ML19210C485

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1979
ML19210C485
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/08/1979
From: Berger C, Stolz J
TOLEDO EDISON CO.
To:
Shared Package
ML19210C484 List:
References
NUDOCS 7911140329
Download: ML19210C485 (2)


Text

k .,

Rev. 1 - 11/9/79 d

OPERATING DATA REPORT DOCKET NO. 50-346 DATE vetocer 0, 1979 CO.\tPLETED BY J Sto::/C. Berger TELEP110NE 410-233-5000, Er.t.

243 OPERATING STATUS Notes

1. Unit Name: Davis-Besse Unit 1
2. Reporting Period: Seo tember . 1979 2772
3. Licensed Thermal Power t\.1Wt):
4. Nameplate Rating (Gross \1We):

925 906

5. Design Electrical Rating INet .1We):

\

6. 31aximtm Dependable Capacity (Gross .5tWe):

to be determined

7. 5!axiraum Dependable Capacity (Net 51We): _
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Repert. Gise Reasons:
9. Power Level To which Restricte '. If Any (Net .\1We):
10. Reasons For Restrictions. If Any:

This 51onth Yr to.Date Cumulatise 720 6,551 18,316

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 634.95 3,624.4 10.256.2 85.05 1,943.3 2,733.6
13. Reactor Resene Shutdown Hours 604.1 3,503 9,236.2
14. Ilours Generator On.Line 0 1,728.2 1,723.2
15. Unit Resene Shutdown Hours ,

1 16. Gross Thermal Energy Generated 15tWH) 1.519.486 8.651.148 18,93g_713

17. Gross Electrical Energy Generated i5thit) 503,791 ,_,

2.381.lES 6.264.943

18. Net Electrical Energy Generated (51WH) 477,780 2,714,007 5.755.467
19. Unit Senice Factor 83.9 53.5 50.4 83.9 79.9 59.9
20. Unit Availability Factor
21. Unit Capacity Factor tUsin; .\lDC Net) to be determined
22. Unit Capacity Factor (Using DER Net) 73.2 45.7 34.7
23. Unit Forced Outage Rate 8.8 3.9 19.0
24. Shutdowns Scheduled Over Nest 6.\lonths (Type. Date,and Duration of Each): ,

Refueling outace to start March 15. 1980

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operationi: Forecast Achiesed INITIAL CRITICALITY _

INITIAL ELECTRICITY C05t51ERCIAL OPER ATION

,7gg o3 M 1321

Rey. 1 - 11/9/79 i 1

DOCKET NO. 50-346 UNIT SilUTDOWNS AND IOW!:. t REDUCllONS UNIT N AME Dav is-Hesse JJnit 1 j DAIE Octolmr 8- 1979 COMPl.E1 ED itY .lan St at 7/fC;1LL Berger REPORT MON ill September, 1 979 ll:t.l.PilONE 419-259-5000. Ext. 243

. 3 -

5 t, Cause & Corrective g .!"E 3g .h h Licensec

$.%3 Action to N e. Date 3g ,g g 5 Ev::nt aT 9

js 5, c Report a N0 5' Pievent itecurrence

  • $E ld - g o o

NA NA Maintenance outage to find steam leak 1l 11 79 09 07 S 58.0 B 1 NA in containment.

NA NA NA Sticking, pump pressure controller on 12 79 09 18- F 17.2 A 3 No. 2 electro-hydraulic control pump.

. Controller to be disassembled and .

cleaned at earliest convenience.

0.0 4 NA NA NA Reactor power reduced to 75% to allow 13 79 09 23 S B maintenance to adjust blowdown on

'. SPl7A2.

79 09 26 F 40.7 A 3 tIA NA NA Faulty capacitor on turbine throttle 1 14 pressure transmitter power supply.

' 3 4 l -

Exhibit G. Instructions r0 Reason: Method:

~

F: Forced .

1-Manual for l' reparation of Data S: Schedu!ed A. Equipment Failure (Explain) Entry Sheets for 1.icensee ll. Maintenance of Test 2 Manual Scram.

.I Automatic Scram. livent Iteport (1. lilt) File (NUREG-U C.Hefueling 0161)

O D 1(cgul.itory itestriction i Othes (lisplain)

U l Operator Training & License Examination 5

. 1 Admomtrative lAlabit I Same Source G Opciational I nor (thplain) 11 Othen 11 splam)

(9/77) ,

..