Ltr. 07/10/19 Point Beach Nuclear Plant, Units 1 and 2 - Notification of NRC Request for Information for Post-Approval Site Inspection for License Renewal - Phase IV; Inspection Report 05000266/2019010; 05000301/2019010 (DRS-J.Bozga)
ML19191A079
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/10/2019
From: John Bozga
Division of Reactor Safety III
To: Craven R
Point Beach
References
IR 2019010
Download: ML19191A079 (6)


See also: IR 05000266/2019010

Text

July 10, 2019

Mr. Robert Craven

Site Director

NextEra Energy Point Beach, LLC

6610 Nuclear Road

Two Rivers, WI 54241-9516

SUBJECT: POINT BEACH NUCLEAR PLANT UNITS 1 AND 2NOTIFICATION OF

NRC REQUEST FOR INFORMATION FOR POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWALPHASE IV; INSPECTION

REPORT 05000266/2019010; 05000301/2019010

Dear Mr. Craven:

On September 16, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an

inspection in accordance with Inspection Procedure 71003 Section 02.02.d. (Phase IV). This

onsite inspection is scheduled to be performed September 16, 2019, thru September 20, 2019.

The purpose of the inspection is to review the implementation of The Aging Management

Program (AMP) elements during the Period of Extended Operation. The inspection team will

select for review a sample of the sites AMPs.

This Request for Information is separated into three Sections (A, B and C). Section A

information will be used to facilitate the AMP sample selections. The team leader will make

AMP selections and inform the licensee. Based on these selections, the licensee will provide

the additional information requested under Section B. This information will be used as part of

the inspection preparation and implementation. Requests under Section C should be available

to the inspectors during the on-site week of inspection. See the table below for specific dates:

Requested Action: Expected Date:

Licensee provides Section A Information July 29, 2019

Team Leader communicates selection to the licensee August 9, 2019

Licensee provides Section B Information August 23, 2019

Licensee provides Section C Information September 16, 2019

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

It is important that all of these documents are up-to-date, and complete, in order to minimize the

number of additional documents requested during the preparation and/or the onsite portion of

the inspection.

R. Craven -2-

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be Brenda Scherwinski of your organization. If there

are any questions about this inspection or the material requested, please contact the lead

inspector John V. Bozga at 630-829-9613.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

John V. Bozga, Senior Reactor Inspector

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-266, 50-301

License Nos. DPR-24, DPR-27

Enclosure:

Document Request for License Renewal

Phase IV Inspection

cc: Distribution via LISTSERV

R. Craven -3-

Letter to Robert Craven from John V. Bozga dated July 10, 2019.

SUBJECT: POINT BEACH NUCLEAR PLANT UNITS 1 AND 2NOTIFICATION OF

NRC REQUEST FOR INFORMATION FOR POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWALPHASE IV; INSPECTION

REPORT 05000266/2019010; 05000301/2019010

DISTRIBUTION:

Douglas Dodson

RidsNrrDorlLpl3

RidsNrrPMPointBeach

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML19191A079

OFFICE RIII

NAME JBozga:cl

DATE 07/10/19

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR LICENSE RENEWAL PHASE IV INSPECTION

Inspection Report: 05000266/2019010; 05000301/2019010

Inspection Dates: September 9-13, 2019 (In-Office Prep)

September 16-20, 2019 (Onsite)

Inspection Procedures: 71003, Post-Approval Site Inspection for License Renewal

(Phase IV)

Lead Inspectors: John V. Bozga, Senior Reactor Inspector

Please provide the information requested below to the U.S. Nuclear Regulatory Commission

Region III Office in care of the lead inspector. The information can be provided in hard copy

or electronic format; however, electronic format is preferred, via digital data storage device

(i.e. DVDs/CDs).

A. Information Requested to Facilitate Aging Management Program Sample Selection

(1) Provide copies of corporate and/or site-specific program document/procedure

related to overall Aging Management Program (AMP).

(2) Provide a list of all site AMPs.

(3) Provide list of AMPs that were new or enhanced in the License Renewal

Application.

(4) Provide list of AMPs that had commitment changes since entering the Period of

Extended Operation (PEO).

(5) Provide list of AMPs that have incorporated newly identified systems, structures,

and components (SSCs) since entering the PEO. List or describe which SSCs

were incorporated.

(6) Provide list of AMPs that have incorporated components from One-Time

Inspection activities since entering the PEO.

(7) Provide any self-assessments and/or audits related to license renewal program

implementation and/or AMP effectiveness.

(8) Provide a list of corrective action documents that were initiated as result of

license renewal activities, self-assessments, and/or audits. (since entering

the PEO)

(9) Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, Technical Requirements Manual,

and Individual Plant Examination of External Events if available.

Enclosure

DOCUMENT REQUEST FOR LICENSE RENEWAL PHASE IV INSPECTION

(10) Site-specific responses and/or evaluations for U.S. Nuclear Regulatory

Commission generic communications associated with license renewal that were

issued after entering the PEO.

(11) Risk-ranking of top 250 basic events from your internal and external (if available)

events site specific probabilistic safety analysis sorted by Birnbaum Importance,

Risk-Reduction Worth, Risk-Achievement Worth, and Fussell-Veseley (as

applicable) (Provide in Excel format). Include basic event names/description.

(12) Provide a list of the top 10 risk important systems for the internal events model

(and external, if available).

B. Information Requested for each Aging Management Program Selected for Review

(As Applicable)

(1) Program basis documents and administrative procedures describing key program

attributes such as program objectives, scope, detection and monitoring methods,

administrative controls, acceptance criteria, corrective actions, and scope

expansion requirements.

(2) Provide a summary document listing which implementing procedures are

included in the selected AMP and what are their required performance frequency.

(3) Copies of implementing procedures for program activities (e.g., visual

examination procedures, ultrasonic examination procedures, maintenance

procedures, system walkdowns, etc.).

(4) Completed Work Orders for the most recent aging management activities

performed, including associated inspection and testing reports, as applicable.

This request is limited to the last two completed activities (per procedure). If this

request becomes too onerous based on the number of work order reach out to

the lead inspector for additional scope clarification.

(5) Copies of aging related corrective actions documents associated with the

selected AMP, and SSCs under its purview (for the last three years). A search

of corrective actions documents should include keywords such as: aging, age

management, degradation, wear, delamination, peeling, crazing,

chipping, leak, crack, corrosion, rust, leaching, embrittlement,

fatigue, blister, spalling, oxidation, loss of function, failed acceptance

criteria, flow-accelerated, or other site specific terms/codes used in aging

monitoring as appropriate.

(6) Updated license renewal scoping drawings showing the SSCs within the scope of

the AMP.

(7) Gap analyses performed (if any) to assess the differences between the current

AMP and the recommendations in the latest revision of NUREG-1801, Generic

Aging Lessons Learned (GALL), and subsequent Interim Staff Guidance.

2

DOCUMENT REQUEST FOR LICENSE RENEWAL PHASE IV INSPECTION

(8) Copy of evaluations performed for applicable external and internal operating

experience issues associated with license renewal. This request is limited to

operating experience items issued after entering the PEO.

(9) Description of instances where examination scope expansion was required

based on the examination of a SSC in accordance with the AMP. Please

describe the logic to select the scope expansion, and any resulting changes to

the AMP. (This request is limited to work performed in the PEO)

(10) Description of instances where AMP examinations/inspections were eliminated or

deferred. (This request is limited to work performed in the PEO)

(11) Description of instances where examination/inspection scope changes were

required based on limitations encountered during the examination. (This request

is limited to work performed in the PEO)

C. Information Requested to be available during the onsite week of inspection

(1) Provide a brief presentation (informal) to the inspection team regarding aging

management at the site. Topics to be covered:

a. How are aging related issue identified, documented and evaluated within the

corrective action program and/or other aging tracking software/program.

b. Describe which individuals and/or organizations are responsible for

identifying and evaluating aging related issues.

c. Describe the responsibilities regarding age management, if any, of the

following:

i. System Engineers

ii. AMP Owners

iii. Corporate office

Ideally, this should be presented Monday or Tuesday of the inspection week.

Coordinate with the team leader for further detail.

(2) Copy of simplified system drawings (a.k.a., Horse Notes or Training Notes).

(3) A computer with network access to the sites Corrective Action Program.

3