Correction Letter for License Amendments to Renewed Facility Operating Licenses Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High-Pressure Core Spray Diesel Generator
ML19179A284
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/22/2019
From: Bhalchandra Vaidya
Plant Licensing Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Vaidya B
References
EPID L-2018-LLA-0162
Download: ML19179A284 (6)


Text

UNITED STATES July 22, 2019 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear LaSalle County Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2- CORRECTION LETTER FOR LICENSE AMENDMENT NOS. 237 AND 223 TO RENEWED FACILITY OPERATING LICENSES RE: REMOVAL OF OPERATING MODE RESTRICTIONS FOR PERFORMING SURVEILLANCE TESTING OF THE DIVISION 3 BATTERY AND HIGH-PRESSURE CORE SPRAY DIESEL GENERATOR (EPID L-2018-LLA-0162)

Dear Mr. Hanson:

By letter dated June 24, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19121A505), the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendment Nos. 237 and 223 to Facility Operating License Nos. NPF-11 and NPF-18 for the LaSalle County Station (LSCS), Units 1 and 2, respectively. The amendments were in response to your application dated April 19, 2018, as supplemented by letters dated April 12, April 24, and May 23, 2019 (ADAMS Accession Nos. ML18157A123, ML19102A336, ML19114A420, and ML19144A168, respectively).

Due to an inadvertent error, the amendment issuance date on page 3 of the revised license pages for LSCS, Units 1 and 2, was missing. The corrected pages are enclosed with this letter and should replace the incorrect pages.

The correction does not change any of the conclusions in the safety evaluation associated with the amendments and does not affect the associated notice to the public.

B. Hanson If you have any questions, please contact me at 301-415-3308 or via e-mail at Bhalchandra.Vaidya@nrc.gov.

Sincerely, Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-37 4

Enclosure:

As stated cc: Listserv

ENCLOSURE LASALLE COUNTY STATION. UNITS 1 AND 2 REVISED LICENSE PAGES DOCKET NOS. 50-373 AND 50-37 4 Enclosure

Renewed License No. NPF-11 (3) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; Am.146 (4) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 01/12/01 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and Am. 202 (5) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 07/21/11 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station, Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

Am. 198 (1) Maximum Power Level 09/16/10 The licensee is authoriZed to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal).

Am.237 (2) Technical Specifications and Environmental Protection Plan 06/24/19 The Technical Specifications contained in Appendix A, as revised through Amendment No. 237, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the renewed license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Am. 194 (3) DELETED 08/28/09 Am. 194 (4) DELETED 08/28/09 Am. 194 (5) DELETED 08/28/09 Amendment No. 237 Correction Letter Dated 07/22/2019

Renewed License No. NPF-18 (2) Pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and Am. 189 (5) Exelon Generation Company, LLC, pursuant to the Act and 10 CFR Parts 07/21/11 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of LaSalle County Station. Units 1 and 2, and such Class B and Class C low-level radioactive waste as may be produced by the operation of Braidwood

. Station, Units 1 and 2, Byron Station, Units 1 and 2, and Clinton Power Station, Unit 1.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

Am.185 (1) Maximum Power Level 09116/10 The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3546 megawatts thermal). Items in Attachment 1 shall be completed as specified. Attachment 1 is hereby incorporated into this license.

Am.223 (2) Technical Saecifications and Environmental Protection Plan 06/24/19 The Technical Specifications contained in Appendix A, as revised through Amendment No. 223, and the Environmental Protection Plan contained in Appendix 8, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 223 Correction Letter Dated 07/22/2019