MONTHYEARML24005A0232024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports, Refueling Outage 25 CC1R25 ML24005A0242024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports, Refueling Outage 23 CC2R23 RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23160A0032023-06-0909 June 2023 Inservice Inspection Report ML21169A0352021-06-18018 June 2021 Inservice Inspection Report ML20363A1562020-12-17017 December 2020 Inservice Inspection Report ML20182A1622020-06-30030 June 2020 Proposed Alternative to Supplemental Position Indication Testing Interval NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 ML19249B9942019-09-0606 September 2019 Submittal of the Update to the Fifth Ten-Year Interval Snubber Inservice Testing Program Plan ML19200A0292019-07-16016 July 2019 Spring 2019 - 180 Day Steam Generator Report ML19169A0602019-06-13013 June 2019 Lnservice Inspection Report NMP2L2700, Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants2019-04-30030 April 2019 Co. - Submittal of Proposed Alternative to Utilize Code Case N-879 for Plants ML18354A4312018-12-19019 December 2018 Submittal of Relief Requests Associated with the Fifth Lnservice Inspection (ISI) Interval ML18192B9902018-07-0606 July 2018 Submittal of the Fifth Ten-Year Interval Inservice Testing Program for Safety Related Pumps and Valves ML18169A1492018-06-14014 June 2018 Inservice Inspection Report ML17159A5252017-06-0505 June 2017 Clavert Cliffs, Unit 1 - Inservice Inspection Report ML16243A4792016-08-29029 August 2016 CC1 R23 180-Day Steam Generator Tube Inspection Report ML16159A2982016-06-0606 June 2016 Inservice Inspection Report ML16012A4682016-01-0808 January 2016 Inservice Inspection Reports ML15314A0792015-11-0606 November 2015 Spring 2015 - 180 Day Steam Generator Report ML15239A2922015-08-25025 August 2015 Spring 2015 - 180 Day Steam Generator Report ML15160A3222015-06-0404 June 2015 Inservice Inspection Report, 2015 Owner'S Activity Report for RFO-20 Inservice Examinations ML14170A8922014-06-17017 June 2014 Inservice Inspection Report ML13168A3952013-06-13013 June 2013 Inservice Inspection Report ML12255A3902012-09-0707 September 2012 Inservice Inspection Report ML12178A4442012-06-25025 June 2012 Submittal of Inservice Inspection Report ML12032A2732012-01-31031 January 2012 Inservice Inspection Report Revision 01 (Unit 2) ML11147A0712011-05-25025 May 2011 Inservice Inspection Report, 2011 Owner'S Activity Report for RFO Inservice Examinations ML1017404372010-06-21021 June 2010 Inservice Inspection Report ML0916702682009-06-12012 June 2009 2009 Owner'S Activity Report for RFO-17 Inservice Examinations ML0900200972008-12-29029 December 2008 Submittal of Fourth Ten-Year Interval Inservice Inspection Program Plan and Request for Approval of Alternatives (Relief Requests) to American Society of Mechanical Engineers Code, Section XI ML0816503462008-06-11011 June 2008 Inservice Inspection Report ML0719804932007-07-0202 July 2007 Attachment 2, Pump and Value Inservice Test Program for Calvert Cliffs Nuclear Power Plant Unit 2 Fourth Ten Year Interval ML0719901302007-07-0202 July 2007 Attachment (3), Pump and Value Inservice Test Program Relief Requests for Calvert Cliffs Nuclear Power Plant Units 1 and 2 - Fourth Ten Year Interval ML0719701942007-07-0202 July 2007 Fourth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves ML0718300692007-06-27027 June 2007 Inservice Inspection Report ML0717201712007-06-20020 June 2007 Notification of Extension of the Inservice Test Program Third Ten-Year Interval ML0619800682006-07-10010 July 2006 Inservice Inspection Report ML0517200442005-06-14014 June 2005 Inservice Inspection Report for Calvert Cliffs Nuclear Power Plant Unit 2 ML0506107142005-02-25025 February 2005 2004 Steam Generator Tube Inspection Results Report ML0423304862004-08-0404 August 2004 Inservice Inspection Report ML0320300182003-07-18018 July 2003 Inservice Inspection Report ML0231900892002-11-12012 November 2002 Third Interval Inservice Inspection Program Relief Request No. RR-RI-ISI-2; Risk Informed Inservice Inspection (ISI) Program ML0226302882002-09-17017 September 2002 Inservice Inspection Report ML0215503412002-05-29029 May 2002 Third Interval Inservice Inspection Program Relief, Risk-Informed Inservice Inspection (ISI) Program ML0037360122000-07-25025 July 2000 Inservice Inspection Report 2024-01-05
[Table view] Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
Larry D. Smith Manager-Regulatory Assurance Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office www.exeloncorp.com larry.smith2@exeloncorp.com June 13, 2019 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Calvert Cliffs Nuclear Power Plant, Unit No. 1 Renewed Facility Operating License No. DPR-69 NRC Docket No. 50-318
Subject:
lnservice Inspection Report
Reference:
- 1. American Society of Mechanical Engineers, Boiler & Pressure Vessel Code, Section XI, Article IWA-6000 Pursuant to Reference 1, please find enclosed the lnservice Inspection Report for the Calvert Cliffs Nuclear Power Plant Unit 2.
There are no regulatory commitments contained in this letter.
Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.
Respectf u Ily,
~~~
~arry rJ. Smith Manager - Regulatory Assurance LDS/KLG/lmd
Enclosure:
(1) 2019 Owner's Activity Report for 2-RF0-22 lnservice Examinations cc: (Without Enclosure)
NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs NRC Regional Administrator, Region I D. A. Tancabel, MD-DNA
ENCLOSURE (1) 2019 OWNER 1S ACTIVITY REPORT FOR 2-RF0-22 INSERVICE EXAMINATIONS Calvert Cliffs Nuclear Power Plant June 13, 2019
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number CC2R23 Plant Calvert Cliffs Nuclear Power Plant Unit No. 2 Commercial Service April 1, 1977 Refueling Outage CC2R23 Date Number (if applicable)
ISi and Pressure Testing (PT) Fourth lnservice Inspection Interval -October 10, 2009 to June 30, 2019; Current Inspection Interval Containment lnservice Inspection Interval - September 9, 2009 to June 30, 2019 (1, 2nd, 3rd, 4th, other)
ISi and Pressure Testing Third lnservice Inspection Period - October 10, 2016 to June 30, 2019; Containment (GISI)
Current Inspection Period Third lnservice Inspection Period September 9, 2016 to June 30, 2019 (1", 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plans 2004 Edition, No addenda ISi- Rev. 00200 Dated August 19, 2015 and Rev. 00300 Dated January 28, 2019; PT - Rev. 00200 Dated Date I Revision of Inspection Plans October 23, 2014 and Rev. 00300 Dated January 28, 2019; GISI - Rev. 00100 Dated February 6, 2014 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used: N-460, N-504-4, N-513-3, N-513-4, N-526, N-532-4, N-552, N-552-1, N-561-2, N-562-2, N-566-2, N-586-1, N-593, N-593-2, N-613-1, N-616, N-619, N-624, N-638-6, N-639, N-641, N-643-2, N-648-1, N-653-1, N-664, N-686-1, N-705, N-716, N-722-1, N-729-1, N-729-4, N-739, N-731, N-733, N-747, N-751, N-753, N-762, N-770-1, N-770-2, N-773, N-786, N-786-1, N-789, N-798, N-800, N-805, N-823, N-825, N-845 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of CC2R23 conform to the requirements of Section XI (refueling outage number)
- - - - - ~ - - Signec1-zemenu*DemeKe=-*/~~~--~ ~ - ~ - - - - Date -GT\,;}fa,-~-~ .
Manager, CCNPP Nuclear Engineering Programs ~
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Maryland The Hartford Steam Boiler of Hartford, Connecticut and employed by Inspection and Insurance Co.
have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI By signing this certificate neither the Inspector nor his employer makes any warranty expressed or implied concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection
~ CJ " Comm;ss;oas NB 15304ANI, MD 1'!2B National Board, State, Province, and Endorsements
'spector's Signature)
Date b/JsJ/'\
FORM OAR-1 OWNER'S ACTIVITY REPORT Table 1 Items with Flaws or Relevant Condition that Require Evaluation for Continued Service
. Examination .. '.\'. ',
- ¢ateg9ry and"
'-,J, I.tern Description*. "
Ev;a1u*atici11 "t~~~cription ., *'
- Item Numb.er . *,
' .. .. ,: ' ','., ,,~
- ,. . *.:. ,'.*' ._, ',-,i .. ' * '
"\ *:
Evaluated through-wall leaks and thinned areas in accordance with Salt Water Cooling Piping Code Case N-513-4 (reference Operability Evaluation 18-001 (issue 0-A, 02.10 reports 04138657 and 04139053)).
Chemical and Volume Boric acid deposits on and adjacent to the valve bolting were evaluated Control Valve 2-CV-517 8-P, 815.10 as acceptable per Code Case N-566-2 (reference ECP-19-000120).
Bolting Boric acid deposits at penetrations 72 and 73 were evaluated to be acceptable as required by Code Case N-729-4, -3142 (reference issue report 04224776). The source of the deposits was determined to be a Reactor Vessel Closure Code Case misaligned flange at valve 2HVRC-104 that leaked prior to restart from Head 2SYS064 N-729-4, 84.30 the 2017 refueling outage based on radiochemistry analysis and boric acid deposit observations. There was no wastage or ferritic steel wall reduction observed.
Boric Acid was identified on the 21 B RCP Studs, Nuts, and Seal Bolting.
Reactor Coolant Pump Evaluation ECP-19-000297, performed per Code Case N-566-2, RCP-21 B Main Flange concluded that the BACC deposits identified on the 21 B RCP Studs, 8-P, 815.10 Studs and Nuts and Seal Nuts, and Seal Bolting do not present any plant equipment operability Housing Bolts issues and no corrosion or degradation was identified to warrant further investigation.
Reactor Vessel (RV)120-degree Core Stabilizing Lug Shim Lockpin was discovered protruding and bent from its installed location. Approximately Core Support Barrel 9/16" of the length of the pin is hollowed and has broken off. ECP B-N-3, 813.70 Snubbers 000129 conclu.9~cj_ tb.?t the snubb.eLlugwilLbe_ableJo_per:form-its--. - -*
. - . - - --- - - -- -~ *- - -- - - - - - - - - ------ -
intended safety function in the event of shim bolt/shim pin failures.
The 180-degree Core Support barrel (CSB) Alignment Key and key retaining pin was discovered to be slightly backed out. The result of this condition is that this one alignment key is no longer tight against the Upper Guide Structure keyway face in the CSB flange. ECP-19-000134 concluded that the gap Support Plate - (Top) & of the Core Barrel Alignment Keys in the Core Support Barrel Flange is B-N-3, 813.70 Keyways acceptable and that with the reactor internals assembled, there will be no potential for the key or retaining key pin to come loose.
FORM OAR-1 OWNER'S ACTIVITY REPORT Table 2 Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service
)i' _,,_,, "-... ' 'i' !':'<' '. ,, .--, '. ,* ':' '.':i,, '
- } <o~fe _,, ! *' ' J R&R: pj'~h ; '
'-' . IJ~~J>e$cr!p!io,r, 1-, .. * * :,P~~~rip~iq,h.t:>iW~r~ : , ,. . ,'* .,:cqmpletecf: ..: .. *:. \ :Number*-'
'\< *'*. .* . "*'
Performed full structural weld overlay Cold Leg Charging Inlet repair. Reference February 11, 2019 Dissimilar Metal Weld Letter from Exelon Generation 03/14/2019 2019-2-009 2-CV-2005-30 (Accession Number ML 19072AA096}
for Additional Information).
Removed dye penetrant indications by Shutdown Cooling Heat grinding. No welding was required and 2 Exchanger 21 SDCHX 03/01/2019 2019-2-008 the indications were determined to be Outlet Nozzle due to fabrication or handling damage.
Salt Water Cooling Replaced 8" nominal pipe size pipe Piping Spool Pieces 2- spool segments with stainless steel 2018-2-006 and 3 06/18/2018 MC6-2004 and 2-MC6- piping due to wall thinning and through- 2018-2-007 2018 wall leak.
Component Cooling 3 Heat Exchanger Replaced defective tubing. 03/05/2019 2018-2-063 2HXCC21 Salt Water Pump Replaced valve with spare due to 2017-2-043 and 3 Discharge Check Valve through-wall leak. Repaired/rebuilt 05/23/2018 2017-2-046 2CKVSW-103 removed valve.