John W. Judge President and Chief Executive Officer FirstEnergy Solutions Corp.
341 White Pond Drive Akron, OH 44320
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1-WITHDRAWAL OF LICENSING ACTIONS ASSOCIATED WITH THE PERMANENT SHUT DOWN OF THE PLANT (EPIDS L-2018-LLA-0287, L-2019-LLA-0011, L-2019-LLA-0012, L-2019-LLE-0011, AND L-2019-LLQ-OOOO)
Dear Mr. Judge:
By letter dated July 26, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19207A097}, FirstEnergy Solutions Corp. (FES) informed the U.S.
Nuclear Regulatory Commission (NRC) that it has reversed its decision to permanently cease power operations at Davis-Besse Nuclear Power Station (DBNPS), Unit No. 1, and Perry Nuclear Power Plant, Unit No. 1 (ADAMS Accession No. ML18115A007). FES is the parent company of FirstEnergy Nuclear Generation, LLC, which owns these plants. In addition, FES withdrew the following DBNPS licensing actions originally requested by FirstEnergy Nuclear Operating Company (the licensee):
- 1. the October 22, 2018 (ADAMS Accession No. ML18295A289), license amendment request (LAR) to revise the definitions and administrative controls in the DBNPS technical specifications (TS) to support the planned permanent cessation of power operations;
- 2. the February 5, 2019 (ADAMS Accession No. ML19036A523), LAR to revise the DBNPS license and TS to reflect the permanently defueled condition;
- 3. the February 5, 2019 (ADAMS. Accession No. ML19036A524}, LAR to revise the DBNPS emergency plan following the permanent cessation of power operations to reflect the post-shutdown and permanently defueled condition
- 4. the April 30, 2019 (ADAMS Accession No. ML19120A208}, request for an exemption from certain record retention requirements; and
- 5. the April 30, 2019 (ADAMS Accession No. ML19120A209}, request for approval of the DBNPS decommissioning quality assurance plan.
J.Judge The NRC has filed the enclosed notices of withdrawal of the three applications for amendments to the DBNPS renewed facility operating license with the Office of the Federal Register for publication.
Sincerely, Blake A Purnell, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
- 1. Notice of Withdrawal October 22, 2018, Application
- 2. Notice of Withdrawal February 5, 2019, Application for Permanently Defueled TS
- 3. Notice of Withdrawal February 5, 2019, Application for Post-Shutdown Emergency Plan cc: Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 Additional distribution via Listserv
ENCL0SURE1 FEDERAL REGISTER NOTICE Withdrawal of October 22, 2018, Application
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-346; NRC-2019-0028]
FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station, Unit No. 1 AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has granted the request of FirstEnergy Solutions Corp. (FES) to withdraw the FirstEnergy Nuclear Operating Company (FENOC, the licensee) application dated October 22, 2018, for a proposed amendment to Renewed Facility Operating License No. NPF-3. The proposed amendment would have made changes to the Davis-Besse Nuclear Power Station (DBNPS), Unit No. 1, technical specifications (TS) to permit certain changes in plant operations when the plant is permanently defueled.
DATES: [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: Please refer to Docket ID NRC-2019-0028 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2019-0028. Address questions about NRC dockets IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:
Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Blake A. Purnell, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-1380, e-mail: Blake.Purnell@nrc.gov.
SUPPLEMENTARY INFORMATION:
The NRC has granted the request of FES to withdraw the FENOC application dated October 22, 2018 (ADAMS Accession No. ML18295A289), as supplemented by letter dated February 27, 2019 (ADAMS Accession No. ML19058A328}, for a proposed amendment to Renewed Facility Operating License No. NPF-3 for the DBNPS located in Ottawa County, Ohio. FES is the parent company of FirstEnergy Nuclear Generation, LLC, which owns DBNPS. The proposed amendment would have changed the DBNPS TS to permit changes in plant operations when the plant is permanently defueled.
Specifically, the licensee proposed to revise the TS to support the implementation of the certified fuel handler and non-certified operator positions. In addition, certain organization, staffing, and training requirements in the TS would have been revised.
The proposed amendment would have also made other administrative changes.
The Commission previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on January 30, 2019 (84 FR 494). However, by letter dated July 26, 2019 (ADAMS Accession No. ML19207A097), FES requested to withdraw the proposed amendment.
Dated at Rockville, Maryland, this day of August 2019.
For the Nuclear Regulatory Commission.
Blake A. Purnell, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE 2 FEDERAL REGISTER NOTICE Withdrawal of February 5, 2019, Application for Permanently Defueled Technical Specifications
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-346; NRC-2019-0087]
FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station, Unit No. 1 AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has granted the request of FirstEnergy Solutions Corp. (FES) to withdraw the FirstEnergy Nuclear Operating Company (FENOC, the licensee) application dated February 5, 2019, for a proposed amendment to Renewed Facility Operating License No. NPF-3. The proposed amendment would have made changes to the Davis-Besse Nuclear Power Station (DBNPS), Unit No. 1, license and technical specifications (TS) to reflect the permanent cessation of reactor operation and permanent defueling of the.reactor.
DATES: [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: Please refer to Docket ID NRC-2019-0087 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2019-0087. Address questions about NRC dockets IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:
Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Blake A. Purnell, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-1380, e-mail: Blake.Purnell@nrc.gov.
SUPPLEMENTARY INFORMATION:
The NRC has granted the request of FES to withdraw the FENOC application dated February 5, 2019 (ADAMS Accession No. ML19036A523), as supplemented by letters dated May 16 and June 26, 2019 (ADAMS Accession Nos. ML19136A240 and ML19177A289, respectively), for a proposed amendment to Renewed Facility Operating License No. NPF-3 for the DBNPS located in Ottawa County, Ohio. FES is the parent company of FirstEnergy Nuclear Generation, LLC, which owns DBNPS. The proposed amendment would have revised the DBNPS renewed facility operating license and TS following the permanent cessation of power operations to reflect the post-shutdown and permanently defueled condition. The proposed amendment would have eliminated TS requirements and license conditions which would not have been applicable once DBNPS ceased power operations and could no longer place fuel in the reactor vessel. The proposed amendment would have also eliminated obsolete license conditions. In addition, the proposed amendment would have revised several license conditions and TS requirements, including limiting conditions for operation, usage rules, definitions, surveillance requirements, and administrative controls. The licensing bases for DBNPS, including the design bases accident analysis, would have also been revised.
The Commission previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on April 9, 2019 (84 FR 14149). However, by letter dated July 26, 2019 (ADAMS Accession No. ML19207A097), FES requested to withdraw the proposed amendment.
Dated at Rockville, Maryland, this day of August 2019.
For the Nuclear Regulatory Commission.
Blake A. Purnell, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE 3 FEDERAL REGISTER NOTICE Withdrawal of February 5, 2019, Application for Post-Shutdown Emergency Plan
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-346; NRC-2019-0065]
FirstEnergy Nuclear Operating Company; Davis-Besse Nuclear Power Station, Unit No. 1 AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; withdrawal by applicant.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has granted the request of FirstEnergy Solutions Corp. (FES) to withdraw the FirstEnergy Nuclear Operating Company (FENOC, the licensee) application dated February 5, 2019, for a proposed amendment to Renewed Facility Operating License No. NPF-3. The proposed amendment would have revised the Davis-Besse Nuclear Power Station (DBNPS), Unit No. 1, emergency plan following the permanent cessation of power operations to reflect the post-shutdown and permanently defueled condition.
DATES: [INSERT DATE OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: Please refer to Docket ID NRC-2019-0065 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2019-0065. Address questions about NRC dockets IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:
Jennifer.Borqes@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/readinq-rm/adams.html. To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at ~-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Blake A. Purnell, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commrssion, Washington DC 20555-0001; telephone: 301-415-1380, e-mail: Blake.Purnell@nrc.gov.
SUPPLEMENTARY INFORMATION:
The NRC has granted the request of FES to withdraw the FENOC application dated February 5, 2019 (ADAMS Accession No. ML19036A524), as supplemented by letters dated April 10 and July 8, 2019 (ADAMS Accession Nos. ML 191 OOAOOO and ML19189A109, respectively), for a proposed amendment to Renewed Facility Operating License No. NPF-3 for the DBNPS located in Ottawa County, Ohio. FES is the parent company of FirstEnergy Nuclear Generation, LLC, which owns DBNPS. The proposed amendment would have revised the DBNPS emergency plan following the permanent cessation of power operations to reflect the post-shutdown and permanently defueled condition. The proposed changes included revision of the emergency response organization staffing and editorial changes.
The Commission previously issued a proposed finding that the amendment involves no significant hazards consideration published in the Federal Register on March 12, 2019 (84 FR 8910). However, by letter dated July 26, 2019 (ADAMS Accession No. ML19207A097), FES requested to withdraw the proposed amendment.
Dated at Rockville, Maryland, this day of August 2019.
For the Nuclear Regulatory Commission.
Blake A. Purnell, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation J. Judge
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1-WITHDRAWAL OF LICENSING ACTIONS ASSOCIATED WITH THE PERMANENT SHUT DOWN OF THE PLANT (EPIDS L-2018-LLA-0287, L-2019-LLA-0011, L-2019-LLA-0012, L-2019-LLE-0011, AND L-2019-LLQ-OOOO) DATED AUGUST 6, 2019 DISTRIBUTION:
PUBLIC RidsNrrDssStsb Resource PM File Copy RidsNsirDpr Resource RidsACRS_MailCTR Resource THerrity, NRR RidsNrrDorlLpl3 Resource PPrescott, NRR RidsNrrLASRohrer Resource AArmstrong, NRR RidsNrrPMDavisBesse Resource AFoli, NRR RidsRgn3MailCenter Resource CJackson, NRR RidsOgcMailCenter Resource DScully, NRR RidsNrrDeEeob Resource EDickson, NRR RidsNrrDeEicb Resource KWood, NRR RidsNrrDirslrab Resource MYoder, NRR RidsNrrDirslqvb Resource Nlqbal, NRR RidsNrrDlpPfpb Resource OYee, NRR RidsNrrDmlrMccb Resource RGrover, NRR RidsNrrMvib Resource SDarbali, NRR RidsNrrDraArcb Resource SJones, NRR RidsNrrDraApla Resource JWhite, NRO RidsNrrDraAplb Resource VHuckabay, NRR RidsNrrDssScpb Resource MNorris, NSIR RidsNrrDssSnpb Resource RKinard, NSIR RidsNrrDssSrxb Resource JArce, NSIR ADAMS Accession Nos.: LTR: ML19212A139 FRN PSEP: ML19212A135 FRN POTS: ML19212A136 FRN CFH: ML19212A137 OFFICE NRR/D0RL/LPL3/PM NRR/D0RL/LPL3/LA NRR/D0RL/LPL3/BC NRR/D0RL/LPL3/PM NAME BPumell SRohrer LRegner BPurnell DATE 8/1/19 7/31/19 8/5/19 8/6/19 OFFICIAL AGENCY RECORD