MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
10 CFR 50.59 / 10 CFR 72.48 Palo Verde Nuclear Generating Station P.O. Box 52034 102-07926-MDD Phoenix, Arizona 85072-2034 May 30, 2019 Mail Station 7636 623-393-3495 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station Units 1, 2, 3 and Independent Spent Fuel Storage Installation Docket Nos. STN 50-528, 50-529, 50-530, and 72-44 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports Enclosed please find the Arizona Public Service Company (APS), title 10 of the Code of Federal Regulations (10 CFR) 50.59, 10 CFR 72.48 and Commitment Change reports for January 1, 2018, through December 31, 2018.
In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summary of the evaluations required by 10 CFR 50.59(d)(1) for each change completed during the period. contains a report of the evaluations written during 2018, regardless of the implementation status of the evaluated action.
In accordance with 10 CFR 72.48(d)(2), APS is reporting that there was no change completed during the period that was required to be reported pursuant to 10 CFR 72.48.
In accordance with the APS commitment management program, APS is reporting one NRC commitment change made during the referenced time period as described in Enclosure 2 to this letter. Other commitment changes made during 2018 that were reported in separate correspondence are not included in Enclosure 2.
No new commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-3495.
Sincerely, Dilorenzo, Michael Digitally signed by Dilorenzo, Michael D(Z99838)
D(Z99838) DN: cn=Dilorenzo, Michael D(Z99838)
Date: 2019.05.30 14:03:03 -07'00' Michael, D. DiLorenzo Department Leader, Nuclear Regulatory Affairs MDD/TMJ/mg
Enclosure:
- 1. 10 CFR 50.59 and 10 CFR 72.48 Reports, January 2018 - December 2018
- 2. Commitment Change Reports, January 2018 - December 2018 A member of the STARS Alliance LLC Callaway
Enclosure 1 10 CFR 50.59 and 10 CFR 72.48 Reports January 2018 - December 2018
Enclosure 1 PVNGS 10 CFR 50.59 and 10 CFR 72.48 Reports (January 2018 through December 2018)
Log Doc Doc Number Description Summary Type 50.59 SDOC SDOC N001-1900- It addresses changes to radiological consequences This change does not E-17-0002 CALC 01394 design analyses resulting from the Westinghouse require prior NRC Rev. 000 EDC SDOC N001-0205- Next Generation Fuel (NGF) modification. The approval in DMWO 00154 NGF modification will be implemented under accordance with CALC 13-NC-ZY-0251 DMWO 4557156 and will replace Current Value 10 CFR 50.59(c)(1).
EDC 2015-00633 for Added Fuel with new Westinghouse NGF.
CALC 13-NC-ZY-0263 Note: NGF has been approved by the NRC safety evaluation, see ML17319A107.
50.59 DMWO DMWO 4411244 It addresses installation of Open Phase Protection This change does not E-18-0001 LDCR LDCR 15-B011, 15- System monitoring and detection for each of require prior NRC Rev. 000 F029 PVNGS three non-class 1E start-up transformers approval in to identify an open phase condition. accordance with 10 CFR 50.59(c)(1).
Note: There was no 10 CFR 72.48 change completed during the 2018 period that required to be reported Acronyms/Abbreviation List CALC - Calculation DMWO - Design Modification Work Order EDC - Engineering Document Change LDCR - Licensing Document Change Request SDOC - Supplier Document Page 1 of 1
Enclosure 2 Commitment Change Reports January 2018 - December 2018
Enclosure 2 COMMITMENT CHANGE 18-C001 Commitment Number: Regulatory Commitment Tracking System Action Item (RCTSAI) 12022 Source Document:
Engineering Evaluation 18-01941-004 Existing Commitment
Description:
Provide Preventative Maintenance (PM) tasks for Calibration of the Class 1E Switchgear Undervoltage (UV) and Diesel Generator Protective Relays every two years.
Revised Commitment
Description:
Provide PM tasks for calibration of the Emergency Diesel Generator (EDG) protective relays that are bypassed in the emergency mode every four years (4A). Calibration PM tasks for the Class 1E Switchgear UV and Diesel Generator Protective Quality Related (Q) Relays will remain at every two years (2A).
Justification of Change:
Reason for the change:
Based on the following, the modification of RCTSAI 12022 to allow a calibration interval of 4A for the EDG generator protective relays that are bypassed in the emergency mode should be approved:
- Bypassed during EDG emergency mode operations and have no impact to EDG safety function
- Protective relays are for equipment protection only during testing which is about 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />s/year
- Any minor expected increase drift from setpoint between calibrations resulting from an increase PM interval will not impact equipment protection if trip functions are maintained
- Performed reliably in-service over an extended period at PVNGS
- Within industry PM guidelines for electro-mechanical style generator protective relays The Generator Differential (87) protective relay is Class Q, is an emergency mode trip and can cause a loss of EDG safety function, therefore, its calibration interval shall remain at current 2A.
Page 1 of 1