Letter Sequence Supplement |
---|
EPID:L-2018-RNW-0012, Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: CLI-22-04, Change Letter to Peach Bottom Subsequent Renewed Licenses March 17 2022 Rev 1, ML18179A457, ML18214A383, ML18282A029, ML19007A282, ML19007A326, ML19029B121, ML19142A369, ML19182A112, ML19205A206, ML19240A300, ML22096A298
|
MONTHYEARML18193A6892018-07-10010 July 2018, 31 July 2018 Application for Subsequent Renewed Operating Licenses Project stage: Request ML18191B2802018-08-27027 August 2018 Avilsbility of Peach Bottom SLR Application and Opportunity to Request a Hearing Project stage: Request ML18179A4572018-08-27027 August 2018 FRN Notice of Availabity and Request for Hearing Project stage: Other ML18191B0852018-08-27027 August 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Exelon Generation Company, LLC, Application for Subsequent License. Project stage: Acceptance Review ML18214A3832018-09-0505 September 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other NRC-2016-0078, Comment (1) of Alan Harris on Behalf of Entergy Louisiana, LLC and Entergy Operations, Inc. on Entergy Operations, Inc; Waterford Steam Electric Station, Unit 32018-10-0303 October 2018 Comment (1) of Alan Harris on Behalf of Entergy Louisiana, LLC and Entergy Operations, Inc. on Entergy Operations, Inc; Waterford Steam Electric Station, Unit 3 Project stage: Request ML18299A2132018-10-0909 October 2018 Comment (3) of Cheryl T. Seager on Behalf of Us Environmental Protection Agency (Epa)On the Draft Environmental Impact Statement (NUREG-1437,Supplement 59) for the License Renewal of Waterford Steam Electric Station Unit 3 ML18282A0292018-10-16016 October 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18323A1032018-11-30030 November 2018 NUREG-1437, Suppl. 59, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford Steam Electric Station, Unit 3 - Final Report Project stage: Acceptance Review ML19007A2822018-12-0404 December 2018 Fws to NRC, Peach Bottom Subsequent License Renewal Ipac Trust Resources List of Endangered Species, Migratory Birds, and Wetlands Project stage: Other ML18354B1132018-12-20020 December 2018 Response to NRC Request for Additional Information, Dated November 23, 2018, Regarding the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application, Environmental Requests for Additional Information Project stage: Request ML19007A3352019-01-0707 January 2019 Map of Conowingo Pond Showing Location of Stations in Trawl Zones 405, 406 and 408 - Figures Project stage: Request ML19007A3302019-01-0707 January 2019 Final Report PBAPS Thermal Study Project stage: Request ML19007A3262019-01-0707 January 2019 Response to Request Dated December 7, 2018 for Docketing of Additional Documents to Support Nrc'S Environmental Review of the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML19023A0152019-01-23023 January 2019 Supplement No. 2 - Changes to the Subsequent License Renewal Application Project stage: Supplement ML19042A1312019-02-11011 February 2019 Supplement No. 3 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19029B1212019-02-26026 February 2019 and 3 - Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19065A0082019-03-0505 March 2019 Response to Nrg Audit Review Information Request - Application for Subsequent Renewed Operating Licenses Section 4.6 Primary Containment Fatigue Analyses Project stage: Request ML19077A2532019-03-18018 March 2019 Supplement No. 4 - Changes to the Subsequent License Renewal Application Project stage: Supplement ML19114A2652019-04-0808 April 2019 Submittal of Revision 27 to Updated Final Safety Analysis Report and Revision 22 to Fire Protection Program and Reference Drawings Project stage: Request ML19108A4272019-04-10010 April 2019 Request for Additional Information for Peach Bottom 2 and 3 Subsequent License Renewal Application - Set 1 Project stage: Request ML19122A2892019-05-0202 May 2019 Response to NRC Requests for Additional Information, Set 1, Dated April 10, 2019 Related to Plant Subsequent License Renewal Application Project stage: Response to RAI ML19253D2922019-05-0707 May 2019 Request for Clarification of Information on Peach Bottom Water Chemistry Program Project stage: Request ML19150A2972019-05-30030 May 2019 Revised Responses to NRC Requests for Additional Information, Fire Water System, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19255F7822019-06-0303 June 2019, 27 September 2019 Public Clarification Calls with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue, (RAI) B.2.1.25-1, and Potential License Renewal Aging Management Issues Project stage: Request ML19157A0092019-06-0606 June 2019 Response to NRC Request for Additional Information, Dated May 15, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19142A3692019-06-0606 June 2019 Revised Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19163A2222019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Buried Pipe, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Response to RAI ML19163A2212019-06-12012 June 2019 Supplement No. 5 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19163A2232019-06-12012 June 2019 Revised Response to NRC Request for Additional Information, Core Shroud Support Fatigue Analysis Reevaluation, Related to the Subsequent License Renewal Application Project stage: Response to RAI ML19182A1122019-07-0101 July 2019 First 10 CFR 54.21 (B) Annual Amendment to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Other ML19193A0062019-07-12012 July 2019 Supplement No. 7 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19205A4332019-07-24024 July 2019 NRC061 - Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (Final Report), NUREG-2192 (July 2017) Project stage: Approval ML19206A1802019-07-25025 July 2019 Supplement No. 8 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Supplement ML19199A1132019-07-31031 July 2019, 1 August 2019 Notice of Availability of Draft Supplement 10, Second Renewal to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 Project stage: Request ML19210C5712019-07-31031 July 2019 Schedule Revision for the Review of the Peach Bottom Atomic Power Station Units 2 & 3 Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0012/L-2018-RNW-0013) Project stage: Approval ML19210D4532019-07-31031 July 2019 NUREG-1437, Supplement 10, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal for Peach Bottom, Units 2 and 3 Project stage: Acceptance Review ML19225B9762019-08-13013 August 2019 Response to NRC Request for Clarification of Information, Dated August 1, 2019 Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application Project stage: Request ML19268B3512019-09-12012 September 2019 Transcript of Peach Bottom Subsequent License Renewal Draft SEIS Public Meeting Held 12 Sep 2019 Project stage: Draft Approval ML19205A2062019-09-24024 September 2019 Summary Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19238A3032019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue Project stage: RAI ML19240A3002019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Questions on Their Coatings and Linings of Certain Components Aging Management Program and Their Inspection of Buried and Underground Piping and Tanks Aging Management Program for SLR Project stage: Other ML19246A1452019-09-27027 September 2019 Clarification Call to Discuss Exelon'S Response to NRC Requests for Additional Information (RAI) 3.3.2.1.1-1 Project stage: RAI ML19280B2552019-10-0707 October 2019 SLRA Revision to BWR Vessel Internals Program Enhancement 1 Project stage: Request ML19275E9682019-10-0707 October 2019 Issuance Letter - Safety Evaluation Report Related to the Subsequent License Renewal of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML19280D8202019-10-31031 October 2019 Safety Evaluation Report Related to the Subsequent License Renewal Application of Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML20063L3242020-02-28028 February 2020 EPA Comments on NUREG-1437, Supplemental 10, Second Renewal, Final (Peach Bottom Project stage: Request ML20024G4292020-03-0404 March 2020 Record of Decision - Issuance of Subsequent Renewed Facility Operation License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Approval ML20010F2852020-03-0505 March 2020 Transmittal Letter - Issuance of Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 for Peach Bottom Atomic Station Units 2 and 3 Project stage: Approval ML22055A5572022-02-24024 February 2022 Commission Memorandum and Order (CLI-22-04) Project stage: Request 2019-04-08
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] |
Text
Exelon Generation 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp com 10 CFR 50 10 CFR 51 10 CFR 54 July 25, 2019 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-277 and 50-278
Subject:
Supplement No. 8 - Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application
References:
- 1. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated July 1O, 2018, "Application for Subsequent Renewed Operating Licenses"
- 2. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated September 14, 2018, "Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 1)
- 3. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated January 23, 2019, "Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 2)
- 4. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated February 11, 2019, "Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 3)
- 5. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated March 18, 2019, "Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 4)
- 6. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated June 12, 2019, "Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 5)
- 7. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRG Document Control Desk, dated July 1, 2019, "First 10 CFR 54.21 (b)
Annual Amendment to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 6)
July 25, 2019 U.S. Nuclear Regulatory Commission Page 2
- 8. Letter from Michael P. Gallagher, Exelon Generation Company, LLC (Exelon) to NRC Document Control Desk, dated July 12, 2019, "Changes to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application" (Supplement No. 7)
In Reference 1, Exelon submitted the Subsequent License Renewal Application (SLRA) for the Peach Bottom Atomic Power Station, Units 2 and 3 (PBAPS). In References 2, 3, 4, 5, 6, 7 and 8, Exelon submitted Supplement Nos. 1, 2, 3, 4, 5, 6 and 7 to the SLRA for PBAPS. The purpose of this letter is to provide Supplement No. 8 to the SLRA for PBAPS. Supplement No. 8 includes one change to the SLRA which provides additional information and clarification in the SLRA to address the NRC Safety Review Audit information needs.
Enclosure A to this letter provides a description of the changes, and corresponding mark-ups to the affected portions of the SLRA, thereby supplementing the PBAPS SLRA.
This letter contains no new regulatory commitments.
This submittal has been discussed with the NRC License Renewal Senior Project Manager for the PBAPS Subsequent License Renewal project.
If you have any questions, please contact Mr. David Distel, Licensing Lead, Exelon License Renewal Projects, at 610-765-5517.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 25th day of July 2019.
Respectfully submitted, Vice President - License Renewal and Decommissioning Exelon Generation Company, LLC
Enclosure:
A. Changes to the PBAPS Subsequent License Renewal Application cc: Regional Administrator - NRC Region I NRC Senior Project Manager (Safety Review), NRR-DMLR NRC Project Manager (Environmental Review), NRR-DMLR NRC Project Manager, NRR-DORL - Peach Bottom Atomic Power Station NRC Senior Resident Inspector, Peach Bottom Atomic Power Station R.R. Janati, Pennsylvania Bureau of Radiation Protection D.A. Tancabel, State of Maryland
July 25, 2019 Enclosure A Page 1 of 4 Enclosure A Changes to the PBAPS Subsequent License Renewal Application Introduction This Enclosure contains one change that is being made to the Subsequent License Renewal Application (SLRA) that was identified after submittal of the SLRA. For each item, the change is described and the affected page number(s) and portion(s) of the SLRA is provided. For clarity, entire sentences or paragraphs from the SLRA are provided with deleted text highlighted by strikethro1:1ghs and inserted text highlighted by balded italics.
July 25, 2019 Enclosure A Page 2 of 4 Underwater inspections not addressed in the Appendix B program descriptions for the ASME Section XI. Subsection IWF (B.2.1.31) and Structures Monitoring (B.2.1.34) programs Affected SLRA Sections: Appendix B, Sections B.2.1.31 and B.2.1.34 SLRA Page Numbers: B-179 and B-196 Description of Changes:
The SLRA Appendix B program description for the Inspection of Water-Control Structures Associated with Nuclear Power Plants (B.2.1.35) program includes a discussion of underwater inspections. The ASME Section XI, Subsection IWF (B.2.1.31) program and the Structures Monitoring (B.2.1.34) program also include underwater inspections; however, underwater inspections are not addressed in the SLRA Appendix B program descriptions for the ASME Section XI, Subsection IWF (B.2.1.31) and Structures Monitoring (B.2.1.34) programs.
Accordingly, SLRA Appendix B, Sections B.2.1.31 and B.2.1.34 are revised to address underwater inspections.
July 25, 2019 Enclosure A Page 3 of 4 SLRA Appendix B, Section B.2.1.31 on page B-179 is revised as shown below:
B.2.1.31 ASME Section XI, Subsection IWF Program Description The ASME Section XI, Subsection IWF aging management program is an existing condition monitoring program that consists of periodic visual examination of ASME Section XI Class 1, 2, 3, and MC piping and component support members for loss of material, loss of mechanical function, cracking, and loss of preload in air-indoor uncontrolled, air-outdoor, raw water, and treated water environments. Bolting for supports is also included with these components and inspected for loss of material and loss of preload by inspecting for missing, detached, or loosened bolts and nuts. The program utilizes procedures that are consistent with industry guidance to ensure proper specification of bolting material, lubricant, and installation torque to prevent or minimize loss of bolting preload or other loss of structural integrity. Indications of degradation are entered in the corrective action program for evaluation or correction to ensure the intended function of the component support is maintained.
Support members located underwater will not be accessible for evaluation with the same level of visual acuity as support members above water. Inspections will be implemented that establish the condition of these support members by using divers or by dewatering.
This program consists of periodic visual examination of piping and component supports for signs of degradation, evaluation, and corrective actions. The enhanced program implements additional inspections beyond the inspections required by the 10 CFR 50.55a ASME Code Section XI, Subsection IWF program. This consists of a one-time inspection of an additional five percent of the sample size specified in Table IWF-2500-1 for Class 1, 2, and 3 piping supports. This one-time inspection is conducted within five years prior to entering the second period of extended operation. For high-strength bolting in sizes greater than 1 inch nominal diameter, volumetric examination comparable to that of ASME Code Section XI, Table IWB-2500-1, Examination Category B-G-1 will be performed to detect cracking in addition to the VT-3 examination.
July 25, 2019 Enclosure A Page 4 of 4 SLRA Appendix B, Section B.2.1.34 on page B-196 is revised as shown below:
B.2.1.34 Structures Monitoring Program Description The Structures Monitoring aging management program is an existing condition monitoring program that consists of periodic visual inspection and monitoring the condition of concrete and steel structures, structural components, component supports, and structural commodities to ensure that aging degradation (such as those described in ACI 349.3R, ACI 201.1 R, SEl/ASCE 11, and other documents) will be detected, the extent of degradation determined and evaluated, and corrective actions taken prior to loss of intended functions. Quantitative results (measurements) and qualitative information from periodic inspections are trended with sufficient detail, such as photographs and surveys for the type, severity, extent, and progression of degradation, to ensure that corrective actions can be taken prior to a loss of intended function. The acceptance criteria are derived from applicable consensus codes and standards. For concrete structures, the program includes personnel qualifications and quantitative evaluation criteria of ACI 349.3R. Inspection frequency for the in scope structures will not exceed five years, with provisions for more frequent inspections when conditions are observed that have a potential for impacting an intended function. Unacceptable conditions, when found, are evaluated or corrected in accordance with the corrective action program.
The monitoring methods are effective in detecting the applicable aging effects and the frequency of monitoring is adequate to prevent significant age-related degradation to ensure there is no loss of intended function.
The Structures Monitoring aging management program was developed to implement the requirements of 10 CFR 50.65 and is based on NU MARC 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," and Regulatory Guide 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The program includes elements of the Masonry Walls (B.2.1.33) program and Inspection of Water-Control Structures Associated with Nuclear Power Plants (B.2.1.35) program.
Structural components located underwater will not be accessible for evaluation with the same level of visual acuity as structural components above water. Inspections will be implemented that establish the condition of these structural components by using divers or by dewatering.
Concrete structures are inspected for indications of deterioration and distress including evidence of leaching, loss of material, cracking, and a loss of bond, as defined in ACI 201.1 R.
Steel components are inspected for loss of material due to corrosion.