July 11, 2019

Mr. Joel P. Gebbie

Senior VP and Chief Nuclear Officer

Indiana Michigan Power Company

Nuclear Generation Group

One Cook Place

Bridgman, MI 49106

SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2NOTIFICATION

OF NRC BASELINE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000315/2019004; 05000316/2019004

Dear Mr. Gebbie:

On October 7, 2019, the U. S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection (Procedure 71111.08). This onsite inspection is scheduled to be performed

October 7, 2019, thru October 24, 2019.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups. The first group identifies information

necessary to ensure that the inspector is adequately prepared. The second group identifies

the information the inspector will need upon arrival at the site. It is important that all of these

documents are up-to-date, and complete, in order to minimize the number of additional

documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that

our regulatory contact for this inspection will be Mr. M. Ellet of your organization. If there are

any questions about this inspection or the material requested, please contact the lead inspector

Mr. M. Holmberg at 630-829-9748 or via e-mail at msh@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

J. Gebbie -2-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mel Holmberg

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Document Request for Inservice Inspection

cc: Distribution via LISTSERV

J. Gebbie -3-

Letter to Joel P. Gebbie from Mel Holmberg dated July 11, 2019.

SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2NOTIFICATION

OF NRC BASELINE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000315/2019004; 05000316/2019004

DISTRIBUTION:

Douglas Dodson

RidsNrrDorlLpl3

RidsNrrPMDCCook Resource

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML19192A155

OFFICE RIII

NAME MHolmberg:cl

DATE 07/11/19

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR INSERVICE INSPECTION

Inspection Report: 05000315/2019004; 05000316/2019004

Inspection Dates: October 7-24, 2019

Inspection Procedures: 71111-08, Inservice Inspection

Inspector: M. Holmberg, DRS

630-829-9748

A. Information for the In-Office Preparation Week

The following information is requested as an (electronic copy CD ROM if possible or

secure online source that can be accessed by the inspector) by September 16, 2019,

to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and a list of additional documents needed on-site from your staff. We request

that the specific items selected from the lists be available and ready for review on the

first day of inspection. The following information is applicable to Unit 2 unless otherwise

indicated. If you have any questions regarding this information, please call the inspector

as soon as possible.

1. For the upcoming outage, a detailed schedule and description of:

a. Non-Destructive Examinations (NDE) planned for Class 1 and 2

Systems and containment, performed as part of your American Society

of Mechanical Engineers (ASME) Code Inservice Inspection (ISI)

Program (include edition and addenda of Code committed to), and

NDE examinations planned for other systems performed as part of a

Risk-Informed ISI Program, or other augmented inspection programs

(e.g., ASME Code Case N-770-1 examination of dissimilar metal welds

and examinations to meet an industry initiative). For each weld

examination, include the weld identification number, description of weld

(component name), category, class, type of exam and procedure number,

and date of examination;

b. Reactor vessel upper head examinations required by Title 10 of the

Code of Federal Regulations (CFR), Part 50.55a(g)(6)(ii)(D) and Code

Case N-729-4;

c. Steam generator (SG) tube inspection and repair activities for the

upcoming outage or SG secondary side examinations 1;

1

Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG related information.

Enclosure

DOCUMENT REQUEST FOR INSERVICE INSPECTION

d. Welding on Code Class 1, 2, or 3 components; and

e. Planned baffle former bolt and edge bolt examinations as identified

in Westinghouse Nuclear Safety Advisory Letter 16-1 Baffle-Former

Bolts, Electric Power Research Institute (EPRI) MRP 2017-009 Letter

dated March 15, 2017 and MRP 2016-022 dated July 27, 2016.

2. A copy of the NDE procedures and welding procedures used to perform

the activities identified in Item A.1 (including NDE calibration and flaw

characterization/sizing procedures and Welding Procedure Qualification

Records). For ultrasonic examination procedures qualified in accordance

with Appendix VIII, of Section XI of the ASME Code, provide documentation

supporting the procedure qualification (e.g., the EPRI performance

demonstration qualification summary sheets).

3. A copy of ASME Section XI, Code Relief Requests applicable to the

examinations identified in Item A.1. This would include the U.S. Nuclear

Regulatory Commission (NRC) approved Relief Request for implementing a

Risk-Informed ISI Program (if applicable).

4. A copy of the 10-year ISI Program showing those required exams scheduled to

be performed this outage, and those which have been completed.

5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye

penetrant), which have identified relevant indications on Code Class 1 and 2

Systems since the beginning of the last refueling outage.

6. List with short description of the welds in Code Class 1 and 2 Systems, which

have been fabricated due to component repair/replacement activities since the

beginning of the last refueling outage and identify the system, weld number, and

reference applicable documentation (e.g., NIS-2 forms with definitions of system

and component acronyms).

7. If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the inspection period, provide a detailed description of the welds to

be examined, and the extent of the planned examination.

8. List with description of ISI and SG-related issues such as piping or SG tube

degradation or damage (e.g., cracks, wall thinning, wear) or errors identified

during piping/SG tube examinations that have been entered into your corrective

action system since the beginning of the last refueling outage. Also, include a list

of corrective action records associated with foreign material introduced/identified

in the reactor vessel, primary coolant system, steam generator or feed systems

since the beginning of the last refueling outage.

9. Copy of any 10 CFR Part 21 reports applicable to your structures systems or

components within the scope of Section XI of the ASME Code that have been

identified since the beginning of the last refueling outage.

2

DOCUMENT REQUEST FOR INSERVICE INSPECTION

10. Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage 1.

11. Copy of procedure containing screening criteria used for selecting tubes for in-

situ pressure testing and the procedure to be used for in-situ pressure testing 1.

12. Copy of previous outage SG tube operational assessment completed following

ET of the SGs (provide this document even if no SG ET is planned for current

outage).

13. Copy of most recent SG Degradation Assessment (provide this document even if

no SG ET is planned for current outage).

14. Copy of most recent SG Condition Monitoring Assessments1.

15. Copy of the document defining the planned SG ET scope (e.g., 100 percent of

unrepaired tubes with bobbin probe and 20 percent sample of hot leg expansion

transition regions with rotating probe) and identify the scope expansion criteria,

which will be applied. Also identify and describe any deviations in this scope or

expansion criteria from the EPRI Guidelines1.

16. Copy of the document describing the ET acquisition equipment to be applied

including ET probe types. Also identify the extent of planned tube examination

coverage with each probe type (e.g., rotating probe - 0.080 inches, 0.115 inches

pancake coils and mid-range + point coil applied at the top-of-tube-sheet plus

3 inches to minus 12 inches).

17. Provide procedures with guidance/instructions for identifying (e.g. physically

locating the tubes that require repair) and plugging SG tubes1.

18. Identify and quantify any SG tube leakage experienced during the previous

operating cycle. Also provide documentation identifying which SG was leaking

and corrective actions completed or planned for this condition.

19. Copy of current calculations for EDY, and RIY as defined in Code Case N-729-4

that establish the volumetric and visual examination frequency for the reactor

vessel head and J-groove welds.

20. Point of contact information (name and site number) for the following activities:

a. ISI - Site and vendor leads

b. Boric Acid Inspections and Evaluations

c. Reactor Vessel Head Inspection - Site and vendor leads

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG related information.

3

DOCUMENT REQUEST FOR INSERVICE INSPECTION

d. Baffle Former Bolt Inspection & Repairs - Site and vendor leads

e. SG Inspection - Site and vendor leads

B. Onsite Information to be Provided to the Inspector on the First Day of the

Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies

(e.g., Paper Records) of the Following Documents.

1. For welds selected by the inspector from Item A.1.d and A.6 above, provide

copies of the following documents:

a. Document of the weld number and location (e.g., system, train, branch);

b. Document with a detail of the weld construction (e.g., drawing);

c. Applicable portions of the Design Specification and applicable Code of

construction for the weldment (e.g., B31.1 or ASME Section III);

d. Applicable Code Edition and Addenda for weld procedure qualification;

e. Applicable weld procedures and weld data sheets used to fabricate the

welds;

f. Copies of procedure qualification records supporting the weld procedures;

g. Copies of welders performance qualification records;

h. Copies of mechanical test reports identified in the procedure qualification

records above;

i. Copies of the nonconformance reports for the selected welds;

j. Access to radiographs and equipment to view radiographs of the selected

welds;

k. ASME Code Section XI repair replacement plan and reconciliation for

replacement components/materials;

l. Certified Material Test Reports for replacement pressure boundary

materials; and

m. Copies of the nondestructive examinations required by the construction

Code and the pre-service examination records required by the ASME

Code Section XI for the selected welds.

2. For the ISI-related corrective action issues selected by the inspector from

Item A.8 above, provide a copy of the corrective actions and supporting

documentation.

4

DOCUMENT REQUEST FOR INSERVICE INSPECTION

3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems

selected by the inspector from Item A.5 above, provide a copy of the examination

records and associated corrective action documents. Updated schedules for

Item A.1 (including schedule showing contingency repair plans if available).

4. Copy of the procedures which govern the scope, equipment used, and

implementation of the inspections required to identify boric acid leakage

from systems and components above the vessel head.

5. Copy of:

a. Engineering evaluations/assessments of boric acid related deposits and

associated wastage or corrosion for safety significant components; and

b. Corrective action records for coolant leakage including boric acid deposits

on safety-related components identified since the beginning of the last

refueling outage.

6. Copy of the plant procedures used to perform inspections to identify reactor

coolant system leaks or boric acid deposits and the procedures for resolution of

leaks or boric acid deposits.

7. Fabrication Drawings (D size) of the reactor vessel welds (including vessel head

J-groove welds) if any are to be examined during the outage. Also provide any

drawings used by NDE vendors to locate these welds.

8. Copy of the documents which demonstrate that the procedures to be used

for volumetric examination of the reactor vessel head penetration J-groove

welds were qualified by a blind demonstration test in accordance with

10 CFR 50.55a(g)(6)(ii)(D).

9. Copy of volumetric, surface and visual examination records for the prior

inspection of the reactor vessel head and head penetration J-groove welds.

10. Provide a copy of the EPRI Examination Technique Specification Sheets and

vendor Examination Technique Specification Sheets related documents, which

support qualification of the ET probes to be used during the upcoming SG tube

inspections 1.

11. Provide a copy of the guidance to be followed if a loose part or foreign material is

identified in the SGs1.

12. Identify the types of SG tube repair processes which will be implemented for

defective SG tubes (including any NRC reviews/evaluation/approval of this repair

process). Provide the flaw depth sizing criteria to be applied for ET indications

identified in the SG tubes1.

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG related information.

5

DOCUMENT REQUEST FOR INSERVICE INSPECTION

13. Copy of document describing actions to be taken if a new SG tube degradation

mechanism is identified 1.

14. Provide document which defines the scope of SG secondary side examinations

(if any are planned) and identify site specific operational history related to

degradation of SG secondary side components (if any).

15. Provide procedures with guidance/instructions for identifying (e.g., physically

locating the tubes that require repair) and plugging SG tubes1.

16. Provide a copy of the document that identifies the scope of the Unit 2

baffle-former bolt and baffle-edge bolt inspection. Additionally, (when

available) provide the scope and schedules for baffle former bolt and if

required baffle-edge bolt repairs.

17. Provide a copy of the engineering change, work order and procedures used for

baffle former bolt replacement. Also provide vendor documents supporting

qualification of new equipment (e.g., if different vendor equipment is applied than

used during last Unit 2 outage) for this work.

18. Provide a copy of license basis analysis (and NRC acceptance review for this

analysis) for the Unit 2 baffle former assembly and provide a copy of applicable

vendor analysis completed to support inspections and/or anticipated repairs to

baffle former bolts.

19. Provide a copy of operability evaluations for the Unit 2 degraded baffle-former

bolts (if any were returned to service) and the degraded baffle-edge bolts.

20. Provide a copy of ARs related to baffle former bolts in Unit 2 issued since the

beginning of the previous Unit 2 outage.

21. Provide copies of the following standards at the onsite NRC inspection location

for the duration of the inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to the

ISI Program and the Repair/Replacement Program;

b. Copy of the performance demonstration initiative (PDI) generic

procedures with the latest applicable revisions that support site

qualified ultrasonic examination of piping welds and components

(e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-10, etc.);

1

Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG related information.

6

DOCUMENT REQUEST FOR INSERVICE INSPECTION

c. EPRI and industry standards referenced in the site procedures used to

perform the SG tube ET examination, which includes EPRI documents:

TR-107621-R1, Steam Generator Integrity Assessment Guidelines,

TR-107620-R1, Steam Generator In-Situ Pressure Test Guidelines,

SG Management Program: SG Integrity Assessment Guidelines, Part 10,

and 1003138, Pressurized Water Reactor Steam Generator Examination

Guidelines 1; and

d. Boric Acid Corrosion Guidebook Revision 1 - EPRI Technical

Report 1000975.

22. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if

required to access the NDEs selected by the inspector for observation.

If you have questions regarding the information requested, please contact the lead inspector.

1

Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur

and no further information is required for the items identified above requesting SG related information.

7