Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML15223B2662015-08-0707 August 2015 Part 21 Report - Crane Nuclear Pressure Seal Valve with Retaining Rings ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12255A0542012-09-0707 September 2012 Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars ML12255A0532012-09-0707 September 2012 Part 21 Interim Report - Steam Generator Tube Wear ML1219103342012-07-0202 July 2012 USNRC 10CFR Part 21 Notification Regarding Potential Failures of Kraus and Naimer (K&N) M470 Spring Return Switches ML12109A0942012-04-13013 April 2012 Part 21 Interim Report - Steam Generator Tube Wear ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML1018900662010-07-0606 July 2010 Part 21 Report Concerning Failure of Oil-Filled Capacitor ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs 2019-07-11
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARNL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers ML22307A0602022-11-0303 November 2022 EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect ML20028D3802020-01-13013 January 2020 10CFR21 Notification for Ashcroft 2-1/2 & 3-1/2 1009, 63mm 2008, 63mm & 100mm 1008 Industrial Gauges, Weksler 3-1/2 Regal Gauges ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19168A0122019-05-31031 May 2019 Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML19158A1312019-05-31031 May 2019 Paragon Energy Systems LLC -10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners ML17340A3922017-11-28028 November 2017 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0119, Rev. 0 ML17333A3792017-11-21021 November 2017 Engine Systems, Inc. 10 CFR 21 Reportable Notification on a Power Supply (P/N 2938604) ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16125A3602016-04-26026 April 2016 Part 21 - Hydraulic Snubber Seal Material Deviation Interim Report ML15201A2872015-07-0808 July 2015 Crane Nuclear, Inc. - Part 21 Interim Report - Notification of Pressure Seal Valve Yoke Material Compliance ML15089A4372015-03-20020 March 2015 Part 21 - Dual Alarm Modules That May Contain Faulty Diodes in Single State Relays ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14169A0302014-06-15015 June 2014 Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 ML14094A4452014-04-0101 April 2014 Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems ML14069A4682014-03-0202 March 2014 Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML14071A4772014-02-26026 February 2014 Report of Potential Defect Per 1OCFR Part 21 Primary Disconnect Assembly ML14069A4672014-02-26026 February 2014 Part 21 Report Involving a Potential Manufacturing Defect in Replacement Masterpact Cradles ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13211A1682013-07-26026 July 2013 Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service Testing ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13073A1072013-03-12012 March 2013 Notification of Potential Part 21 Report - Defective Raw Material Used to Manufacture Valve Stems ML13063A4432013-03-0101 March 2013 10 CFR Part 21 Report Notification, Dual Alarm Modules and Single Alarm Modules ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12283A2432012-10-0505 October 2012 Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars ML12283A3022012-10-0505 October 2012 Part 21 Report Re Steam Generator Tube to Tube Wear Identified at San Onofre Nuclear Generating Station ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12255A0542012-09-0707 September 2012 Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars ML12255A0532012-09-0707 September 2012 Part 21 Interim Report - Steam Generator Tube Wear ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12157A3112012-06-0404 June 2012 Part 21 - Steam Generator Tube Wear Adjacent to Retainer Bars ML12157A3102012-06-0404 June 2012 Part 21 Interim Report - Steam Generator Tube Wear ML12121A5132012-04-19019 April 2012 Interim Report of Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) ML12121A5092012-04-19019 April 2012 Mitsubishi Nuclear Energy Systems, Part 21 Interim Report - Steam Generator Tube Wear ML12109A0942012-04-13013 April 2012 Part 21 Interim Report - Steam Generator Tube Wear ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations 2023-12-15
[Table view] Category:E-Mail
MONTHYEARML23335A0122023-12-0101 December 2023 FNP - IP95001 Inspection Notification and Request for Information (Email to Farley) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23095A0832023-04-0505 April 2023 NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) ML23086A0232023-03-24024 March 2023 NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23045A0782023-02-13013 February 2023 NRR E-mail Capture - Fyi - Revised Estimated Hours - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML23009A0062023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR ML23009A0152023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR ML23003A8092023-01-0303 January 2023 NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) ML22354A0112022-12-19019 December 2022 NRR E-mail Capture - Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-01 ML22348A0322022-11-30030 November 2022 NRR E-mail Capture - Request to Resume Endangered Species Act Section 7 Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22334A1482022-11-30030 November 2022 NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML22348A0532022-11-30030 November 2022 NRC to National Marine Fisheries Service (Nmfs), Request to Resume Endangered Species Act Consultation for Decommissioning of San Onofre Nuclear Generating Station, Units 2 and 3 ML22285A2532022-10-12012 October 2022 NRR E-mail Capture - Acceptance Review - Farley Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 ML22285A0082022-10-11011 October 2022 NRR E-mail Capture - Acceptance Review - Farley TS 4.3 LAR (L-2022-LLA-0138) ML22278A0182022-10-0404 October 2022 (SONGS) Unit 2 Reactor Head and Closure of Commitments Related to Peaceful Use of Foreign Technology- Acknowledge Receipt ML22265A2122022-09-22022 September 2022 Request for Additional Information for Exemption Request from 100m 72.106(B) Requirement, Docket Nos 50-206, 50-361, and 50-362 ML22229A4792022-08-15015 August 2022 HP Baseline Inspection Document Request ML22213A2692022-08-0101 August 2022 NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specification 3.4.10, Pressurizer Safety Valves ML22123A1802022-05-0303 May 2022 NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22123A1782022-05-0303 May 2022 NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22119A2422022-04-29029 April 2022 Riv FOLLOW-UP Response: Question About April 11 San Onofre Event ML22112A0892022-04-22022 April 2022 NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22034A9962022-02-0202 February 2022 S. Morris Response to C. Langley-Questions About Moving Snf at San Onfre ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22020A0662022-01-13013 January 2022 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-269-A LAR (L-2021-LLA-0234) ML22012A0632022-01-11011 January 2022 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TS 5.5.16 LAR (L-2021-LLA-0235) ML22010A2402022-01-10010 January 2022 NRR E-mail Capture - Farley 1 and 2 - Acceptance of Requested Licensing Action Revise TS 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML21280A1022021-12-0606 December 2021 NRC to NMFS, Supplement to Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21321A3772021-11-16016 November 2021 NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21321A3752021-11-10010 November 2021 NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal ML21292A1562021-10-19019 October 2021 NRR E-mail Capture - Acceptance Review - SNC Operating Fleet TSTF-554 LAR ML21274A0462021-10-0101 October 2021 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-577 LAR (L-2021-LLA-0163) ML21242A0602021-09-30030 September 2021 NRC to NMFS, Request to Initiate Consultation for SONGS Decommissioning ML21277A2342021-09-30030 September 2021 NMFS to NRC, Receipt of Request to Reinitiate Endangered Species Act Consultation for San Onofre Decommissioning ML21236A3142021-08-24024 August 2021 NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Remove Sump Recirculation Valve Encapsulation ML21180A2002021-06-28028 June 2021 NRR E-mail Capture - Acceptance Review - Farley and Vogtle - Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System (L-2021-LLA-0109) ML21174A1182021-06-23023 June 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet - Remove Table of Contents LAR (L-2021-LLA-0115) ML21174A1152021-06-23023 June 2021 NRR E-mail Capture - Acceptance Review - Farley and Vogtle Exemption Requests from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (L-2021-LLE-0031) ML21132A0132021-05-11011 May 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet QATR Reduction in Commitment Licensing Action - L-2021-LLQ-0002 ML21105A0132021-04-14014 April 2021 NRR E-mail Capture - Acceptance Review - SNC Fleet LAR to Change TS 5.7, High Radiation Area (L-2021-LLA-0052) ML21117A3492021-03-30030 March 2021 March 30, 2021, Email from Public Watchdogs on Providing New Information to Its October 13, 2020, 2.206 Petition ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21068A2712021-03-0909 March 2021 Request for Additional Information Regarding Biological Opinion - SONGS- EPID L-2021-LLL-0006 ML21012A3242021-01-12012 January 2021 NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors 2023-08-31
[Table view] |
Text
Hoc, HOO X From: Ray Chalifoux <RChalifoux@ParagonES.com>
Sent: Friday, May 31, 2019 2:27 PM To: Hoc, HOO X
Subject:
[External_Sender] 10 CFR Part 21 Report of Defect GS2 Terry Turbine Intro! Positioners Attachments: Intro! Part 21 PN 890265-010.pdf Follow Up Flag: Follow up Flag Status: Flagged Per Subject and Attachment
. . /'"'<-A'\ R. A. Chalifoux I Vice President Quality Assurance 777 Emory Valley Road, Oak Ridge, Tennessee, 37830 Paragon P: (865) 384-0124 I C: (865) 384-0124 RChalifoux@Pa rag on ES. com I www. Pa rag on ES. com Coiiflctemiality Mote. 'fhe infonnation contaiaea in tniJ tnC.'J!lttgc Ettfls ~88R.Ht8ms~ is 8iiJM.iH88Mtis.1 &Ma m~r 88 ,I legally privileged. t'he message is intended solely Ml the ttdttteSSB@Es~. If yew 8F8 M8t tR.8 iRt8M:8B8 PB8i~i8M:t, y@tt
_,l) ttte hereby noti0ed that any _u~e, dissemination, 01 tcproduction is strietly ~rnhibitcd and may b: unlawful. If
'i,{' Joa me ao.t the mtcmletl 1ee1_rnent plcMc centaet the sentlet ey retttPH e 1ntt1l tma nCJttey all coptcs of titc Otiginafnicssagc ttfltt MtftBhmBMltt. e.elt,iOf/e.J re.r .J..e.t...p,'1,le, CJ,n(lef;tt:(hNI GA.J{-/1a
- I!... A , c~" 1; a" .,. °"' '-;:1/ 2° 'i 1
May 31, 2019 Document Control Center U.S. Nuclear Regulatory Commission.
Washington, DC 20555
Subject:
10 CFR Part 21 Report of Defect GS2 Terry Turbine Intro! Positioners To whom this may concern:
a) Individual informing NRG and address:
Ray Chalifoux Paragon Energy Solutions LLC 777 Emory Valley Road Oak Ridge, TN 37830 b) Basic component supplied which contains a defect:
GS2 Terry Turbine Intro! Positioners P/N: 890265-01 O c) Supplier of the Basic Component:
ATC-Nuclear (now Paragon Energy Solutions, LLC) d) Nature of defect:
-- ---*-lntroi,*Positioners-used**by*statrons* in-8*S2-rerry--Turbintrcontroi**ap*piicaUor1s.. have*-tn*e* p*otentiai-to*. -****-* *--~---- -*-**- **- * -
contain a latent defect. The defect is the result of internal corrosion which has been identified in Tl Operational Amplifiers Part No.TL084CN on the SL3EX Controller Boards of the turbine throttle valve positioner. It is believed the likely cause is associated with the ingress of solder flux into the IC Chip package on the controller board due to delamination caused by the soldering process during fabrication. The corrosion over time can result in intermittent open circuiting and high resistance in the aluminum metallization. Chlorine ionic contamination can also result in high ..
leakage current? within the component circuitry. Failures may be manifested by a reduced valve position signal disproportional to the expected demand condition, no actuation signal i.e. throttle valve remaining full open, or other anon.,alous unexpected behavior.. There are three TL084CN chips on each SL3EX Controller Board within the positioner assembly. There have been two documented failures to date occurring in 2015 and 2019 in installed systems.
e) Date determination made:
May 29, 2019 f) Number and location of these components:
Attachment 1 identifies positioners provided to stations. Positioners provided to Farley Station and SONGS were not dedicated by ATC-Nuclear.
g) Corrective action taken:
Paragon Energy Solutions replaced the TL084CN Chips on the failed positioner as directed by Curtiss-Wright SAS and the Licensee. Curtiss-Wright SAS has identified the list of Intro! Positioners provided to licensees.
h) Any advice related to the defect:
Licensees should coordinate through Curtiss-Wright SAS (formerly Dresser Rand) to implement repair strategies.
Additional Background ATC-Nuclear (now Paragon Energy Solutions) originally dedicated 35 lntrol assemblies from 2011 to 2013 for Dresser Rand (now Curtiss-Wright SAS) as part of a terry turbine digital control system upgrade utilizing the Intro! Positioner product line. Recently, Paragon was contracted by Curtiss-Wright SAS under Purchased Order 17029549 to evaluate a Shearon Harris positioner failure. Two units were provided to Paragon under the purchase order listed above for evaluation. The licensee assembly, S/N 01046M13, was installed and had been in service at the station since October 2016. This unit failed prompting this evaluation. Following identification of the failure as described above, corrosion internal to other TL084CN Chip packages in the second positioner provided by Curtiss-Wright SAS was identified. This positioner, however, did not fail and continued to operate normally. A previous failure of a TL084CN Chip was also identified in 2015.
- The analyses and evaluations performed by Paragon do not consider purchasers and/or licensee application-specific information as it only focuses on the functional performance of the positioner. On this basis, Paragon does not have the capability to complete the 10CFR Part 21 evaluation to determine whether the condition reported could cause a substantial safety hazard. This notification serves to inform purchaser(s) and/or affected licensees of this determination, so they may evaluate the identified condition, pursuant to §1 OCFR 21.21 (a).
Stations are advised to work directly with Curtiss-Wright SAS via the technical contacts below.
Randy F. lantorno Project Manager, T: 585.596.3831, M: 585.596.9248, email riantorno@curtisswright.com or Justin Pierce 585.596.3866, email jpierce@curtisswright.com
-~ (1J. j L ...I.
Ray&iaifu~ Paragon ES T: 865.384.0124 or email rchalifoux@paragones.com
- Affected Facilities Client/ End User 3rd Party Engineering Description.: Turbine Serial cw Shipment Year Installed/
HPCI/RCIC Aux # Project# Commisioned Firm Alabama Power Bechtel GS-2-Aux 37858A 343670 January-OS May-10 Farley Alabama Power Bechtel GS-2-Aux 37858B 343670 January-OB May-10 Farley Southern California Bechtel GS-2-Aux 40101A 375259 June-09 January-10 Edison
- Aux 40101B 375259 June-09 January-10 Edison
- SONGS Engineering GS-1 RCIC 35939A 478937 September-15 October-18 Cooper/ NPPD Solutions CNAT / Almaraz GS-2-Aux 38467A 501197 March-15 July-17 CNAT / Almaraz GS-2-Aux 38467B 501197 March-15 January-17
-** -- ----- -- - . - - --- *~-- -- - -~-
To Be Engineering GS-2 RCIC 38187A 513114 December-12 Determined Clinton Solutions Duke Energy I Engineering GS-2-Aux 41056A C34778 December-14 October-16 Shearon Harris Solutions Wolf Creek Hurst Technologies GS-2-Aux 40177A C34590 December-12 March-13 NEXTERA ENERGY Sargent Lundy GS-2-Aux D6729 C34587 September-13 September-14 Point Beach NEXTERA ENERGY Sargent Lundy GS-2-Aux D6730 C34587 September-13 September-14 Point Beach To Be Bechtel GS-1 RCIC 36681A 142513 March-16 Determined Georgia Power Hatch To Be Bechtel GS-1 RCIC 37121A 142513 March-16 Determined Georgia Power Hatch Tennessee Valley Engineering GS-2AUX 38677A 146320 January-17 April-17 Authority WB-1 Solutions Tennessee Valley Engineering GS-2AUX 386778 146320 May-17 November-17 Authority WB-2 Solutions
Tennessee Valley October-19 Engineering GS-2AUX 37480A 160361 August-18 Authority SQ-1 (Scheduled)
Solutions Tennessee Valley April-20 Engineering GS-2AUX 37480B 160361 September-18 Authority SQ-1 (Scheduled)
Solutions I
!